How to calculate the return on remote energy generation?

Written by: André Lima, Growth, Serena Energia
Key lessons of this article
- Group A companies need objective criteria to compare energy alternatives and preserve operational margins.
- Remote generation converts infrastructure investments into predictable operating expense, without upfront capital outlay.
- The return calculation requires analysis of 12 months of invoices, inclusion of Wire B and consideration of the distributor's fixed charges.
- Remote generation contracts can generate a 10% to 20% bill savings and an annual return of around 20% for mid-sized companies.
- To obtain a personalized analysis of cost reduction potential, talk to Serena Energia's consultants.
Prerequisites: required documents and data
The return calculation starts with gathering the information that describes the company's energy profile. This step applies to Group A companies, medium and high voltage.

- Energy invoices from the last 12 months, from the distributor and, if applicable, from the generator
- Monthly consumption profile in kWh, with identification of seasonality and peaks
- Contracted demand in kW per tariff slot, peak and off-peak
- Active energy tariff (TE) and Distribution System Use Tariff (TUSD) practiced by the local distributor
- Wire B component of TUSD, which represents on average 28% to 35% of TUSD and varies by distributor and region
- Identification of all consumer units eligible for the contract
Overview of the process in 5 steps
- Data collection and organization of consumption and billing
- Calculation of current cost in the regulated energy market
- Projection of cost with remote generation contract
- Calculation of financial return and payback period
- Monthly monitoring and model adjustment
Step-by-step guide: how to calculate the return
Step 1 — Data collection and organization
Objective: build a reliable database for subsequent calculations.
Actions: consolidate the latest 12 invoices into a spreadsheet, separating consumption in kWh, recorded demand in kW, sector charges and taxes. This separation allows isolating the components that will be compensated by the contract from those that will remain on the invoice. With the data organized, identify the average cost per kWh actually paid, calculated as total invoice cost divided by total consumption in kWh, which will serve as a reference for comparison.
Internal responsible: controller or financial analyst, with support from the facilities manager.
Dependencies: access to original invoices and the unit's measurement system.
Risks: incomplete invoices or periods with atypical consumption can distort the average. It is recommended to exclude months with scheduled shutdowns or extraordinary events.
Step 2 — Calculation of current cost in the regulated market
Objective: establish the cost baseline that will be compared with the remote generation contract scenario.
Actions: sum all invoice components, such as active energy, TUSD with Wire B, demand, charges and taxes. The result represents the total annual cost in the regulated energy market.
Formula:
Current annual cost = sum of the monthly invoices of the last 12 months
Internal responsible: controller.
Risks: ignoring Wire B as a separate component is a frequent mistake. Wire B must be considered in return calculations even in contracts without upfront capital outlay, as it reduces the achievable net savings.
Step 3 — Projection of cost with remote generation contract
Objective: estimate the monthly cost after joining the contract, considering energy credits and remaining charges.

Actions: calculate the projected invoice value by subtracting energy credits from the active energy cost and adding non-compensable charges, such as the portion of Wire B applicable to the current period and the distributor's minimum availability.
Formula:
Projected monthly cost = active energy cost minus contract credits, plus remaining Wire B, plus fixed charges
Internal responsible: controller, with data provided by the contracted generator.
Risks: commercial installations maintain a minimum distributor availability charge even after joining remote generation contracts. This charge must be included in the projection.
Since these values vary by distributor and consumption profile, talk to one of our consultants to obtain remote generation contract data and build the projection accurately.
Step 4 — Calculation of financial return and payback period
Objective: quantify the annual savings and the time needed for the contract benefits to consolidate.
Actions: apply the formulas below with the values obtained in the previous steps.
Formulas:
Monthly savings = current monthly cost minus projected monthly cost
Annual savings = monthly savings multiplied by 12
Annual return, in percent, = annual savings divided by the contract's annual cost, multiplied by 100
Payback period, in months, = contract monthly cost multiplied by months, divided by monthly savings
Practical example, Group A company in São Paulo:
| Variable | Value |
|---|---|
| Current monthly invoice in the regulated energy market | R$ 50.000 |
| Monthly cost with remote generation contract | R$ 40.000 |
| Monthly savings | R$ 10.000 |
| Annual savings | R$ 120.000 |
| Annual return on contract cost | 20%* |
*Return calculated based on the formula annual savings divided by the contract's annual cost, multiplied by 100. Remote generation contracts without upfront capital outlay can achieve an annual return of around 20% in simulations for mid-sized companies.
To contextualize these numbers, the table below compares the main decision criteria between staying in the regulated energy market and migrating to remote generation, focusing on financial and operational impacts.
Comparative table: remote generation vs. regulated market
| Criterion | Regulated market | Remote generation, zero CAPEX |
|---|---|---|
| Initial capital outlay | None | None |
| Cost predictability | Low, subject to tariff flags | High, with price fixed in contract |
| Potential bill reduction | Not applicable | As detailed in the practical example |
| Renewable energy certification, I-REC | Not available | Available |
Step 5 — Monthly monitoring and model adjustment
Objective: verify whether the projected savings are being realized and identify deviations.
Actions: compare monthly the current invoice with the invoice of the equivalent period before the contract, update the monitoring spreadsheet and report to the CFO.
Internal responsible: controller or facilities manager.
Common mistakes when calculating the return
The return calculation shows recurring error patterns in remote generation contract analyses for Group A companies, medium and high voltage.
- Ignore Wire B: Wire B represents on average 28% to 35% of TUSD and directly reduces net savings. Omitting this component overestimates the contract benefit.
- Use only one reference month: a single month may not represent the real consumption profile. The calculation base should consider at least 12 months.
- Disregard distributor's fixed charges: even with energy credits, the company continues paying availability charges and other fixed items on the distributor's invoice.
- Not involving all areas: the calculation requires data from facilities for technical consumption, finance for billing, and, if applicable, ESG for decarbonization goals. The absence of any of these areas creates gaps in the model.
- Compare different units: comparing the cost per kWh of the remote generation contract with the total cost per kWh of the regulated invoice, which includes taxes and non-compensable charges, produces a distorted comparison.
Verification checklist before finalizing the model:
- Were invoices from the last 12 months used?
- Was Wire B calculated separately and included in the projected cost?
- Were the distributor's fixed charges kept in the projection?
- Were all eligible consumer units mapped?
- Was the model reviewed by finance, facilities and, if applicable, ESG?
Results verification
After the contract starts, monthly verification serves as the main tool to confirm that the projected return is being achieved. The following actions form an integrated monitoring system.
- Invoice comparison: compare the total amount paid in the current month with the equivalent amount of the same month of the previous year, or the pre‑contract period, adjusting for consumption variations.
- Use of monitoring dashboards: digital energy management platforms allow visualizing accumulated monthly savings, actual consumption compared to forecast, and the comparison between regulated energy market and the current contract. Serena Energia provides this dashboard to its clients, with invoice details and consumption forecast.
- Periodic model review: every 6 months, review the calculation assumptions, especially the distributor's tariff and consumption profile, to keep the projection aligned with operational reality.
Advanced options and te
but relatedCompanies with multiple consumer units can contract energy credits for distribution among different CNPJs or addresses. This strategy expands the contract’s reach and consolidates energy management with a single supplier. Energy credits in remote generation contracts remain valid for 60 months and can be used for compensation in the contracted units.
For companies with sustainability goals, a remote generation contract with renewable energy allows the issuance of Renewable Energy Certificates, I-RECs. Each MWh consumed from a clean source can be certified by an I-REC, a traceable and globally recognized document that proves the renewable origin of the energy and is used in ESG reports to offset Scope 2 emissions. Serena Energia, one of the largest wind and solar power generators created in the Americas, with more than 17 years of history, issues I-RECs and offers carbon credits to companies seeking to neutralize other emission sources, having avoided more than 2.14 million tonnes of CO₂ since 2017.

Frequently Asked Questions
Can any company in Group A contract remote energy generation?
Yes. Companies in Group A are eligible to contract remote energy generation. Serena Energia conducts the eligibility analysis at no cost to the client, verifying whether the company’s consumption profile meets the necessary technical requirements.
What is the typical term of a remote generation contract?
Contracts usually last 3 to 5 years. This period allows the company to plan its energy budget with predictability, without relying on annual tariff adjustments or tariff flags.
Who is responsible for the physical delivery of the energy?
The local distributor remains responsible for the physical delivery of electricity to the company’s facilities. The remote generation contract only changes the commercial source of the energy, i.e., from whom the company purchases it. The quality and continuity of the physical supply remain under the distributor’s responsibility.
What happens if the company’s consumption varies during the contract?
Remote generation contracts in the free energy market provide flexibility bands for consumption variations. Outside this band, the difference is settled in the short‑term market. Serena Energia monitors the client’s consumption and offers support to reduce this exposure.
How do I‑RECs integrate into the contract’s financial calculation?
I‑RECs do not directly alter the bill‑savings calculation, but they represent a sustainability asset with strategic value. Companies that need to prove renewable energy consumption for ESG reports, audits, or supply‑chain requirements find in I‑RECs the necessary auditable documentation. Serena Energia issues these certificates for each MWh consumed from a clean source.
Talk to one of our consultants and clarify doubts about eligibility, terms, and contractual structure before making your decision.
Conclusion
Calculating the return on remote energy generation contracts for Group A companies, medium and high voltage, requires a structured sequence. This sequence includes collecting historical consumption and billing data, defining a cost baseline in the regulated energy market, projecting the contract cost, applying the savings formulas and payback period, and monitoring monthly results. Mistakes such as ignoring the “Fio B,” using inappropriate reference periods, or comparing incompatible metrics compromise the model’s reliability.
Remote energy generation with no upfront capital converts an unpredictable operational cost into a manageable expense, with a price fixed in the contract and documented bill‑reduction potential. For companies with ESG targets, the model also enables the issuance of I‑RECs and the neutralization of Scope 2 emissions.
Serena Energia offers remote generation contracts, digitized energy management, and renewable energy certificate issuance for Group A companies throughout Brazil. With more than 17 years of history and clients such as Heineken, Cargill, and Bayer, the company handles the entire migration and management process at no additional cost to clients under its management.
Talk to one of our consultants and receive a personalized feasibility study for your company.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment