Financial analysis for SMEs: energy as a strategic cost

Written by: André Lima, Growth, Serena Energia
Key takeaways from this article
-
Treating electricity as a strategic variable, rather than a fixed expense, makes the financial analysis of Group A SMEs more comprehensive.
-
Treating energy as a variable cost allows stabilizing the break‑even point and improving cash flow predictability when migrating to the free energy market.
-
In 2026, tariff adjustments above inflation and short‑term market price fluctuations make energy the last major variable cost still not addressed strategically.
-
Signing a fixed‑price contract in the free energy market eliminates the unpredictability of tariff flags and can reduce the bill by up to 30%.
-
Turning energy into the last controllable variable cost with Serena Energia is a financial decision: talk to one of our consultants.
1. The 4 pillars of financial analysis for SMEs
Structured financial analysis rests on four pillars. Each pillar gains an additional dimension when the company treats energy costs as a strategic variable, rather than an immutable fixed expense.
-
Operational cost control (OPEX): detailed mapping of all recurring expenses reveals the real weight of electricity. Energy can represent a significant portion of expenses for Group A companies (medium and high voltage). Therefore, it deserves its own line in the income statement, with monthly history and scenario projections.
-
Cash flow predictability: the ability to accurately estimate inflows and outflows supports short‑ and medium‑term planning. Tariffs with variable flags reduce this accuracy, as energy cost changes month to month without a direct link to production volume.
-
Break‑even analysis: the calculation of the minimum revenue needed to cover all fixed and variable costs depends on the energy cost. When the company locks this cost in a contract, the break‑even point becomes more stable and reliable as a management tool.
-
Operating margin: the difference between net revenue and total operating costs directly reflects the energy cost. Documented reductions in this cost flow directly into the margin, without needing to raise prices or sales volume.
These four pillars form the basis of the monthly method described in the following sections.
2. 3 examples of financial indicators that change with migration
Migration to the free energy market produces measurable effects on indicators that the CFO already monitors. The table below compares three of these indicators before and after migration.
|
Indicator |
Before migration |
After migration |
Source |
|---|---|---|---|
|
Cash flow predictability |
Low, with energy cost varying due to tariff flags and annual adjustments above inflation |
High, with energy price fixed in a long‑term contract, which eliminates flag fluctuations |
|
|
Break‑even point |
Unstable, with variable energy cost rising during water scarcity periods and raising the break‑even |
More stable, with the energy component of the break‑even no longer fluctuating with climatic conditions due to the fixed price |
|
|
Operating margin |
Pressured, with tariff adjustments projected at an average of 8% in 2026, above the IPCA |
Improved, with migrated companies recording drops of 15% to 30% in the energy bill |
These three indicators already justify a migration feasibility analysis for any Group A SME. Among them, the break‑even point deserves special attention, as it is the most energy‑cost‑sensitive indicator and the simplest to stabilize with a fixed‑price contract.
3. How to calculate the break‑even point, including energy costs?
The break‑even point is calculated by dividing total fixed costs by the unit contribution margin. When the company treats electricity as a variable cost, which is technically correct for operations whose consumption fluctuates with production, this cost enters the denominator of the formula and directly affects the result.
In the regulated market, the cost per MWh changes with tariff flags. This means the break‑even calculated in January can become outdated by March, when a red flag raises the tariff. Financial planning then depends on a data point the company does not control.
With a fixed‑price contract in the free energy market, the cost per MWh is known in advance for the entire contract period. The break‑even calculated at the start of the year remains valid throughout the months and becomes a more reliable management tool.
To apply this calculation in practice, the controller should follow a simple sequence. First, separate the energy cost into its own line in the income statement, with a 12‑month history. This separation makes the oscillation pattern caused by tariff flags visible.
Next, calculate the average cost per MWh over the last 12 months, including flag surcharges. This value serves as a reference for scenario comparison.
Then, project the annual cost with and without migration, using the contract’s fixed price as the reference for the free energy market scenario. The difference between these projections shows the potential savings.
Finally, recalculate the break‑even with the new energy cost and compare it to the current scenario. The difference between the two scenarios shows the measurable financial impact of migration on the company’s break‑even.
4. Why has energy become the last major variable cost in 2026?
In 2026, most Group A SMEs have already undergone review cycles in payroll, logistics, inputs and technology. Electricity remains the cost line with the greatest untapped reduction potential.
Market data reinforces this view. Market analyses and official estimates project an average increase of about 8% in electricity tariffs across Brazil for 2026, above expected inflation. The distributor Enel Distribuição Rio, for example, received approval for an average adjustment of 15.46% that took effect in March 2026.
In the short‑term market, a 2026 Armor Energia study identified price swings that could exceed R$ 200/MWh, compared to the R$ 60–70/MWh range in 2023. This level of volatility makes converting monthly consumption into stable financial forecasts difficult and requires frequent scenario and cash‑budget revisions.
For the CFO of a Group A SME, this scenario turns electricity into the main source of OPEX uncertainty. Migration to the free energy market, with a fixed‑price contract, is the available mechanism to reduce this uncertainty.
5. Monthly financial analysis step‑by‑step in 7 stages
The method below integrates energy monitoring into the monthly financial routine of Group A SMEs. Each stage can be carried out by the controller or finance manager with data already available in the company.
Stage 1: consolidate the month’s energy invoices
The first step is to gather the distributor’s invoices and, if the company is already in the free energy market, the generator’s invoice. Then, record consumption in MWh, the contracted demand and flag surcharges. This data set forms the starting point for any analysis.
Stage 2: calculate the unit energy cost
The next step is to translate energy data into financial indicators. The controller can calculate cost per unit produced, cost per square meter, or the percentage impact on gross margin. These indicators link electric consumption to operational performance.
Stage 3: compare actual versus budgeted
Comparing the actual energy cost for the month with the budgeted amount reveals relevant variances. The actual consumption history serves as the basis for this analysis. Variances above 5% merit detailed investigation.
Stage 4: allocate costs by cost center
Allocating energy cost by cost center increases internal accountability. Using telemetry data allows distributing the cost among departments, production lines or units, instead of posting a single invoice in the income statement. This creates objective responsibility for efficiency in each area.
Stage 5: update the break‑even point
With the month’s energy cost determined, the controller should recalculate the break‑even and compare it with the previous month. If energy cost rose due to a tariff flag, the break‑even rises as well. The commercial team needs visibility of this change.
Stage 6: project the next quarter
The projection of energy cost for the next three months uses consumption history and the current energy price. If the company is still in the regulated market, the projection should include scenarios with yellow and red flags. If the company has already migrated, the contract’s fixed price removes this variable from the projection.
Stage 7: review the contracting strategy
Periodic review of the contracting strategy reduces exposure to the short‑term market. Monitoring contracted versus actual consumption helps avoid excess
ou deficit. If the company has not yet migrated, the accumulated data from the previous steps serve as the basis for the migration decision.6. Financial indicators after integrating energy into the monthly analysis
Integrating energy into the monthly financial routine changes how the CFO views the company's performance. Three effects stand out in practice.
-
Energy bill cost: in the regulated market, the cost remains subject to annual adjustments and flag surcharges, with average increases projected above inflation. After migration, medium‑sized companies record significant reductions in the bill, as detailed in section 2.
-
Budget predictability: before migration, flag fluctuations make reliable OPEX projections difficult. With a fixed price in the contract, the annual budget no longer depends on unexpected tariff variations, as shown by the experience of companies monitored by Comerc Energia.
-
Operating margin: in the previous scenario, adjustments above the IPCA and unforeseen flag surcharges compress the margin. After migration, the direct reduction of energy OPEX improves the operating margin without requiring revenue increase, as documented by Revista Mundo Elétrico.
7. How does Serena Energia eliminate the unpredictability of tariff flags?
Serena Energia is one of the largest wind and solar power generators created in the Americas, with more than 17 years of history and 17 operational plants in Brazil and the USA. In the free energy market, the company operates primarily with renewable energy and offers long‑term contracts with a fixed price, which replaces the uncertainty of tariff flags with a known and stable energy cost.

Serena Energia's operating model for Group A SMEs works in a structured way.

-
Managed migration: Serena Energia conducts the entire migration process, from feasibility analysis to registration with CCEE (Electric Energy Commercialization Chamber), at no additional cost to the client.
-
Continuous management: after migration, Serena represents the company before CCEE (Electric Energy Commercialization Chamber) in the retail model, handling settlements and sector compliance.
-
Physical delivery by the distributor: the local distributor remains responsible for the physical delivery of energy. Migration is a commercial and contractual process, and the quality and stability of supply remain the same.
-
I-RECs at no additional cost: for each MWh consumed, Serena issues Renewable Energy Certificates (I-RECs). These certificates document the clean origin of the energy for sustainability reports and ESG targets.
-
Monitoring dashboard: the client accesses a digital dashboard with monthly savings, actual versus forecast consumption, and comparison between the regulated market and the free energy market.
Companies such as Heineken, Cargill and Eurofarma already use Serena's energy. The migration process takes up to six months, during which Serena assumes all bureaucratic steps.

8. Frequently asked questions about migration and financial analysis
Does my company need a minimum consumption to migrate to the free energy market?
There is no minimum consumption. The only requirement is that the company be in Group A, connected to the grid at medium or high voltage. Since January 2024, any company in this range can migrate to the free energy market, regardless of the monthly volume consumed. Serena Energia conducts the eligibility analysis at no cost.
How long does the migration process take?
The regulatory process takes up to six months, the time needed to terminate the contract with the current distributor. During this period, Serena Energia carries out all steps: notifying the distributor, registering with CCEE (Electric Energy Commercialization Chamber), adapting the measurement system and installing the necessary equipment, at no additional cost to the client. The sooner the company starts, the sooner it begins to capture savings.
Will the company receive two invoices after migration?
Yes. In the free energy market, the company receives an invoice from the generator, such as Serena Energia, and an invoice from the local distributor, which continues to be responsible for the physical delivery of electricity. Serena centralizes the management of this process and the client has the support of a dedicated consultant to monitor both invoices.
What happens if actual consumption falls outside the contracted volume?
Contracts provide a flexibility range for higher or lower consumption relative to the contracted volume. Consumption outside this range is settled in the short‑term market. Serena Energia performs active consumption management to reduce this exposure, helping the company forecast monthly consumption and adjust the contract when necessary.
What is the I‑REC and how does it appear in the company's financial analysis?
The I‑REC (International Renewable Energy Certificate) is a global certificate that audibly proves that 1 MWh of energy was generated by a renewable source and injected into the grid. For the CFO, the I‑REC does not represent an additional cost at Serena Energia and appears as a sustainability asset in ESG reports. This asset meets the requirements of investors, customers and external audits without impacting OPEX.
Conclusion
The financial analysis for Group A SMEs is only complete when the company treats electricity as a strategic variable, not as an immutable fixed expense. The seven‑step method described in this guide integrates energy monitoring into the controller’s monthly routine, links electricity consumption to the metrics the board monitors, such as cash flow, break‑even point and operating margin, and creates the data set needed to evaluate migration to the free energy market with objective financial criteria.
In 2026, with tariff adjustments projected above inflation and price fluctuations that make stable monthly forecasts difficult, postponing this analysis has a real and measurable financial cost. Migration to the free energy market, with a fixed‑price contract and physical delivery maintained by the local distributor, is the available mechanism to turn the last major OPEX variable into a predictable and controllable line.
Schedule a migration financial analysis with Serena Energia.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *