Contracts in the free energy market: complete guide

Written by: André Lima, Growth, Serena Energy
Key lessons of this article
- Since January 2024, Group A companies can migrate to the free electricity market and replace regulated tariffs with bilateral contracts with a fixed price.
- Free market electricity contracts require attention to volume flexibility clauses, termination penalties, and choosing a supplier with its own generation.
- The retail model allows negotiating price in advance, keeping the local distributor for physical delivery, and receiving two invoices managed by the marketer.
- I-REC certificates issued by generators such as Serena Energy ensure renewable traceability and meet the requirements of the GHG Protocol 2026 for ESG reporting.
- To structure your contract in the free electricity market with migration at no additional cost, contact Serena Energy.
Essential concepts to understand contracts
Mastering some basic concepts facilitates the evaluation of proposals in the free electricity market.
CCVE (Energy Purchase and Sale Contract): is the bilateral instrument signed between buyer and supplier, which defines volume, term, price, and delivery conditions. The CCVE is registered with the CCEE (Electric Energy Commercialization Chamber).
CUSD (Distribution System Use Contract): regulates access to the local distributor's network. Even in the free electricity market, the company maintains this contract, as the distributor continues delivering electricity physically.
Fixed price versus indexed price: fixed-price contracts allow the company to pay the negotiated tariff regardless of spot market fluctuations, while indexed contracts settle deviations between actual and contracted consumption through the PLD (Settlement Price of Differences), which can generate significant additional costs during periods of high PLD. In the free electricity market, it is possible to fix the price for up to five years, which eliminates the unpredictability of tariff flags.
Volume flexibility: contracts in the free electricity market must include flexibility margins for seasonal consumption variations, which reduces the risk of additional costs due to volume deviations, especially for companies with variable demand.
Short‑term market settlement: when actual consumption differs from the contracted volume beyond the flexibility range, the difference is settled by the PLD. The PLD is the most unpredictable variable in the Brazilian electric system, and can be impacted by prolonged droughts and unexpected thermal dispatches.
Now that you know the fundamental terms, see how these concepts are reflected in practice in the two contracting models.
Captive market versus free electricity market: practical comparison
| Criterion | Captive market | Free electricity market |
|---|---|---|
| Cost predictability | Low, subject to tariff flags and ANEEL's annual adjustments | High, with price agreed in advance in the bilateral contract |
| Supplier choice | No, local distributor mandatory | Yes, company chooses generator or marketer |
| Operational complexity | Low, a single distributor invoice | Manageable, two invoices (energy and distribution), with management done by the supplier in the retail model |
| Renewable traceability | Not available | Available through I-REC certificates |
In the retail model of the free electricity market, intended for companies that do not wish to act directly as agents in the CCEE, a marketer such as Serena Energy intermediates the process and assumes regulatory and financial management. The client does not contract a fixed volume of energy, defines the price, and pays based on the consumption realized each month.
Elements that should be evaluated before contracting
The consumption profile analysis is the starting point. Mapping monthly consumption in kWh shows seasonality and demand peaks that guide the choice of contract type and the volume to be negotiated.
Volume flexibility clauses deserve special attention. As seen in the concepts section, deviations outside the agreed range generate costs in the short‑term market. Therefore, the contractual flexibility range must reflect the company's actual consumption variation.
Early termination penalties also require careful analysis. Free market electricity contracts often include take‑or‑pay clauses, which oblige the buyer to pay for a minimum contracted volume regardless of actual consumption, which represents the main financial impact in terminations without cause.
The financial and operational solidity of the supplier is another critical factor. When a marketer is disconnected from the CCEE due to closure, the existing contract is automatically voided and the consumer must contract a new supplier or request a return to the captive market within the deadline set by the CCEE. Working with a generator that has its own generation and a solid track record reduces this risk.

Typical steps for migration to the free electricity market
1. Eligibility verification and consumption analysis
The first step is to confirm that the company belongs to Group A, medium and high voltage consumers. There is no minimum consumption, just being in this voltage range. Serena Energy conducts this eligibility analysis at no cost.
2. Feasibility study and supplier selection
Based on previous invoices, the supplier projects the contractual conditions. Choosing a marketer with its own generation reduces supply risks.
3. Contract closing
Free market electricity contracts usually have a term of three to five years. The price is agreed at this moment and remains fixed during the term, regardless of tariff flags.
4. Migration process
The migration stage begins with notification to the distributor, which leads to registration with the CCEE. This registration requires adaptation of the measurement system and installation of the equipment needed for the new contracting modality. Serena Energy assumes the entire process at no additional cost to the client and coordinates each step in sequence.
5. Start of supply
After approximately six months from the start of the process, the period required to terminate the contract with the distributor, the company begins operating in the free electricity market and starts enjoying the negotiated conditions.
Operation after contracting
In the retail model, Serena Energy represents the company before the CCEE and handles all sector obligations, such as financial settlements and consumption data submission. The client receives two invoices, one for energy and another for distribution, and has a dedicated consultant for monitoring.
Serena Energy provides a digital dashboard with monthly savings tracking, comparison between captive and free electricity markets, consumption forecast and actual consumption. This continuous monitoring allows identifying deviations before they generate additional costs in the short‑term market.
For ESG managers, the post‑contract operation includes the issuance of I‑REC certificates corresponding to monthly consumption. The 2026 update of the GHG Protocol to the market‑based method requires greater geographic and temporal matching between consumption and renewable energy certificates, as well as greater transparency on emission factors. The I‑RECs issued by Serena Energy meet these criteria and are globally recognized for Scope 2 emission reductions.

Common risks, limitations and frequent mistakes
Volume deviations: over‑consumption exposes the buyer to the PLD, which can rise sharply during periods of water scarcity or high demand. Continuous consumption monitoring and the use of energy management tools reduce this exposure.
Choosing a supplier without its own generation: marketers without their own generation depend on purchasing energy from third parties, which can represent an additional supply risk. Vertical integration, with generation and marketing in the same company, provides greater operational solidity.
Contracts without adequate flexibility clauses: standard mitigation includes comparing proposals from multiple marketers, requesting total cost simulations that consider distributor tariffs and charges, and evaluating the consumption profile including peak hours and seasonality.
Before signing any contract, request a detailed analysis of the specific risks of your consumption profile.
Summary and practical next steps
Energy contracts in the free electricity market offer Group A companies, medium and high voltage consumers, cost predictability, supplier choice, and renewable traceability. Proper contract structuring, with flexibility clauses suited to the consumption profile, clear penalties, and a supplier with its own generation, distinguishes a successful migration from unnecessary exposure to the short‑term market.
Serena Energy provides its own wind generation, managed migration at no additional cost, complete regulatory management in the retail model, and issuance of I‑RECs for traceability.
ESG capability. With more than 17 years of history and 2.14 million tonnes of CO₂ avoided since 2017, the company offers an end‑to‑end journey for companies seeking financial predictability and proven sustainability.

Internal assessment checklist: confirm eligibility in Group A, map monthly consumption and seasonality, assess desired contract term (typically three to five years), verify if the supplier has its own generation, check flexibility clauses and penalties, define need for I-REC certificates for ESG reporting.
Ready to migrate? Start your journey in the free energy market with Serena.
Frequently Asked Questions
Can any Group A company migrate to the free energy market?
Yes. Since January 2024, any company connected at medium or high voltage, the so‑called Group A, can migrate to the free energy market, regardless of consumption volume. There is no mandatory minimum consumption. Serena Energia conducts the eligibility analysis at no cost to the interested party.
What is the practical difference between fixed‑price contracts and indexed contracts in the free energy market?
In fixed‑price contracts, the company pays the negotiated amount regardless of spot market conditions. This eliminates the unpredictability of tariff flags and allows long‑term budget planning. In indexed contracts, deviations between actual and contracted consumption are settled by the PLD, which can fluctuate sharply during periods of water scarcity or high thermal demand. For companies with low tolerance for cash‑flow variations, fixed price tends to be the most suitable model, even with a slightly higher initial cost.
What happens if my company consumes more or less energy than contracted?
Contracts in the free energy market provide a flexibility band for normal consumption variations. Deviations beyond this band are settled by the PLD in the short‑term market, as explained in the section on contractual elements. Serena Energia actively monitors the consumption of clients under its management to minimize this exposure.
What is the I‑REC and how does it apply to sustainability reports?
The I‑REC (International Renewable Energy Certificate) is a traceable digital certificate that proves that 1 MWh of energy was generated from a renewable source and injected into the grid. This certificate is the globally recognized instrument to declare that a company's electricity consumption is 100 % renewable and is essential for Scope 2 emissions reduction in sustainability reports. In 2026, updates to the GHG Protocol for the market‑based method require greater rigor in matching consumption with certificates. Serena Energia issues I‑RECs corresponding to each client’s consumption and meets these criteria.
Can migrating to the free energy market interrupt my company's electricity supply?
No. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity and grid stability, regardless of who supplies the energy. The only change is the supplier with whom the company has the power purchase contract. Serena Energia handles the entire migration process, which includes notifying the distributor, registering with CCEE, and adapting the metering system, at no additional cost and without impact on the client’s operation.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *
