How to scale operations efficiently and reduce costs?

Written by: André Lima, Growth, Serena Energia
Main lessons from this article
-
Group A companies can reduce energy costs by up to 20% by migrating to the free energy market, replacing regulated adjustments with fixed-price contracts and budget predictability.
-
Conducting feasibility analysis and mapping consumption profile are critical steps to avoid unsuitable contracts and to ensure that the negotiated volume reflects the company's operational reality.
-
Completing the full migration process takes 6 months and the retailer conducts all steps, eliminating the need for internal energy expertise and hiring new professionals.
-
Signing long‑term contracts with generators that have their own capacity, such as Serena Energia, increases supply security and reduces exposure to short‑term market price fluctuations.
-
To start the migration to the free energy market with specialized support and no additional cost, contact Serena Energia.
Why energy cost predictability is essential for scaling operations?
In the captive market, energy costs automatically rise with each tariff adjustment. Average adjustments approved by ANEEL for eight distributors ranged between 5% and 15% in April 2026, directly affecting the margin of companies that cannot negotiate these values. The average PLD also rose, with projections above R$ 300/MWh in 2026 and peaks that reached the regulatory ceiling in March of this year.
For a CFO or Operations Manager, this instability makes long‑term planning difficult. A global ABB survey with 2,700 senior executives in 2026 showed that almost 60% of companies report that rising energy costs continue to threaten profitability. In Brazil, this scenario is even more critical because the captive market offers no negotiation alternative.
In the free energy market, medium‑ and long‑term bilateral contracts lock in the energy price in advance. Companies that migrate to the free energy market achieve significant savings compared to the captive market, with multi‑year predictability that supports investment and expansion decisions without increasing operational complexity or staff.
Serena Energia, one of the largest wind and solar generators created in the Americas, conducts the entire migration process at no additional cost to the client and delivers 100% certified renewable energy. Request a cost‑saving study for your operation.

Prerequisites and initial conditions
Organizing documentation before migration increases the accuracy of the feasibility analysis and avoids delays in the 6‑month schedule. The company needs to gather information and align the involved areas before starting the process.
The required documents and data include:
-
energy invoices from the last 12 months, for mapping consumption profile and contracted demand
-
monthly consumption data in kWh and identification of seasonality or demand peaks
-
technical documentation of the consuming unit, such as voltage class and current tariff modality
-
legal and financial documentation of the company for registration with CCEE (Electric Energy Commercialization Chamber)
-
identification of the technical responsible for the unit and the internal focal point for the migration process
The areas typically involved are finance, operations and, when applicable, sustainability. Although these areas need to designate focal points, none of them need prior energy expertise, because Serena Energia assumes the technical and regulatory conduct of the entire process.
Initial validation checklist:
-
is the company connected to medium or high voltage (Group A)?
-
are the invoices from the last 12 months available for analysis?
-
is there an internal focal point designated to monitor the process?
-
is the unit's legal and technical documentation up to date?
-
is the financial leadership aligned with the contract term, typically 5 years?
Overview of the process in 5 macro steps
The migration to the free energy market follows a logical sequence of interdependent steps. The full process takes 6 months, from feasibility analysis to the start of supply in the new environment.
-
Conduct feasibility analysis and choose the retailer
-
Sign the energy contract
-
Conduct the managed migration process, with notification to the distributor, registration with CCEE and adaptation of the measurement system
-
Enter the free energy market and start saving
-
Perform continuous management and performance monitoring
Each step has clear owners, defined dependencies and specific attention points. Serena Energia acts as an end‑to‑end manager, which eliminates the need for internal energy expertise. Request your company's feasibility analysis.
Step‑by‑step: how to migrate to the free energy market while maintaining operational efficiency
Step 1: feasibility analysis and retailer selection
Objective: confirm the company's eligibility, map the consumption profile and project the expected savings in the free energy market.
Actions: the retailer analyzes the invoices from the last 12 months, identifies seasonality and demand peaks and presents a detailed study with the savings projection. Serena Energia conducts this analysis at no cost.
Internal owner: CFO or Operations Manager, as the focal point for providing invoices and validating the study assumptions.
Dependencies: availability of the invoices from the last 12 months and access to the unit's technical documentation.
Risks and attention points: incomplete invoices or inconsistent consumption data can delay the analysis. The retailer selection should consider financial solidity, own generation capacity and track record with similarly sized clients. Companies without own generation depend on third‑party purchases, which may represent greater exposure to price fluctuations.
Step 2: signing the energy contract
Objective: formalize the commercial terms, such as price, term, volume and energy source, that will govern supply in the free energy market.
Actions: the company negotiates and signs the bilateral contract with the retailer. Contracts with Serena Energia are typically 5 years, with fixed price and 100% wind energy. For companies with ESG goals, the contract may include the issuance of I‑RECs (International Renewable Energy Certificates), which certify the renewable origin of the consumed energy.

Internal owner: CFO, for approval of commercial terms, and legal, for contract review.
Dependencies: completion of the feasibility analysis and internal alignment on term and volume to contract.
Risks and attention points: long‑term contracts require careful analysis of consumption flexibility clauses. In 2026, companies that migrated to the free energy market began to prioritize structured contracts with protection against price fluctuations, after experiencing PLD spikes in the short‑term market.
See the contractual conditions suitable for your company's profile.
Step 3: managed migration process
Objective: execute all the bureaucratic and technical steps required for the company to enter the free energy market without operational impact.
Actions: Serena Energia fully conducts this process, which includes formal notification to the local distributor, registration of the company with CCEE with submission of technical, legal and financial documentation, and adaptation of the measurement system, with installation of mandatory hourly measurement equipment. Serena Energia assumes all these costs.
Internal owner: designated focal point, for providing documents and access to the unit for installation of measurement equipment.
Dependencies: signed contract and complete company documentation.
Risks and attention points: the regulatory deadline of 6 months to terminate the contract with the distributor is fixed. The sooner the company starts the process, the sooner it begins to save. Physical delivery of energy remains the responsibility of the local distributor during and after migration.
Step 4: entry into the free energy market and start of savings
Objective: activate supply in the free energy market and verify the start of savings on the invoice.
Actions: after the migration period, the company receives two invoices, one for energy from Serena Energia and one for distribution from the local distributor. Serena Energia centralizes management, represents the company before CCEE in the retail model and handles payment to the distributor.
Internal owner: finance department, for invoice validation and accounting entry.
Dependencies: completion of all migration steps and activation of the measurement system.
Risks and attention points: the first invoice in the free energy market should be compared with the captive market history to validate the projected savings. The panel
Serena Energia's digital platform displays monthly savings, consolidated savings, comparison between the captive market and the free energy market, consumption forecast and actual consumption.
Stage 5: continuous management and performance monitoring
Objective: maintain operational and budgetary efficiency throughout the entire contract term.
Actions: the company monitors the results monthly on the digital dashboard, with support from a dedicated Serena Energia consultant. Monitoring includes comparison between contracted consumption and actual consumption, identification of efficiency opportunities, and support for adjustments when needed.
Internal responsible: Operations Manager or Sustainability Manager, depending on the monitoring focus.
Dependencies: sharing consumption data with Serena Energia via CCEE, through the SCDE system, for accurate billing.
Risks and attention points: significant consumption variations relative to the contracted volume can generate settlements in the short‑term market. Serena Energia's active management monitors this exposure and advises adjustments to minimize impacts.
Common mistakes and how to avoid them
Starting the process without consumption profile analysis. Contracting energy without mapping seasonality and demand peaks can result in an inadequate contracted volume. Serena Energia's feasibility analysis, described in Stage 1, addresses this issue before contract signing.
Underestimating the migration timeline. The process takes 6 months. Companies that wait for the “ideal” moment to start lose months of savings. The sooner the company starts, the sooner it locks in prices before new tariff adjustments in the regulated market. This consideration connects directly to Stage 3, which depends on meeting the regulatory deadline.
Choosing a retailer without its own generation. Companies without own generation capacity depend on third‑party purchases to fulfill contracts, which can increase exposure to price fluctuations and supply risk. To reduce this exposure, the company should prioritize retailers that are also generators. Serena Energia, with vertical integration between generation and commercialization, reduces third‑party dependence and provides greater supply solidity, directly impacting Stages 1 and 2.
Ignoring the sustainability dimension. Migrating to the free energy market without purchasing I‑RECs means missing the opportunity to offset Scope 2 emissions in an auditable way. For companies with public ESG targets, this certification is essential for reporting and credibility with investors and stakeholders. This point should be considered already in Stage 2, during the definition of contractual conditions.
Not designating an internal focal point. Even with migration managed by Serena Energia, the company needs an internal responsible for providing documents and validating steps. The absence of this focal point delays the process and mainly affects Stages 1 and 3.
Frequently asked questions
Can any company in Group A migrate to the free energy market?
Yes. Group A includes medium‑ and high‑voltage consumers. Since January 2024, there is no minimum consumption to migrate; the company only needs to be connected at that voltage level. Serena Energia conducts a free eligibility analysis, assessing consumption profile and projecting expected savings for each consumer unit.
Does migration to the free energy market pose any risk of supply interruption?
No. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity and network quality, as described in Stage 3. What changes is from whom the company purchases the energy. Serena Energia, as a generator with robust installed capacity, guarantees the energy backing for 100 % of the contracted consumption.
What are I‑RECs and why are they relevant for companies with ESG goals?
The I‑REC (International Renewable Energy Certificate) is a global certificate that audibly proves that 1 MWh of energy was generated from a renewable source and injected into the grid. By contracting energy with I‑RECs through Serena Energia, a company can declare its electricity consumption as 100 % renewable, which is essential for sustainability reporting, meeting ESG targets, and satisfying investor and global supply‑chain requirements. Serena Energia has avoided more than 2.14 million tonnes of CO₂ since 2017.

How does billing work after migration?
After migration, the company receives two invoices: one for energy, referring to the supply from Serena Energia, and one for distribution, referring to the use of the local distributor’s network. In the retail model, Serena Energia centralizes management and handles payment to the distributor, reducing administrative complexity for the client. All this information, such as monthly savings, consolidated savings, comparison between the regulated market and the free energy market, consumption forecast and actual consumption, is available on the digital dashboard mentioned in Stage 4.
How long does it take for the company to start seeing savings on the bill?
The migration process takes 6 months, considering the period the distributor requires to terminate the current contract. From the first invoice after migration completion, the company pays the negotiated price in the Serena Energia contract, with savings directly reflected when compared to the historical regulated‑market rates. Therefore, starting the process as early as possible is a financially efficient decision.
Group A companies that treat energy as a strategic variable, rather than an uncontrollable fixed cost, build a stronger foundation to scale operations efficiently. When energy is managed strategically, it directly influences budgeting, planning, and business competitiveness. Migration to the free energy market with Serena Energia is a direct path to turning this cost into predictability, sustainability, and competitive advantage. Start your migration with specialized support.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *