Risk analysis in financial decisions for SMEs

Written by: André Lima, Growth, Serena Energia
Key takeaways from this article
- In 2026, 47% of Brazilian SMEs face high cost pressure and 49% report a drop in profitability, making structured risk analysis essential for financial survival.
- The five most critical financial risks for Group A SMEs include business interruption, commodity fluctuation, energy costs, currency swings, and margin compression due to limited pass-through.
- The probability × impact matrix, focusing on scores of 12 and above, allows risks to be prioritized objectively, highlighting the energy tariff adjustment risk, which frequently hits the maximum score.
- Fixed-price contracts in the free energy market offer budget predictability and reduce exposure to regulated adjustments, unlike the captive market subject to ANEEL tariffs.
- To apply these strategies and protect your margins, speak with a Serena Energia consultant.
1. The five main financial risks affecting SMEs in 2026
Aon’s 2026 Global Risk Management Survey, conducted with 2,941 executives across 63 countries, including 155 Brazilian respondents, points to business interruption as the top corporate risk in Brazil. The five most relevant financial risks for Group A SMEs (companies with medium and high voltage supply) in 2026 are:
- Business interruption: operational shutdowns due to supply failures, disasters, or liquidity crises compromise revenue and contracts.
- Input and commodity cost fluctuation: commodity prices and material scarcity rank second in the corporate risk ranking in Brazil according to Aon 2026.
- Electricity cost and tariff oscillation: in 2026, ANEEL approved tariff adjustments for 22 Brazilian distributors, almost all above inflation, affecting over 70 million consumers. The electricity bill has become a strategic financial variable rather than just an operational expense.
- Currency fluctuation and credit pressure: currency fluctuation appears among the main corporate risks in Aon's survey, and high Selic rates make operational credit more expensive.
- Margin compression due to limited pass-through: only 14.7% of Brazilian SMEs managed to increase their profit margin by passing price increases on to consumers, according to Serasa Experian. Therefore, internal cost management becomes the primary available lever.
Among these five risks, the cost of electricity stands out due to the combination of high probability and direct impact on cash flow. Adjustments approved by ANEEL in 2026 include 20.51% for Copel, which immediately pressures the expenses of Group A companies in various regions of the country.
Understand how contractual predictability can protect your margins by including energy costs in your risk analysis.

2. Five-step process to build a risk analysis
A structured risk analysis process allows the financial team to identify, prioritize, and mitigate threats before they become crises. For Group A SMEs, this process can follow five practical and repeatable steps.
Step 1: Identify risks
Bring together managers, the accountant, and the operations manager to ensure all perspectives of the company are represented. With this group, list all relevant financial threats, such as energy costs, exchange rates, credit, customer default, and supplier disruption, because each area perceives risks that others might miss. Record each risk in a spreadsheet with category, description, and affected area, forming the inventory to be prioritized in the following steps.
Step 2: Evaluate probability and impact
| Risk | Probability (1–5) | Impact (1–5) | Score | Priority |
|---|---|---|---|---|
| Energy tariff adjustment | 5 | 4 | 20 | High |
| Key customer default | 3 | 4 | 12 | High |
| Exchange rate spike on imported inputs | 4 | 3 | 12 | High |
| Critical supplier disruption | 2 | 5 | 10 | Medium |
| Increase in labor charges | 3 | 3 | 9 | Medium |
Step 3: Prioritize risks
Focus resources on the risks with the highest scores on the matrix. In 2026, energy risks usually occupy the top of this list, given the recent history of adjustments above inflation.
Step 4: Define the response
The four response strategies are avoid, mitigate, share, and accept. Avoid means stopping the activity that generates the risk. Mitigate means reducing probability or impact through controls. Share means transferring part of the risk through insurance or partnership. Accept means living with the risk when the cost of mitigation exceeds the expected loss.
Step 5: Monitor quarterly
Key risk indicators that SMEs should track monthly include the current liquidity ratio, average collection period, and cash reserve in days. Investigate liquidity below 1.5 and take action when the ratio drops below 1.2. Review the average collection period when it exceeds 40 days. Begin reviewing the cash reserve when the balance covers less than 90 days of operational expenses.
3. Practical example of an investment decision with electricity bill impact
A medium-sized Group A industrial company is evaluating the purchase of new production equipment. Projected cash flow typically considers incremental revenue, labor costs, and raw materials, but often omits the impact of electricity on the equipment's operational cost.
By applying the probability and impact matrix, the financial team identifies that the tariff adjustment risk has a score of 20, with a probability of 5 and an impact of 4. In RGE Sul’s concession area, the tariff for high-voltage consumers rose by 19.02% in 2026. This movement directly alters the equipment's operational cost and the investment payback period.

The recommended process for this decision includes:
- Calculate the equipment's additional energy consumption in kWh per month.
- Calculate the current cost using the prevailing tariff and project scenarios with adjustments of 10%, 15%, and 20% over the financing contract term.
- Compare the projected cost in the captive market with the cost of a fixed-price contract in the free energy market for the same period.
- Include the energy cost differential in the investment decision's cash flow.
- Define the response strategy and, when appropriate, migrate to the free energy market before activating the equipment to reduce exposure to future adjustments.
Simulate the impact of the electricity bill on your next investment decision with the support of Serena Energia.
4. Ready-to-use risk analysis checklist
This checklist supports relevant financial decisions, such as expansion, hiring, equipment investment, or budget revision.
- Are the company's top five financial risks mapped and documented?
- Did each risk receive a probability score from 1 to 5 and an impact score from 1 to 5?
- Do risks with a score of 12 and above have a defined response plan and assigned owner?
- Was the cost of electricity included in the decision's cash flow, incorporating an adjustment scenario?
- Does the company hold a cash reserve equivalent to at least 3 months of operational expenses?
- Is the average collection period below 40 days?
- Is revenue concentration in a single customer below 25% of total billings?
- Do energy supply contracts have defined terms and prices, or do they remain subject to regulated adjustments?
- Is the company in Group A and has it evaluated migrating to the free energy market?
- Is the next risk map review scheduled for the next 90 days?
5. Pessimistic scenario: 30% drop in sales + tariff increases
Building a pessimistic scenario is a recommended practice before any expansion decision or credit contracting. Companies can work with three scenarios—base, conservative, and pessimistic—using 12 months of invoices adjusted for seasonality and operational changes to simulate the impact on margins before hedging or contracting decisions.
In the combined pessimistic scenario for a Group A SME in 2026:
- A 30% drop in sales reduces gross revenue and compresses the contribution margin.
- Energy tariff adjustments above inflation raise fixed operational costs without a proportional reduction in lower production volume.
- The aforementioned difficulty in passing on costs prevents margin recovery on the revenue side.
- The cash reserve is consumed faster, reducing the operational survival window.
Mitigation steps for this scenario include:
- Fixing the energy cost through an agreed-upon price contract in the free energy market, reducing exposure to tariff adjustments during the crisis period.
- Reviewing the average collection period and accelerating receivables to bolster cash flow.
- Renegotiating supplier terms to extend the financial cycle.
- Suspending or postponing non-essential investments until the current liquidity ratio stabilizes above 1.5.
- Activating the emergency reserve gradually, with pre-defined triggers.
6. Emergency reserve and contractual term control, including energy
Beyond the cash reserve, controlling contractual terms is a critical discipline. Energy contracts in the captive market have no consumer-defined term, and the tariff is periodically adjusted by ANEEL without negotiation. In the free energy market, the contract has a term, price, and conditions agreed upon between the parties, requiring attention to the renewal calendar and the lead time necessary for migration or renegotiation.
Recommended practices for controlling contractual terms include:
- Maintaining a centralized register of all relevant contracts with expiration dates, values, and the person responsible for renewal.
- Setting alerts at least 6 months in advance for energy contracts, due to the regulatory notice period required for market migration.
- Reviewing the energy contract every annual budgeting cycle, comparing the contracted cost with the conditions available in the free energy market.
- Including energy cost as an explicit line item in the annual budget, with a documented adjustment scenario.
7. Comparison table: captive market vs free energy market
The table below compares the two energy contracting environments for Group A companies. All data is based on sources indicated throughout the article.
| Criterion | Captive market | Free energy market | Relevance for SMEs |
|---|---|---|---|
| Price definition | Tariff regulated by ANEEL, subject to annual adjustments and flag systems | Price agreed in a bilateral contract between the company and supplier | Long-term budget predictability |
| Recent adjustments | Adjustments of up to 20.51% approved by ANEEL in 2026 across various distributors | Price fixed in the contract, without exposure to tariff flags during validity | Cash flow protection in high-tariff scenarios |
| Supplier choice | No choice, the local distributor is the only option | Company chooses the supplier, being able to negotiate price, term, and energy source | Negotiating power and risk diversification |
| Energy origin and certification | Grid mix, without renewable source traceability | Possibility of contracting 100% renewable energy with I-REC issuance for ESG reports | Meeting sustainability goals and stakeholder requirements |
In both environments, the local distributor remains responsible for the physical delivery of electricity. The difference lies in who defines the price and supply conditions.

Evaluate whether migrating to the free energy market is viable for your company with Serena Energia's support.
Summary and next practical step
In 2026, risk analysis in financial decisions for small Group A companies must explicitly incorporate the cost of electricity as a strategic variable, rather than just an operational one. Energy has joined the same conversation as payroll, pricing, and working capital.
The core points of this guide are:
- The top five financial risks for SMEs in 2026 include business interruption, commodity fluctuation, energy costs, exchange rates, and margin compression.
- The probability × impact matrix allows risks to be prioritized objectively, focusing on scores of 12 and above.
- The ten-item checklist can be applied before any relevant financial decision.
- The combined pessimistic scenario, featuring falling sales and tariff adjustments, reinforces the need to lock in energy costs via contract.
- Cash reserves and contractual term controls complement risk analysis.
- The free energy market offers cost predictability that the captive market does not provide.
Serena Energia, one of the largest wind and solar energy generators created in the Americas, offers managed migration to the free energy market at no additional cost to the client, featuring agreed-upon price contracts and 100% certified renewable energy. The next step is to simulate migration based on your company's consumption profile.
Frequently asked questions
Can my Group A company migrate to the free energy market even without a defined minimum consumption?
Yes. There is no minimum consumption required to migrate to the free energy market. Eligibility is defined by Group A classification. Companies that fall into this group can initiate the migration process regardless of the volume of energy consumed. Serena Energia performs the eligibility analysis at no cost to the interested party.
How long does migration to the free energy market take?
The regulatory migration process takes an average of 6 months, a timeframe dictated by the notice period required to terminate the contract with the local distributor. Therefore, companies wanting to start saving quickly should begin the evaluation and contracting process without delay. Serena Energia handles all bureaucratic steps, from notifying the distributor to registering with CCEE (Electric Energy Commercialization Chamber), at no additional cost to the client.
What are I-RECs and why are they relevant to financial risk analysis?
I-RECs (International Renewable Energy Certificates) are traceable digital certificates proving that a specific amount of energy was generated from a renewable source and injected into the grid. For companies with public sustainability goals or undergoing ESG audits, I-RECs serve as auditable evidence to declare 100% renewable energy consumption in annual reports. From a financial standpoint, the absence of this certification can represent reputational and contractual risks with clients and investors demanding compliance with global decarbonization standards. Serena Energia issues I-RECs corresponding to each client's consumption.

What is the difference between the retail and wholesale models in the free energy market?
In the retail model, a trading company like Serena Energia intermediates the process, represents the company before CCEE (Electric Energy Commercialization Chamber), and manages all sectoral obligations. The client locks in the price per unit of consumed energy and receives a monthly invoice calculated based on actual consumption. In the wholesale model, the company acts directly as an agent in CCEE and manages its own contracts and risks—a model suited for large consumers with specialized internal structures. For most Group A SMEs, the retail model is the most appropriate due to operational simplicity and the lack of need for internal sectoral expertise.
How do I include the risk of electricity in annual budget planning?
The first step is to treat the energy bill as an explicit budgetary line item, featuring monthly history from the past 12 months and adjustment scenario projections for the upcoming fiscal year. In the captive market, the adjustment scenario must consider the local distributor's historical adjustments and the possibility of tariff flags being triggered during periods of water scarcity. In the free energy market with a fixed-price contract, the energy cost is known in advance for the entire contract term, eliminating the need to provision for high-tariff scenarios and simplifying long-term planning.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *