How to reduce the company's fixed energy costs?

Written by: André Lima, Growth, Serena Energia
Key lessons of this article
-
In 2026, the electricity bill remains one of the main fixed expenses for Group A companies, and migrating to the free energy market reduces cost structurally and provides budget predictability.
-
Companies that migrate to the free energy market negotiate price, term, and volume directly with the supplier, eliminating regulated adjustments and tariff flags.
-
The migration process follows seven clear steps, requires six months' notice, and can be carried out by the marketer without a specific additional charge for this service.
-
After migration, monthly monitoring of consumption and results maintains savings and guides necessary adjustments.
-
With over 17 years of experience and 100% renewable energy, Serena Energia offers full support in migration and contract management. Talk to a consultant.
Why reducing fixed costs is urgent in 2026?
Reducing energy costs in 2026 is a direct way to protect margins in a scenario of pressure on operating expenses.
In the captive market, companies purchase energy with costs regulated by ANEEL, subject to annual adjustments and tariff flags that increase the bill during periods of water scarcity. This model limits long‑term financial planning and erodes margins unpredictably.
In the free energy market, the company negotiates directly with a supplier, setting price, term, and volume in advance. The local distributor remains responsible for the physical delivery of electricity. The difference lies in who supplies the energy and under what commercial conditions.
The result is a fixed and predictable cost, regardless of the conditions of the national electric system.

The table below summarizes the structural differences that explain why the free energy market offers greater cost control and budget predictability.
|
Attribute |
Captive market |
Free energy market (Serena Energia) |
|---|---|---|
|
Price definition |
Regulated by ANEEL, with periodic adjustments |
Negotiated in a long‑term bilateral contract |
|
Tariff flags |
Applicable, raise cost without notice |
Do not affect the contracted price |
|
Supplier choice |
No choice |
Company chooses the supplier |
|
Energy source |
No indication of renewable source |
100% renewable, with I‑REC certification available |
|
Potential savings |
No structural reduction |
Up to 20%, according to Serena Energia data |
Prerequisites to start the migration
Starting the migration requires prior organization of data and documents. These materials allow the marketer to develop the feasibility study accurately.
-
Energy bills from the last 12 months
-
Monthly consumption data in kWh and contracted demand in kW
-
Company CNPJ and legal documentation of the consumer unit
-
Confirmation of connection at medium or high voltage, i.e., classification in Group A
-
Involvement of the financial, legal, and operations or facilities areas
There is no minimum consumption to enter the free energy market. The company only needs to be part of Group A, which includes medium and high voltage consumers.
Overview of the process in 7 macro steps
The migration process follows 7 steps that organize from the initial analysis to continuous monitoring:
-
Verify eligibility, confirming classification in Group A
-
Analyze consumption profile, mapping seasonality and demand peaks
-
Choose a reliable marketer, evaluating solidity, experience, and management model
-
Register the company with CCEE (Electric Energy Commercialization Chamber), complying with the mandatory documentation process
-
Negotiate and sign the contract, defining price, term, and volume
-
Install the measurement system, adapting equipment to the free contracting environment
-
Monitor and adjust monthly, tracking results and identifying opportunities
Step 1 – Verify your company's eligibility in Group A
Confirming eligibility is the first filter to move forward. Group A gathers consumers served at medium or high voltage. Companies in this group are eligible to migrate to the free energy market.
Serena Energia can perform this analysis for free. The team evaluates the bills and the unit's consumption profile and indicates the savings potential.
Step 2 – Analyze the consumption profile
Understanding the consumption profile helps guide contract design. Mapping monthly consumption in kWh reveals seasonality, demand peaks, and the savings potential in the free energy market.
This analysis guides the choice of contract type and the volume to be contracted. The more precise the survey, the lower the risk of exposure to the short‑term market due to consumption deviations.
Step 3 – Choose a reliable marketer
Choosing the marketer defines the quality of the entire process. Companies without their own generation depend on buying energy from third parties, which can represent higher supply risk.
Serena Energia is among the largest wind and solar generators created in the Americas, with over 17 years of history and clients such as Heineken, Cargill, and Bayer. This integration between generation and commercialization brings solidity and competitiveness to the contract.

Serena Energia offers managed migration, taking on the entire bureaucratic process at no additional cost to the client. After migration, a dedicated consultant monitors the contract and cost‑reduction performance monthly.
See how managed migration works in practice: simulate your company's discount with Serena Energia.
Step 4 – Register the company with CCEE (Electric Energy Commercialization Chamber)
Registering the company with CCEE formalizes entry into the free energy market. The process involves sending technical, legal, and financial documentation.
Serena Energia conducts all stages of this registration and guides the company at each phase, reducing rework and delays.
Step 5 – Negotiate and sign the contract
Defining the contract consolidates the commercial conditions of the migration. Contracts in the free energy market are bilateral and long‑term, usually between three and five years. The price is agreed in advance, which eliminates the uncertainty of tariff flags.
In the retail model, the client does not purchase a fixed volume of energy. The company locks in the price and, at the end of each month, the invoice is calculated based on the actual consumption multiplied by the contracted price. Serena Energia offers savings of up to 20% compared to the regulated market.
Contract management studies indicate that 9% of the value of energy contracts can be lost due to unmonitored obligations and neglected commercial clauses. Having an experienced manager significantly reduces this exposure.
Step 6 – Install the measurement system
Adapting the measurement system enables operation in the free energy market. Hourly measurement is mandatory and the company needs equipment compatible with the free contracting environment.
Serena Energia is responsible for installing this equipment and coordinates the adaptation with the distributor, preserving operational continuity.
Step 7 – Monitor and adjust monthly
Monitoring results consolidates savings over time. After migration, monthly monitoring allows comparing costs with the captive market period, identifying consumption deviations and guiding adjustments.
Serena Energia provides a digital dashboard with monthly bill savings, consolidated savings, comparison between captive and free energy markets, consumption forecast and actual consumption. A dedicated consultant is available for questions and performance monitoring.
Common mistakes that compromise savings
Inadequate timeline planning. The migration process takes 6 months, the legal deadline required to terminate the contract with the distributor. Since this period is fixed and mandatory, companies that do not start the process early unnecessarily postpone the start of savings by at least half a year.
Incorrect consumption sizing. Contracting a volume far above or below actual consumption exposes the company to the short‑term market, where prices can be unfavorable. Detailed consumption profile analysis, done before signing the contract, is the main way to mitigate this risk.
Lack of continuous monitoring. Savings in the free energy market do not occur automatically after migration. Monthly monitoring of actual consumption and In relation to the contracted and the comparison with the cost that would be paid in the captive market, they are essential to verify and preserve the results.
How to verify the results?
Monitoring clear indicators helps to prove the savings and the quality of the contract:
-
Monthly invoice variation: direct comparison between the amount paid in the free energy market and the estimated amount that would be paid in the captive market for the same period
-
Budget predictability: stability of energy cost in financial planning, without impact of tariff flags
-
Issuance of I-RECs: volume of certificates issued per MWh consumed, used in sustainability reports and ESG goals
Serena Energia provides all this data in its digital dashboard, visible from the first invoice received after the plan is set up.
Advanced options for companies with multiple units or sustainability goals
Centralizing energy management in companies with multiple consumer units simplifies control and expands bargaining power. These companies can structure contracts that cover all units, which facilitates monitoring and increases the contracted volume.
Serena Energia serves companies throughout Brazil in the free energy market.
For organizations with public emission reduction targets, Serena Energia issues I-RECs (International Renewable Energy Certificates) for each MWh consumed.
These certificates verify, in an auditable and globally recognized way, that the consumed energy originates from renewable sources, being the main tool to zero Scope 2 emissions. Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂.

For companies that aim to go further and neutralize other emission sources, Serena Energia offers carbon credits from certified projects, complementing the sustainability strategy.
If your company has multiple units or public sustainability goals, talk to one of our consultants to structure the ideal solution for your profile.
Frequently Asked Questions
Can my company migrate to the free energy market?
Any Group A company, connected at medium or high voltage, can migrate to the free energy market, with no minimum consumption. Serena Energia conducts the eligibility analysis for free, based on invoices and the unit's consumption profile.
How long does the migration process take?
The regulatory process takes 6 months, the legal deadline required to terminate the contract with the distributor. Serena Energia handles all stages for the client. The sooner the company starts, the sooner it begins to save.
Is there a risk of the company losing power during or after the migration?
There is no such risk. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity and grid stability. The only change is who supplies the energy to the company.
What happens if the actual consumption differs from the contracted amount?
In Serena Energia's retail model, the client does not contract a fixed volume of energy. The company locks in the price and pays based on the consumption each month. This eliminates the exposure risk from volume deviation that exists in wholesale contracts.
What is the I‑REC and why is it relevant for the company?
The I‑REC (International Renewable Energy Certificate) is a global certificate that verifies, in an auditable way, that 1 MWh of energy was generated by a renewable source and injected into the grid.
By acquiring I‑RECs together with the contracted energy, the company can declare that its electricity consumption is 100 % renewable, meeting sustainability reporting requirements and ESG goals for investors, customers, and regulators.
Is it necessary to install solar panels to have discounted renewable energy?
It is not necessary to install solar panels. Serena Energia generates energy in its large‑scale, high‑efficiency wind farms. The local distributor delivers this energy to the consumer unit. There is no installation cost for generation equipment at the company.
When does the company start seeing savings on the bill?
The company begins to see savings from the first invoice received after the plan is set up, up to 60 days after the start of supply in the free energy market.
How to request a proposal from Serena Energia?
The process starts with a simulation on Serena Energia's website, where you can view the price and request a formal proposal based on the company's consumption profile. A dedicated consultant oversees the entire process, from feasibility analysis to monthly management after migration.
Conclusion
For Group A companies, migrating to the free energy market in 2026 is a direct path to structurally reduce fixed costs. The process involves 7 well‑defined steps, a 6‑month timeline, and with Serena Energia, migration and management are included in the service.
The result is the aforementioned savings, budget predictability, and 100 % certified renewable energy.
With the history and solidity already presented, Serena Energia offers the technical support that financial and operations managers require to make this decision safely.
Join companies like Heineken, Cargill and Bayer: simulate your savings with Serena Energia.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *
