How do competitors achieve lower prices and higher profit?

Written by: André Lima, Growth, Serena Energia
Key takeaways from this article
-
Competitors that offer lower prices usually control operational costs, such as electricity, which many companies treat as fixed and inevitable.
-
Hidden costs such as tariff flags, excessive contracted demand, and administrative inefficiencies compress the real margin and limit competitiveness.
-
Group A companies can reduce energy costs through internal efficiency, self‑generation, or migration to the free energy market, the latter being the most accessible option and requiring no investment in generation infrastructure.
-
In the free energy market, it is possible to lock prices for 3 to 5 years, obtain budget predictability and, optionally, contract renewable energy with I‑REC certification.
-
To turn energy into a competitive advantage, contact Serena Energia.
How to calculate the real margin considering hidden operational costs?
The real margin of an operation depends on all costs that affect the result, not just raw materials and labor.
Rising input costs, including energy, often exceed the ability to pass them on to the final price. This pressures industrial profitability and makes structural cost reduction a necessity. When these costs are not mapped accurately, the budgeted margin diverges from the actual margin at month‑end.
Some relevant operational costs often fall off the radar:
-
Having electricity with tariff flags: in the regulated market, tariffs undergo periodic adjustments and the application of flags that raise costs during periods of water scarcity. This component can represent a significant portion of operational expenses. Many companies treat this amount as fixed, although there is room for negotiation when migrating to the free energy market.
-
Having contracted demand outside the real profile: companies that do not periodically review the contracted demand with the distributor pay for capacity they do not use.
-
Having unplanned maintenance costs: the Kaizen Institute cites adjusting energy consumption based on real equipment usage data as a concrete example of smart industrial cost reduction. Failures and unplanned shutdowns increase specific consumption per unit produced.
-
Having administrative inefficiencies: the reduction of OPEX, according to the Kaizen Institute, prioritizes efficiency gains in operational and business support costs, such as energy, maintenance and administrative functions, and not only costs directly linked to the production of each unit.
The accumulated financial impact of these items affects cash flow, reduces investment capacity and limits the ability to price competitively without sacrificing profitability. Companies that map and control these costs gain space to price more aggressively without compromising results. Once the energy impact on margin is identified, the next step is to evaluate the alternatives available for Group A companies to reduce this cost structurally.
Request an analysis of the energy impact on your company's margin.
What are the main solution categories to reduce energy costs?
Group A companies, with medium or high voltage supply, have three main pathways to reduce electricity cost.
1. Implement internal energy efficiency: this avenue includes equipment replacement, process automation and active consumption management. The Kaizen Institute differentiates waste reduction and operation redesign to generate more value with the same or fewer resources rather than indiscriminate cuts that harm future competitiveness. This approach reduces the volume consumed, but does not change the price paid per MWh.
2. Adopt self‑generation of energy: the company installs its own generation infrastructure. This option requires high capital investment and long implementation timelines, reducing short‑term liquidity. It also generates ongoing operation and maintenance costs and requires the company to develop competence in a sector outside its core business. This focus shift can consume resources that would otherwise be applied to strategic core‑business activities.
3. Migrate to the free energy market: the company keeps its physical operation unchanged and begins negotiating price, term and source of energy directly with qualified suppliers. The local distributor remains responsible for the physical delivery of electricity, with no change to the consumer unit’s infrastructure. This model converts a variable, unpredictable cost into a negotiated, more stable expense, without requiring investment in own generation.

Each category requires different levels of capital, timeline and operational complexity. The choice depends on consumption profile, financial structure and strategic objectives of each company.
Discover which cost‑reduction path applies to your consumption profile.
Free energy market versus regulated market: what’s the practical difference?
|
Criterion |
Regulated market |
Free energy market |
|---|---|---|
|
Energy price |
Defined by ANEEL, subject to adjustments and tariff flags |
Negotiated in a bilateral contract, usually fixed for 3 to 5 years |
|
Budget predictability |
Low, tariff flags change the cost monthly |
High, price agreed in advance |
|
Supplier choice |
No choice, the supplier is the local distributor |
The company chooses among qualified suppliers |
|
Physical delivery of energy |
Local distributor |
Local distributor, no change |
|
Management complexity |
Low, a single distributor invoice |
Higher, but manageable with a specialized partner |
|
Sustainability |
No source choice or origin certification |
Possibility to contract renewable energy with I‑RECs and carbon credits |
|
Eligibility |
All consumers |
Group A companies, with medium or high voltage supply |
In the retail model of the free energy market, a marketer such as Serena Energia, one of the largest wind and solar generators created in the Americas, represents the company before the CCEE (Electric Energy Commercialization Chamber), handles sector obligations and simplifies management for the client. In the wholesale model, the company acts directly as an agent in the CCEE and manages its own risks and contracts, a scenario more suitable for large consumers with a dedicated internal structure.
Step‑by‑step to evaluate migration to the free energy market
Migrating to the free energy market follows a structured process. Knowing each stage in advance reduces risks and speeds up the start of savings.
1. Verify eligibility: confirm that the company belongs to Group A. There is no minimum consumption required; simply being in this group is enough.
2. Gather consumption history: collect invoices from the last 12 months to map seasonality, demand peaks and the current contracted demand. This data serves as the basis for any feasibility analysis.
3. Request a technical‑financial feasibility study: a qualified supplier analyzes the consumption profile and projects the expected savings in the free energy market. Serena Energia performs this analysis at no cost to the client.
4. Choose the contracting model and supplier: assess financial solidity, proven experience, own‑generation capacity and quality of technical support. Suppliers without own generation rely on purchasing energy from third parties, which may increase exposure to supply risks.
Receive a personalized feasibility study at no cost.
5. Formalize the contract and start migration: after formalization, the supplier conducts the bureaucratic process with the distributor and the CCEE. Serena Energia fully assumes this process, including installation of measurement equipment, at no additional cost for clients under its management.
6. Await the transition period: the regulatory process takes about six months, during which the supplier manages all steps. The sooner the company starts, the sooner it begins to save.
7. Monitor results: after activation, track monthly actual consumption versus contracted, accumulated savings and any necessary adjustments. Serena Energia provides a digital dashboard comparing regulated and free markets, consumption forecasts and consolidated savings.
The most common mistake in this process is delaying the decision due to perceived complexity. With a partner that manages migration end‑to‑end, the operational impact on the company remains minimal.

Frequently asked questions about the free energy market and profit margin
What is the free energy market and how does it affect profit margin?
The free energy market allows Group A companies to choose from whom to purchase electricity and negotiate price, term, and source. The local distributor remains responsible for the physical delivery of electricity, as in the regulated market. By fixing the electricity price in a multi‑year contract, the company eliminates monthly variations of the regulated market and gains budget predictability, which facilitates price and margin planning.
Does my company need a minimum consumption to migrate?
No. There is no minimum consumption to enter the free energy market. The only requirement is belonging to Group A, with medium or high voltage supply. Serena Energia conducts the eligibility analysis at no cost.
Can migration to the free energy market interrupt electricity supply?
No. Migration is a commercial and contractual process. The local distributor remains obligated to deliver electricity to the consumer unit. The only change is the supplier that sells the electricity to the company. The risk of interruption in physical supply remains the same.
How long does the migration take and who manages the process?
The regulatory process takes about six months, the period needed to terminate the contract with the distributor and complete registration with CCEE (Electric Energy Commercialization Chamber). Serena Energia manages all stages, including the installation of measurement equipment, at no additional cost for clients under its management. The client does not need to deal with the bureaucracy of the electric sector.
What are I‑RECs and why are they relevant for companies with ESG goals?
The I‑REC, International Renewable Energy Certificate, is a global certificate that auditable proves that a certain volume of electricity was generated from a renewable source. By contracting electricity with I‑REC issuance, the company can declare 100% renewable consumption in sustainability reports and meet the demands of investors, customers, and regulators. Serena Energia issues I‑RECs corresponding to the client’s consumption and also offers carbon credits to offset other emission sources.
Next step to recover profit margin
Competitors that offer lower prices with higher margins usually control operational costs that many companies in the regulated market treat as inevitable. Electricity is a direct and actionable example of this category for Group A companies.
The free energy market turns this variable and unpredictable cost into a negotiated expense, more stable and aligned with sustainability goals. Migration does not require investment in own infrastructure, does not change the physical delivery of electricity, and can be fully managed by a specialized partner.
The most concrete step the company can take now is to organize the electricity invoices from the last 12 months and the contracted demand history. With these data in hand, it becomes possible to request a feasibility study and obtain a clear projection of the impact on margin before any decision.
Serena Energia, one of the largest wind and solar power generators created in the Americas, offers managed migration to the free energy market at no additional cost for clients under its management, certified renewable energy with I‑RECs and carbon credits, as well as a digital dashboard to monitor savings month by month.
Contact Serena Energia and turn energy cost into a competitive advantage for your business.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *
