How to cut your business’s energy expenses

Written by: André Lima, Growth, Serena Energia
Main lessons from this article
-
Group A companies significantly reduce energy expenses when they conduct a detailed electricity bill diagnosis and identify charges for idle demand, peak‑hour consumption, and inadequate power factor.
-
Low‑investment operational actions, such as retrofitting lighting to LED, optimizing HVAC, and eliminating standby consumption, generate impact on monthly consumption within up to 3 months, without requiring large investments.
-
Migration to the free energy market is the main cost‑reduction lever for Group A in 2026, as it allows negotiating price, term, and volume and brings budget predictability throughout the contract.
-
In addition to achieving savings on the electricity bill, migration with 100% renewable energy and issuance of I‑RECs helps companies zero Scope 2 emissions and meet sustainability goals with auditable certification.
-
To start the migration process to the free energy market with full support and no additional cost, contact Serena Energia.
Diagnosis of your electricity bill and main consumption villains
Reducing energy expenses starts by understanding what composes a company's invoice. A Group A company's electricity bill is divided into two main components: the energy tariff, which measures consumption in kWh, and the demand tariff, which considers the kW contracted with the distributor. Imbalances between contracted demand and the actually measured demand generate unnecessary charges that can persist for months.
The main points of attention in the diagnosis follow a logical analysis sequence:
-
Contracted demand versus measured demand: contracting demand above actual consumption generates idle capacity charges. Contracting below generates overage penalties. This imbalance is usually the first villain, as it represents a fixed monthly cost independent of real consumption.
-
Peak hours: after adjusting demand, the next step is to analyze when energy is consumed. Consumption during peak hours, usually from 6 pm to 9 pm, has a significantly higher tariff. Shifting loads out of this period reduces cost without altering production.
-
Power factor: next, it is necessary to check the quality of energy use. A power factor below the regulatory limit generates additional charges on the bill. Correction occurs by installing a capacitor bank suitable to the unit's profile.
-
Internal losses in the electrical network: finally, the analysis must consider internal infrastructure. Old wiring, undersized transformers, and inefficient equipment increase real consumption without increasing production.
A systematic analysis of 12 months of invoices allows identifying consumption patterns, seasonality, and recurring charges that can be eliminated or renegotiated. This diagnosis is the starting point for any energy cost‑reduction strategy and guides the next actions.
Receive a detailed analysis of your company's consumption profile, free of charge and without commitment.
Low‑investment operational actions to reduce consumption
The diagnosis indicates where energy is wasted and which operational adjustments bring the fastest return. After this stage, the company can implement a set of measures with relatively low investment and direct impact on monthly consumption. The table below shows that high‑impact actions, such as LED retrofitting and HVAC optimization, are usually completed within months, while zero‑cost measures, like standby shutdown, generate results as soon as the protocol is adopted.
|
Action |
Investment level |
Expected impact |
Timeline |
|---|---|---|---|
|
LED lighting retrofit |
Low to medium |
Significant reduction in lighting consumption |
Months |
|
Shutdown of standby equipment |
None |
Elimination of phantom consumption |
After protocol |
|
HVAC (climate) optimization |
Low, with setpoint adjustment and maintenance |
Reduction in climate consumption |
Months |
|
Presence sensors and lighting automation |
Low to medium |
Reduction in intermittently used areas |
Months |
Replacing equipment with models bearing the Procel energy‑efficiency seal complements these actions. This swap is especially relevant for industrial electric motors, compressors, and refrigeration systems, which account for a significant share of consumption in industrial plants and larger‑scale operations.
These actions reduce the company's baseline consumption, but they have a limit. Even with all operational measures implemented, the company continues paying the regulated tariff set by ANEEL. To go beyond efficiency and act on the energy price, a market change is necessary.
Discover which operational measures generate the most impact for your consumption profile.
Migration to the free energy market: the highest‑impact solution
Migration to the free energy market is the highest‑impact measure for Group A companies, which have medium or high voltage supply. In the regulated market, tariffs are set by ANEEL and adjusted periodically, with no room for individual negotiation. In the free energy market, the company chooses the supplier, negotiates price, term, and volume, and contracts energy at a pre‑agreed price, which allows long‑term budget planning.

This change is purely commercial. The local distributor remains responsible for the physical delivery of electricity to the consumer unit, for network quality, and for supply stability.
7 practical steps to migrate in 2026
The migration follows a structured roadmap, organizing everything from eligibility verification to monitoring results after the market change.
-
Verify eligibility: confirm that the company is in Group A, with medium or high voltage supply. There is no minimum consumption requirement; simply belong to Group A.
-
Analyze consumption profile: map monthly consumption in kWh, identify seasonality and demand peaks. This analysis guides contract selection and allows projecting expected savings.
-
Choose a reliable retailer: select a partner with its own generation and proven track record to reduce risks. Serena Energia, among the largest wind and solar generators created in the Americas, offers full support throughout the process.
-
Register the company with CCEE (Electric Energy Commercialization Chamber): registration is mandatory to participate in the free energy market and involves technical, legal, and financial documentation. Serena Energia conducts the entire process at no additional cost to the client.
-
Negotiate the energy contract: define price, term, typically 3 to 5 years, and contracted volume, aligning the contract with the mapped consumption profile.
-
Implement the measurement system: hourly measurement is mandatory in the free energy market. Installation of measurement equipment is included in the service provided by Serena Energia.
-
Monitor and adjust consumption: after migration, monthly monitoring of results allows comparing costs with the regulated market period and identifying additional efficiency opportunities.
Checklist of required documents and data
Some documents and data need to be organized to enable registration with CCEE (Electric Energy Commercialization Chamber) and contract formalization.
-
Energy invoices from the last 12 months
-
Contracted and measured demand data
-
Company CNPJ and corporate documentation
-
Technical data of the consumer unit, such as supply voltage and installation code
-
Power of attorney for representation before CCEE (Electric Energy Commercialization Chamber)
In the retail model of the free energy market, Serena Energia represents the company before CCEE (Electric Energy Commercialization Chamber), handles sector obligations, and centralizes operational complexity. The client receives an energy invoice and a distribution invoice, with access to a digital dashboard that shows monthly savings, consolidated savings, comparison between regulated and free energy markets, consumption forecast, and actual consumption.
The typical migration timeline is 6 months, corresponding to the prior notice required to terminate the contract with the distributor. The sooner the company starts the process, the sooner it begins saving.
Start your migration to the free energy market with full support from Serena Energia.
Proven sustainability with I‑RECs and carbon credits
Migration to the free energy market with Serena Energia combines cost reduction with sustainability advancement. All energy supplied by Serena Energia originates from wind, and the company issues I‑RECs (International Renewable Energy Certificates) corresponding to each client’s consumption.

The I-REC is a global certificate that audibly proves that 1 MWh of energy was generated by a renewable source and injected into the grid. With this document, the company can declare that its electricity consumption is 100% renewable, which is the main tool to zero Scope 2 emissions in sustainability reports.

Large Brazilian companies are already following this path. Telefônica Brasil (Vivo) has a net‑zero emissions target by 2035, while Bayer has signed an agreement with Serena Energia as part of its initiatives to achieve sustainability goals aligned with the UN Sustainable Development Goals.
For companies that aim to go beyond Scope 2 neutralization, Serena Energia offers carbon credits from certified projects, which complement the decarbonization strategy for other emission sources. Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂.

Common Risks and Best Mitigation Practices
The migration to the free energy market is a safe process when the company plans each step well. The main risks focus on consumption, measurement, partner selection, and planning timeline.
Consumption deviation relative to the contracted volume: contracts in the free energy market provide a flexibility range, usually between 5% and 10% of the contracted volume. Consumption outside this range is settled in the short‑term market, whose price may differ from the contracted one. Continuous consumption monitoring and proactive contract adjustment when there are relevant operational changes reduce this exposure.
Measurement system adequacy: hourly measurement is mandatory in the free energy market. Installing the correct equipment before migration is a condition for the process to occur without delays. The responsibility for measurement system adequacy is already included in the service provided by Serena Energia.
Selection of the commercial partner: companies that do not have their own generation depend on purchasing energy from third parties to honor their contracts, which can represent a supply risk in adverse market scenarios. Serena Energia, as a generator with its own portfolio of wind plants, has energy backing to cover the contracted consumption of its customers.
Planning timeline: the migration process takes 6 months, a period that needs to be considered in budgetary and operational planning. Companies that start the process early expand contracting options and better take advantage of price windows.
Frequently Asked Questions about Cutting Energy Costs
Does my company need to have a minimum consumption to migrate to the free energy market?
No. Since January 2024, any company connected at medium or high voltage, i.e., belonging to Group A, can migrate to the free energy market, regardless of consumption volume. The eligibility criterion is the supply voltage level, not the monthly consumption in kWh.
How long does the migration process take?
The process takes about 6 months, a period that the distributor requires to close the current contract. During this time, Serena Energia conducts the bureaucratic steps, from registration with the CCEE (Electric Energy Commercialization Chamber) to contract formalization, with the support already described in step 4 of the migration process. Therefore, the sooner the company starts the process, the sooner it begins to save.
What happens if my company consumes more or less energy than contracted?
Contracts in the free energy market provide a flexibility range, usually between 5% and 10% of the contracted volume. Consumption outside this range is settled in the short‑term market. In Serena Energia’s retail model, active consumption management helps minimize this exposure, with monthly monitoring and support from a consultant dedicated to the client’s contract.
What is the I-REC and how does it help in sustainability reports?
The I-REC, International Renewable Energy Certificate, is a global certificate that audibly proves that 1 MWh of energy was generated by a renewable source. By acquiring I-RECs together with the contracted energy, the company can declare that its electricity consumption is 100% renewable. This document is internationally recognized and is the main tool to zero Scope 2 emissions in sustainability reports, meeting the demands of investors, customers, and regulators.
Does migration to the free energy market affect the physical energy supply at my plant?
No. Migration is an exclusively commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity, network quality, and supply stability. The only change is who the company purchases the energy from and under what price and term conditions that purchase is made.
Conclusion: Put Your Energy in the Right Place
Reducing energy costs in a Group A company requires a layered approach, combining precise bill diagnosis, operational efficiency actions, and migration to the free energy market, the most impactful measure available for medium and high voltage consumers.
Serena Energia, with over 17 years of history and a position among the largest wind and solar generators created in the Americas, offers managed migration, energy consulting, and continuous management at no additional cost for clients under its management. The Serena Energia team conducts the process end‑to‑end, from feasibility analysis to monthly performance monitoring, with 100% renewable energy and I-REC certification included.
Companies such as Heineken, Cargill, and Bayer are already part of Serena Energia’s portfolio. The combination of electricity bill savings, budget predictability, and auditable sustainability credentials turns an operational cost into a competitive advantage.
Find out how much your company can save by migrating to the free energy market with Serena Energia.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *