Growth of renewable energy in Brazil: challenges in 2026

Written by: André Lima, Growth, Serena Energia
Key lessons from this article
-
Renewable expansion in Brazil has increased tariff instability and curtailment, making the regulated market a significant source of budgetary risk for Group A companies.
-
Migrating to the free energy market allows setting a price in a long‑term contract, receiving auditable I‑RECs, and aligning with ESG goals without the need for high upfront investment.
-
The migration process follows a fixed regulatory timeline and includes registration with the CCEE (Electric Energy Commercialization Chamber), measurement adaptation, and active contract management, carried out by the retailer.
-
Companies that remain in the regulated market continue to be subject to tariff flags and annual adjustments, while those that migrate gain cost predictability and renewable certification.
-
To turn uncertainty into a competitive advantage, contact Serena Energia and simulate your discount.
Problem size and impact
The accelerated renewable expansion has not eliminated tariff instability for those in the regulated market. The green, yellow, red‑1 and red‑2 tariff flags continue to be applied according to hydro‑reservoir conditions. This mechanism makes long‑term budget planning an exercise in uncertainty. For companies whose energy consumption represents a significant share of operating expenses, this unpredictability erodes margins and hampers product and service pricing.
Decarbonization pressure adds a second layer of risk. Investors, corporate customers and regulators require companies to consistently prove the renewable origin of their energy. Without an auditable certificate such as the I‑REC (International Renewable Energy Certificate), sustainability statements lose weight in annual reports and supply‑chain audits.
Beyond tariff unpredictability and certification pressure, the third risk vector comes from the renewable expansion itself. Curtailment is the forced interruption of renewable generation due to lack of transmission capacity or localized oversupply. The National Electric System Operator (ONS) projects that curtailment in wind and solar plants could reach up to 40 GW per year between 2027 and 2030, concentrated during solar generation peak hours. By August 2025, cumulative curtailment since 2021 in Brazil approached 26.21 TWh, and the cuts from January to August 2025 were 230% higher than the total recorded for the entire year of 2024. Market reports indicate curtailment rates in Brazilian renewable projects between 15% and 25% in the second quarter of 2026, with Fitch assigning a negative outlook to 11 renewable project financings in the country in May 2026.

For companies in the regulated market, curtailment does not represent a direct supply risk. The local distributor remains responsible for the physical delivery of electricity. The impact appears indirectly. Reduced effective renewable supply in certain periods pushes the PLD upward, and additional generator costs tend to be passed on to regulated tariffs over time.
Main solution categories
Group A companies seeking to reduce costs and advance ESG goals can follow three main paths. Each alternative presents a different level of investment, complexity, and time to first result.
Staying in the regulated market means continuing to purchase electricity from the local distributor at rates set by ANEEL, with annual adjustments and tariff flags. This option requires no additional action from the company, but it offers no control over the price paid nor structured access to renewable origin certificates.
Migrating to the free energy market, in the Free Contracting Environment (ACL), allows negotiating directly with a generator or retailer the supply conditions, such as price, term, volume and source. The local distributor remains responsible for the physical delivery of electricity. What changes is the energy supplier. The process involves registration with the CCEE (Electric Energy Commercialization Chamber), measurement system adaptation and a regulatory timeline until supply begins in the new environment.

Investing in self‑production means building or financing your own generation infrastructure. This choice offers a high degree of autonomy, but requires substantial capital, long implementation timelines, ongoing operation and maintenance costs, and the need to develop competencies in a sector outside the company’s core business.
Comparison between alternatives
The table below compares the three alternatives across four dimensions relevant to decision‑making. The data reflect the Brazilian context in 2026.
|
Criterion |
Regulated market |
Free energy market |
Self‑production |
|---|---|---|---|
|
Initial investment |
None |
Measurement adaptation costs, covered by Serena Energia for clients under its management |
High, with deployment of own generation infrastructure |
|
Cost predictability |
Low, subject to annual adjustments and tariff flags |
High, with price defined in a bilateral contract, usually 3 to 5 years |
Medium to high after investment amortization |
|
Time to first result |
Not applicable |
6 months until the start of supply in the new environment |
Years, including project, licensing and construction |
|
ESG alignment with auditable certification |
Limited, without source traceability by default |
High, with I‑RECs issued per MWh consumed and Scope 2 emissions offset |
High, but requiring own certification structure |
The distribution portion, which corresponds to the use of the local distributor’s grid, remains regulated in any of the three scenarios. Savings in the free energy market apply to the contracted energy portion, not to the entire bill.
How to evaluate and implement a solution
The decision to migrate to the free energy market starts with a structured diagnosis. The steps below describe the process from the consumer company’s perspective.
1. Invoice collection and consumption diagnosis
Gathering the invoices from the last 12 months allows mapping monthly consumption in kWh and identifying seasonality and demand peaks. This collection also shows the current bill composition, with energy, TUSD (Distribution System Use Tariff), charges, flags and taxes. This set of information forms the basis of the feasibility study.
2. Eligibility verification for Group A
Any company connected at medium or high voltage, Group A, can migrate to the free energy market, regardless of consumption level. Verification is done from the invoice itself, which indicates the tariff sub‑group. Serena Energia performs this eligibility analysis at no cost.
3. Technical and economic‑financial assessment
With the consumption profile in hand, the retailer projects the expected savings, cash‑flow impact and contract terms. Abraceel data indicate that long‑term prices in the free energy market rose 59% between January 2024 and March 2026. This movement reinforces the importance of contracting early and with a generator that has its own energy backing.
4. Contracting and registration with the CCEE (Electric Energy Commercialization Chamber)
The bilateral contract defines price, term, volume and source. Registration with the CCEE is mandatory and involves technical, legal and financial documentation. In the retail model, the retailer represents the company before the CCEE and assumes sectoral obligations. Serena Energia conducts the entire process with no additional cost for clients under its management.
5. Measurement system adaptation
Hourly measurement is mandatory in the free energy market. Installation of compatible equipment is the responsibility of Serena Energia, at no extra cost to the client.
6. Continuous monitoring
After migration, monthly monitoring of results allows comparing costs with the period in the regulated market. This monitoring also identifies consumption deviations from the contracted amount and guides adjustments. Serena Energia provides a digital dashboard with monthly savings, consolidated savings, comparison between regulated and free markets, consumption forecast and actual consumption.
From a governance perspective, including flexibility clauses in the contract, usually between 5% and 10% of the contracted volume, helps to aco
adjust operational variations without excessive exposure to the PLD. This margin of maneuver reduces the risk of consumption outside the contracted range, which exposes the company to the market spot price. Serena Energy offers active management that monitors these variations and adjusts positions to minimize this exposure.Use cases and generic examples
The scenarios below are hypothetical and illustrate how companies in different sectors can benefit from migrating to the free electricity market.
Mid‑size industry. An industrial plant with medium‑voltage supply faces annual tariff adjustments that make it difficult to price long‑term contracts with customers. After migrating to the free electricity market with a five‑year fixed‑price contract, the company treats electricity cost as a predictable variable in its pricing model. The monitoring dashboard allows identification of demand peaks and guides efficiency projects without altering production operations.

Hotel chain. A chain with units in different states deals with occupancy seasonality and consumption variation throughout the year. The contractual flexibility of the free electricity market, with a tolerance band of 5% to 10% of the contracted volume, accommodates this variation. Issuing I‑RECs for each MWh consumed strengthens the chain’s sustainability reports with international operators that require proof of renewable origin.
High‑voltage retailer. A retailer with a distribution center connected at high voltage has public Scope 2 emission‑reduction targets. Procuring certified wind energy in the free electricity market, with I‑REC issuance, allows the declaration of 100% renewable consumption in an auditable way. This move meets the demands of investors and programs such as RE100.
Frequently asked questions
What is the free electricity market and how does it work for Group A companies?
In the free electricity market, Group A companies with medium or high‑voltage supply can choose from whom they buy electricity and negotiate price, term, volume and source directly with a generator or marketer. The local distributor remains responsible for the physical delivery of electricity and grid maintenance. What changes is the commercial relationship. Instead of buying electricity at rates regulated by ANEEL, the company signs a bilateral contract with pre‑agreed conditions. There is no minimum consumption to participate; the company only needs to belong to Group A.
Does renewable energy curtailment affect companies that migrate to the free electricity market?
Curtailment affects generators, not end‑consumers. The local distributor is legally obliged to deliver the contracted electricity, regardless of operational restrictions in the transmission system. For the consumer in the free electricity market, the relevant risk is exposure to the PLD when actual consumption falls outside the contract’s flexibility band. Active contract management, like that offered by Serena Energy, reduces this exposure by monitoring consumption and adjusting positions when needed.
How long does migration take and when does the company start saving?
The regulatory migration process takes six months, counted from the notification to the distributor. Savings begin on the first invoice after migration is completed. Serena Energy handles all stages of the process, including registration with CCEE (Electric Energy Commercialization Chamber), measurement system adaptation and continuous management, at no additional cost for clients under its management. Therefore, the sooner the company starts the process, the sooner it begins to save.
How does the free electricity market contribute to ESG goals and decarbonization?
Procuring renewable energy in the free electricity market allows the issuance of I‑RECs, international certificates that audibly prove each MWh consumed was generated by a clean source. These certificates are the main tool for zeroing Scope 2 emissions in sustainability reports. This capability meets the demands of investors, corporate customers and global programs such as RE100. Serena Energy also offers carbon credits for companies seeking to neutralize other emission sources.
What are the real risks of migrating to the free electricity market?
The main risks are exposure to the PLD when actual consumption falls outside the contractual flexibility band, ongoing regulatory obligations to CCEE (Electric Energy Commercialization Chamber), and the time until savings begin. None of these risks imply interruption of electricity supply, as the local distributor continues to be responsible for physical delivery. In the retail model, the marketer assumes representation before CCEE and management of sectoral obligations, significantly reducing the operational burden for the consuming company.
Conclusion: the next step starts on your invoices
The growth of renewable energy in Brazil in 2026 redefines the competitive environment for Group A companies. With wind and solar accounting for 26.4% of Brazilian electricity generation in 2025 and 4.4 GW of solar added just in the first quarter of 2026, expansion continues to pressure the transmission system and create PLD fluctuations that are reflected in regulated tariffs.

For companies that remain in the regulated market, this scenario means staying exposed to annual adjustments and tariff flags without control over the price paid. For companies that migrate to the free electricity market with proper planning, the same scenario opens the opportunity to set electricity price in a long‑term contract, obtain auditable renewable certification and free operational resources for business growth.
The starting point is to gather the invoices from the last 12 months and request a feasibility study. Serena Energy, one of the largest wind and solar generators created in the Americas, with over 17 years of history and clients such as Heineken, Cargill and Bayer, conducts the entire migration process at no additional cost for clients under its management, from eligibility analysis to continuous management in CCEE (Electric Energy Commercialization Chamber).

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *