Key takeaways from this article

  • Group A companies (medium and high voltage) can migrate to the free energy market with no minimum consumption, with a potential savings of up to 20% since the opening in 2024.

  • The migration process takes about 6 months in 7 steps, which include consumption analysis, registration with CCEE (Electric Energy Commercialization Chamber) and meter installation, with centralized management by the retailer.

  • Contracts in the ACL offer fixed price, budget predictability and renewable energy with I-RECs, which eliminates the impact of tariff flags and reduces surprise bill risks.

  • Mistakes such as underestimating consumption analysis or ignoring contractual deadlines are common, but specialized support reduces these risks and ensures continuity and measurable results in digital dashboards.

  • Serena Energia conducts the full migration with no additional management cost, with certified wind energy and potential savings of up to 20%. Request your free analysis to assess your company's scenario.

Prerequisites and initial conditions

The migration process starts with checking three points: the company must belong to Group A (medium and high voltage), have the latest electricity bill for consumption analysis of the last 12 months, and keep legal and financial documentation up to date. Note that, unlike what many believe, there is no minimum consumption to enter the free energy market, and the mandatory technical criterion is to be part of Group A.

Serena Energia conducts a free feasibility analysis, which assesses the consumption profile and projects potential savings. This analysis considers seasonality, demand peaks, and business characteristics to indicate whether migration is likely to generate consistent financial gain.

Request your free eligibility analysis with our consultants and confirm if your company is ready to migrate.

Process overview

With the prerequisites confirmed, the company is ready to start the migration. The entry process into the free energy market involves 7 main phases: eligibility verification, detailed consumption analysis, choice of retailer, registration with CCEE (Electric Energy Commercialization Chamber), contract negotiation, meter system installation, and continuous results monitoring.

These phases occur in an evolving regulatory environment, with gradual market opening. The table below shows how this opening has been progressing and what is planned up to 2028.

Year

Opening phase

Status 2026

2024

Opening for medium voltage

Implemented

2025-2026

Market consolidation

Ongoing

Until 2028

Opening for low voltage (optional)

Planned

Serena Energia manages this process with no additional management cost, taking on the bureaucratic and technical steps so the company can focus on its core activities.

Step-by-step guide: how to migrate to ACL in 7 steps

1. Verify Group A eligibility
The first step is to confirm whether the company is connected at medium or high voltage. This information appears on the electricity bill, usually identified as “Group A”. Industrial companies, large retailers, and corporate buildings usually fall into this category.

2. Analyze the consumption profile in detail
With eligibility confirmed, the next step is to understand how the company consumes energy. Mapping monthly consumption in kWh over the last 12 months helps identify seasonality, demand peaks, and usage patterns. This data guides the choice of contract type and indicates the real savings potential in the free energy market.

3. Choose Serena Energia as the retailer
The choice of retailer defines the quality of management and supply security. Serena Energia, with 15 years of experience and a position among the largest wind and solar energy generators created in the Americas, offers predominantly wind energy in the free energy market. The company has its own operational plants, which reinforces supply security and price competitiveness, and offers free managed migration for clients under its management, assuming bureaucratic risks.

Landscape of a renewable energy park at sunset, showing large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the Free Market supply.

Discover our personalized proposal by speaking with a Serena specialist and evaluate specific conditions for your consumption.

4. Register with CCEE
Registration with CCEE is mandatory to participate in the free energy market, as without this registration the company cannot legally operate in the ACL. Under normal conditions, this process requires sending technical, legal, and financial documentation directly to CCEE. Serena Energia handles this step for clients under its management, eliminating the need for direct interaction with the chamber and reducing internal complexity.

5. Negotiate a fixed-price contract
With the registration submitted, the company can move forward to contract negotiation. Contracts in the free energy market set long‑term fixed prices, which brings budget predictability. Serena Energia negotiates contracts that generate savings of up to 20% compared to the captive market, based on the consumption profile analyzed in step 2.

6. Install the measurement system
The next step is meter adaptation. The free energy market requires hourly measurement to record consumption accurately and allow correct settlement in CCEE. Serena Energia is responsible for installing the necessary equipment, included in the previously mentioned free management, ensuring technical compliance and integration with the billing process.

7. Monitor results on the Serena dashboard
After the start of supply in the ACL, the focus shifts to tracking results. Serena Energia's digital dashboard shows monthly bill savings, consolidated savings, bill breakdown with comparison between captive and free energy markets, monthly consumption forecast, and consumption realized to date.

To contextualize the indicators tracked on this dashboard, the table below summarizes the structural differences between the captive market and the free energy market.

Aspect

Captive market

Free energy market

Predictability

Subject to tariff flags

Contractual fixed price

Savings

Regulated prices

Up to 20% (as per 2024 opening)

Sustainability

National energy mix

Predominantly wind energy with certification

Silhouette of several wind turbines aligned along the coast during a colorful sunset, with reflections on the water.
Exploiting natural resources, such as coastal winds, is essential to maintain the scale and sustainability needed in the Free Energy Market.

Common mistakes and solutions

Even when following the step-by-step, some companies make mistakes that reduce savings or delay the start of supply. The main issues involve underestimating consumption analysis, ignoring the termination deadlines of the current contract, and fearing, unnecessarily, supply interruptions. Serena Energia reduces these risks through detailed technical analysis, full deadline management, and guaranteeing supply continuity throughout the transition.

Another frequent mistake is hiring retailers without their own generation backing, which can compromise supply security and price competitiveness. As mentioned earlier, Serena Energia has its own operational plants, which reduces this risk. To support decision‑making, the company provides a checklist that guides the verification of each migration step and the criteria for choosing a retailer.

Side profile of a worker in a wind farm, with the sun in the background and several wind turbines stretching across the horizon.
The dedication of qualified field professionals is what ensures the efficiency and constant availability of clean energy that drives our clients' businesses.

Get specialized guidance to avoid migration mistakes by contacting us now.

Results verification and metrics

Financial results appear already on the first invoice after migration. The company can compare the price per kWh with the period it was in the captive market to validate the economic benefits. In addition to savings, Serena Energia provides Renewable Energy Certificates (I-RECs), which are essential for sustainability reporting and ESG goals, and whose operation is detailed in the FAQ section.

The Serena monitoring dashboard allows tracking monthly savings, consumption realized versus forecast, and avoided CO₂ emissions, which facilitates the management of internal goals and accountability to stakeholders.

Advanced options and next steps

After consolidating the basic migration and validating the results, companies with multiple units or more ambitious environmental goals can move on to additional solutions. For organizations with several locations, Serena Energia offers load aggregation, which allows combining the consumption of different units into a single contract. The company also provides carbon credits to offset emissions from other sources and complete the sustainability strategy.

Companies seeking more sophisticated management can consider contracts with demand modulation, participation in energy auctions, and other structured purchasing formats. Serena Energia's retail model integrates these possibilities into standardized products, with full management, so the company does not need to set up an internal dedicated area for the topic.

Frequently Asked Questions

What is the free energy market in practice?

The free energy market allows Group A companies to choose their energy supplier and negotiate price, term, and energy source. The local distributor remains responsible for physical delivery through the grid, while the purchase of energy is made from a retailer such as Serena Energia, which generates savings and predictability.

What is the minimum requirement to migrate to the ACL?

As described in the prerequisites, the technical requirement is a medium or high voltage connection, i.e., belonging to Group A. For companies that do not directly qualify, there is the possibility of load aggregation with other units. Serena Energia conducts a free eligibility analysis to assess each case.

Does the migration pose risks of supply interruption?

The migration does not change the distributor's responsibility for the grid, so the risk of additional interruption is nil. The process is commercial and contractual, and the local distributor continues to provide the energy delivery service and ensure grid quality. The only change is who sells the energy, which becomes a retailer such as Serena Energia.

How long does the complete migration process take?

The regulatory process takes about 6 months, mainly due to the notice periods of the current contract with the distributor. Serena Energia coordinates all stages at no additional management cost. Starting the planning early allows the savings to begin as soon as possible.

How do I-RECs work for sustainability?

I-RECs (International Renewable Energy Certificates) are certificates that verify that each MWh consumed came from a renewable source. Serena Energia issues these certificates to its clients, which allows declaring 100% renewable consumption in sustainability reports and meeting ESG goals in an auditable way.

A single white wind turbine stands out amidst a dense layer of fog or clouds, illuminated by the soft light of the sunset.
Advanced wind technology allows Serena Energia to capture constant winds at high altitudes, ensuring a clean, stable, and efficient energy source for your business.

Conclusion

Migrating to the free energy market represents a strategic opportunity for medium-sized companies to reduce operational costs and advance sustainability. With Serena Energia, the company gains the savings described above, budget predictability, and 100% renewable energy, directing more resources toward business growth.

Simulate your discount with Serena Energia and see how much your company can save on the electricity bill.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *