How to benchmark fixed expenses in companies?

Written by: André Lima, Growth, Serena Energia
Main takeaways from this article
-
Fixed expenses such as electricity, rent, and payroll consume a significant portion of revenue. Structured benchmarking reveals concrete reduction opportunities.
-
The 7‑step process with standardization of the chart of accounts, data collection, metric construction, quartile comparison, gap identification, integration into ZBB, and monitoring creates consistent comparisons and sustainable results.
-
Metrics such as EUI (kWh/m²/year), cost per unit produced, and load factor allow units to be compared with each other and with the market, facilitating prioritization of interventions.
-
Companies in Group A can reduce costs by migrating to the free electricity market, replacing tariff flags with long‑term contracts at a pre‑agreed price.
-
To implement benchmarking and assess migration to the free electricity market, contact Serena Energia.
Prerequisites to start benchmarking
Fixed‑expense benchmarking requires coordination across areas, historical data, and proper measurement.
Involved teams: Controlling, facilities or operations, and sustainability need to work in an integrated way. Controlling handles accounting standardization and variance analysis. Facilities or operations provide consumption and demand data. The sustainability area connects the process to ESG goals and I‑REC certificates.
This division of responsibilities ensures that all relevant information is available.
Required documents: The company must gather 12 months of electricity invoices, an updated chart of accounts, revenue data per business unit, and a history of contracted versus measured demand. Without this complete history, period‑to‑period and unit‑to‑unit comparisons lose consistency and reduce result reliability.
Hourly measurement: Interval‑hour measurement is essential to separate consumption costs (kWh) from demand costs (kW). This measurement enables the calculation of the load factor, which is total kWh divided by peak kW multiplied by the period’s hours. This metric is central to energy benchmarking and supports decisions on contracted demand and infrastructure use.

Overview of the 7‑step process
With the prerequisites met, the benchmarking process follows 7 sequential steps, each with a defined owner and clear acceptance criteria.
The flow starts with chart‑of‑accounts standardization, moves through data collection and normalization, relative metric construction, external reference comparison, gap identification, integration with Zero‑Based Budgeting, and ends with continuous monitoring.
This chain reduces rework and facilitates adoption of the process by the involved areas.
Step‑by‑step: how to benchmark fixed expenses
Step 1 — Standardize the chart of accounts
The goal is to ensure all units classify fixed expenses in the same way.
To achieve this, controlling should map each accounting account to a standardized category such as electricity, rent, fixed payroll, IT, and insurance.
This standardization creates a common basis for comparison. Without this alignment, divergent classifications across subsidiaries generate invalid comparisons and make benchmarking of little use.
Step 2 — Collect and normalize consumption data
The goal is to create a comparable database across sites and periods. For electricity, the company must separate controllable costs, such as consumed kWh, demand kW, and fuel adjustments, from fixed distribution and transmission charges.
Then, the data should be normalized by an energy‑intensity indicator, such as EUI in kWh per m² or kWh per unit produced. Here, facilities and controlling share responsibility for this step.
The lack of hourly measurement limits load‑factor calculation and hampers identification of demand peaks, reducing analysis accuracy.

Step 3 — Build relative metrics
The goal is to convert absolute values into KPIs comparable across units of different sizes. The following metrics normalize costs by area, production, or headcount and allow each site to be positioned relative to the internal benchmark.
|
Fixed expense |
Relative metric |
Unit |
|---|---|---|
|
Electricity |
EUI (energy intensity) |
kWh/m²/year |
|
Electricity |
Cost per unit produced |
R$/unit |
|
Rent |
Cost per occupied m² |
R$/m²/month |
|
Fixed payroll |
Cost per employee |
R$/FTE/month |
Step 4 — Compare with external references and quartiles
The goal is to position each unit relative to the market and to other company units. Energy benchmarking applies comparative analysis to consumption and utility data to reduce costs and improve efficiency.
Units in the first quartile, with the best performance, serve as internal references. Units in the fourth quartile indicate priority for intervention. Controlling and facilities conduct this analysis together.
Comparing units of vastly different sizes without scale adjustment distorts results and may direct investments to the wrong locations.

Step 5 — Identify gaps and root causes
The goal is to separate operational inefficiencies from contractual inefficiencies. Operational inefficiencies involve equipment, operating schedules, and maintenance. Contractual inefficiencies involve tariff modality and energy supplier choice.
A formal audit that examines historical invoices, peak‑demand patterns, and equipment performance identifies which efficiency measures generate actual savings. Here, facilities and sustainability lead this step and link findings to efficiency projects and ESG goals.
Step 6 — Integrate results into Zero‑Based Budgeting
The goal is to use identified gaps as the basis to justify or eliminate each fixed‑expense line.
In BCG’s ZBT model, leaders use workshops to evaluate each spend line from multiple perspectives, including comparison with internal and external references. Integrating benchmarking into the budgeting process increases transparency, improves assumption validation, and helps set more competitive cost targets.
Controlling and the finance directorate are responsible for this integration and for translating findings into budget targets.
Step 7 — Monitor continuously
The goal is to maintain achieved reductions and avoid gradual cost creep. An effective energy‑management strategy includes defined governance, standardized data collection across sites, quarterly targets linked to projects, and a single source of truth for invoices and interval data.
Controlling and facilities share responsibility for this monitoring. The recommended cadence includes monthly KPI reviews and a full quarterly review, with target adjustments as needed.
Common mistakes and how to avoid them
Even with a structured process, recurring errors can diminish benchmarking quality. Knowing these pitfalls helps correct them quickly.
Incorrect expense classification: Electricity is often recorded as a variable expense, even though contracted demand and distribution charges are fixed in nature. Separating the two components in step 2 fixes this issue and improves cost reading. Even with correct classification, outdated data can still compromise the analysis.
Outdated data: Using invoices older than 12 months without seasonal adjustment skews the EUI. Updating the database each quarter keeps the historical series reliable. In addition to temporal updates, size‑based normalization is also essential.
Lack of size adjustment: Comparing the absolute cost of a 50,000 m² plant with a 5,000 m² plant without normalizing by area or production invalidates the benchmarking. Building relative metrics in step 3 reduces this risk and makes comparisons fairer.
Misalignment between areas: when controlling and facilities use definiçõ
They are different from “contracted demand” or other variables, the KPIs diverge. A single glossary, defined in step 1, reduces divergent interpretations and facilitates communication across areas.
Validation checklist: the company must confirm whether all units use the same chart of accounts, whether the data covers a full 12 months, whether the metrics are normalized by area or production, and whether controlling and facilities have validated the numbers together. This checklist serves as the final verification step before decision making.
How to verify if the benchmarking is correct?
A well‑structured benchmarking produces objective and reproducible evidence. Some KPIs act as quality control for the process:
-
Month‑over‑month variation of EUI: fluctuations above 10% without operational change indicate a collection or classification error.
-
Fixed expenses as a percentage of revenue: a practical benchmark is to avoid fixed expenses consuming more than half of revenue, with adjustments per sector.
-
Load factor: consistently low values suggest contracted demand exceeds what is needed and indicate an opportunity for contract review.
Quarterly review allows comparing current performance with the baseline and adjusting targets before the next budgeting cycle. B C G recommends institutionalizing annual zero‑based budgeting as the final step of the process, with KPIs and a single dashboard to reduce the gradual cost creep.
For Group A companies, the gap between the current cost in the regulated market and the potential cost in the free energy market is one of the most actionable indicators that benchmarking can reveal.
Serena Energia offers managed migration to the free energy market, handling the entire process at no additional cost to the client.

Advanced options and related topics
After establishing the basic benchmarking process, companies with more complex operations can expand scope and automation.
Multi‑site: companies with multiple sites can create internal rankings by EUI quartile and prioritize interventions in fourth‑quartile plants. Consistent EUI metrics, cost per area, and load factor help rank facilities and identify buildings with the highest savings potential after climate normalization.
ERP integration: connecting invoice data to the ERP enables automated variance calculation between planned and actual cost in each monthly close. This integration reduces manual work for controlling and speeds up deviation identification.
I‑REC certificates: companies that migrate to the free energy market with Serena Energia can request Renewable Energy Certificates (I‑RECs) for each MWh consumed. These certificates document the renewable origin of the energy in sustainability reports and contribute to Scope 2 emissions reduction.

Variable cost benchmarking: after consolidating fixed‑expense benchmarking, the company can apply similar logic to variable costs such as logistics and supplies. Metrics like cost per unit shipped or cost per kg of raw material allow expanding the efficiency scope.
Frequently asked questions about benchmarking and migration to the free energy market
Can my Group A company migrate to the free energy market?
Yes. Any company connected at medium or high voltage, which characterizes Group A, can migrate to the free energy market, regardless of consumption volume. There is no minimum consumption required. Serena Energia conducts the eligibility analysis at no cost.
How long does the migration take?
The regulatory process takes 6 months, counted from the notification to the distributor. Serena Energia handles all steps, including documentation, registration with CCEE (Electric Energy Commercialization Chamber) and measurement system adaptation, at no additional cost to the client.
Who within the company is responsible for the migration process?
The decision is usually led by the CFO or controller, with facilities support for technical consumption and demand data. Serena Energia assumes operational execution, reducing internal team workload.
Is there a risk of power supply interruption after migration?
No. The local distributor remains responsible for the physical delivery of electricity. Migration is a commercial and contractual process where the company changes its energy supplier but keeps the same delivery infrastructure.
How does energy benchmarking connect to Zero‑Based Budgeting?
Benchmarking identifies the gap between current cost and market reference. This gap becomes an objective justification to question the energy line in ZBB and steer the decision to migrate to the free energy market, where long‑term contracts with pre‑agreed prices reduce uncertainty associated with tariff flags.
Conclusion: what you can build after following this guide
Upon completing the 7 steps, the company will have a standardized chart of accounts across all units, fixed‑expense KPIs normalized by area, production, or revenue, and an internal quartile ranking that prioritizes interventions.
The results are integrated into the Zero‑Based Budgeting cycle and the quarterly monitoring process reduces gradual cost creep.
For Group A companies, the next most actionable step is to quantify the gap between the current cost in the regulated market and the potential cost in the free energy market.
Serena Energia, among the largest wind and solar generators created in the Americas, offers managed migration, continuous management with CCEE (Electric Energy Commercialization Chamber), and I‑REC certificates for its clients.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *