Tips for cutting fixed expenses in 2026: Group A guide

Written by: André Lima, Growth, Serena Energia
Main lessons from this article
-
Group A companies can turn the electricity bill, one of the most significant fixed expenses, into a controlled cost by migrating to the free electricity market.
-
A comprehensive audit of recurring contracts for telecom, insurance, logistics, and banks reveals quick reduction opportunities without operational impact.
-
The migration process to the free electricity market follows seven structured steps and takes about six months, requiring early planning.
-
Fixed-price contracts in the free electricity market eliminate exposure to tariff flags and provide budget predictability even when the regulated market fluctuates.
-
To start your migration with up to 20% savings and full support, contact Serena Energia.
Overview: 6 main steps to reduce fixed expenses
The complete fixed expense reduction process for Group A companies follows this sequence, prioritizing quick gains in recurring expenses before the energy migration, which takes longer and generates the biggest financial impact:
-
Audit of existing contracts
-
Telecom renegotiation
-
Review of insurance and recurring service contracts
-
Bank fee optimization
-
Transportation and logistics analysis
-
Migration to the free electricity market
After implementing these six steps, the company should set up continuous KPI monitoring and assess expansion to multiple units, topics detailed in the final sections of this guide.
Step 6 usually generates the biggest financial impact for Group A companies, as it directly addresses one of the most significant and inflexible expenses in the regulated model.
Prerequisites: required documents and data
The process starts with organizing basic consumption and contract information. This preparation speeds up analyses and reduces rework.
Before starting any step, gather the following inputs:
-
Energy bills from the last 12 months
-
Monthly consumption profile in kWh and contracted demand in kW
-
Current contracts of all recurring telecom, insurance, logistics, and bank suppliers
-
Contacts and validity periods with the local distributor
-
Company CNPJ and technical and legal documentation for possible registration with CCEE (Electric Energy Commercialization Chamber)
Step 1 – Audit of existing contracts
Contract auditing creates a clear map of fixed expenses and future adjustments. This diagnosis guides all subsequent renegotiations.
Objective: map all recurring contracts, identify automatic adjustment clauses, and detect paid services that do not generate operational value.
Actions: list all suppliers with active contracts, record expiration dates and adjustment indices, compare the current value with the originally contracted value, and verify if the delivered scope matches the contracted one.
Responsible: Controller or financial manager.
Risks: contracts with high termination penalties may make early exit more costly than staying until natural expiration.
Checklist:
-
All contracts cataloged with monthly value, adjustment index, and expiration date
-
Unused services identified for cancellation
-
Contracts with adjustments above the IPCA flagged for renegotiation
Step 2 – Telecom renegotiation
Telecom renegotiation often yields quick savings, as it involves high-value contracts and strong competition among suppliers.
Objective: reduce the cost of data links, fixed and corporate mobile telephony without degrading service quality.
Actions: request a renewal proposal with discount from the current supplier, obtain quotes from at least two other providers, assess consolidation of links into a single contract, and review the mobile data plan per employee.
Responsible: IT manager or operations manager, with controller approval.
Risks: provider migration may require a contract coexistence period and generate temporary double costs.
Checklist:
-
Market quotes obtained and compared
-
Discounted renewal proposal formalized by the current supplier
-
Mobile data plans reviewed by usage profile
Step 3 – Review of insurance and recurring service contracts
The review of insurance and recurring services adjusts the protection and support level to the current operation size, avoiding excessive coverage and scopes.
Objective: align insurance coverage and recurring service contracts with the company's current risk profile, eliminating overlaps and unnecessary coverage.
Actions: review property, civil liability, and fleet insurance policies with an independent broker, map software, maintenance
https://cdn.aigrowthmarketer.co/1773100565842-b9b8a2b63c45.jpg" alt="Landscape of a renewable energy park at sunset, featuring large wind turbines and vast rows of solar panels over hills." style="max-height: 500px;" loading="lazy" decoding="async">
Responsible: chief financial officer or controller.
Checklist: broker’s history and references verified and management model and additional costs clarified.
6.4 – Register the company with CCEE (Electric Energy Commercialization Chamber)
Objective: enable the company as an agent of the free energy market.
Actions: submit technical, legal and financial documentation to CCEE (Electric Energy Commercialization Chamber). Serena Energia handles the entire process at no additional cost to the client.
Responsible: Serena Energia, with documentary support from the client company.
Checklist: technical, legal and financial documentation gathered and registration process initiated by Serena Energia.
6.5 – Negotiate the energy contract
Objective: close a contract with a pre‑agreed price, eliminating exposure to the tariff flags of the regulated market.
Actions: define term, typically five years, volume and price with Serena Energia. Serena Energia structures contracts that deliver the savings mentioned at the beginning of this guide, with a pre‑agreed price.
Responsible: chief financial officer, with support from Serena Energia.
Checklist: term, volume and price defined and contract reviewed by internal legal.
6.6 – Implement the measurement system
Objective: install hourly measurement equipment compatible with the free energy market.
Actions: Serena Energia is responsible for installing the measurement equipment at no additional cost to the client.
Responsible: Serena Energia, with access to the facilities provided by the facilities manager.
Checklist: equipment installed and certified and hourly measurement operational.
6.7 – Monitor and adjust consumption
Objective: track results monthly and identify efficiency opportunities.
Actions: use the Serena Energia dashboard to monitor monthly savings, consolidated savings, comparison between captive and free energy markets, consumption forecast and actual consumption. A dedicated Serena Energia consultant is available for questions and performance monitoring.
Responsible: controller, with support from the Serena Energia consultant.
Checklist: dashboard access configured and monthly follow‑up meeting scheduled with the consultant.
Common mistakes when cutting fixed expenses
Avoiding recurring errors increases the impact of expense‑reduction initiatives and reduces rework.
Ignoring automatic adjustment clauses. Contracts with annual adjustments based on sector indices can double the cost in a few years without the company noticing. The audit in Step 1 is the direct antidote to this problem.
Even with audited contracts, another frequent mistake jeopardizes the migration to the free energy market. Disregarding seasonality in energy planning. Companies that do not map consumption peaks before migrating to the free market may contract inadequate volumes, creating short‑term market exposure. The analysis in Step 6.2 prevents this error.
After correctly sizing consumption, the migration timeline must enter the financial plan. Underestimating the migration timeline to the free energy market. The process takes six months, due to the period the distributor requires to terminate the current contract. Companies that postpone the decision lose months of savings. The sooner the process starts, the sooner results appear.
Finally, the choice of energy partner influences contract stability over the years. Choosing a broker without its own generation. Companies without own generation depend on buying energy from third parties, which can represent a higher supply risk. Serena Energia is both generator and broker, giving the contract more solidity.
How to measure the results?
Monitoring by indicators shows whether the expense‑reduction program is delivering savings, predictability and lower dependence on tariff flags.
Three KPIs structure the monitoring of a fixed‑expense reduction program for Group A companies. The first measures the realized savings, the second evaluates the achieved predictability and the third shows the impact of tariff flags on the business.
-
Monthly variation of the energy bill: comparison between the amount paid in the regulated market and the amount paid in the free market, month by month. The Serena Energia dashboard provides this data automatically.
-
Budget predictability: deviation between budgeted energy cost and actual cost. In the free market, with a pre‑agreed price, this deviation tends to zero, regardless of tariff flags.
-
Reduction of tariff‑flag impact: in the regulated market, red flag 1 and 2 raise energy costs during water‑scarcity periods. In the free market, the contracted price is not affected by this.
Advanced options for multiple units
Companies with more than one consuming unit in Group A can consolidate energy management into a single contract with Serena Energia, simplifying monitoring and amplifying savings. Each unit goes through the same seven‑step process, but centralized management reduces administrative burden.
For companies with public sustainability targets, Serena Energia issues I‑RECs (International Renewable Energy Certificates) for each MWh consumed. These certificates prove, in an auditable and globally recognized way, that the consumed energy is renewable, which is essential for ESG reporting and for meeting Scope 2 emission‑reduction goals. Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂.

Frequently asked questions
Can my Group A company migrate to the free energy market even without a minimum consumption?
Yes. There is no minimum consumption to migrate. The only requirement is that the company be connected at medium or high voltage, i.e., belong to Group A. Serena Energia performs the eligibility analysis for free.
How long does the migration process to the free energy market take?
The regulatory process takes six months. This timeframe is due to the legal requirement of prior notification to the distributor to terminate the current contract. Serena Energia handles all bureaucratic steps at no additional cost to the client. Therefore, the sooner the company starts the process, the sooner it begins to save.
Does the local distributor stop being responsible for energy supply after migration?
No. The local distributor remains responsible for the physical delivery of electricity, the wires and the network quality. Migration to the free market is a commercial and contractual change. The company starts buying energy from a generator such as Serena Energia, but physical delivery stays under the distributor’s responsibility.
What happens if my company consumes more or less energy than contracted?
Free‑market contracts include a consumption‑flexibility band. If consumption falls outside this band, the difference is settled in the short‑term market. Serena Energia offers active management to minimize this exposure, monitoring consumption monthly and advising adjustments when needed.
What is an I‑REC and why is it relevant for companies with ESG goals?
The I‑REC (International Renewable Energy Certificate) is a global certificate that audibly proves that 1 MWh of energy was generated from a renewable source and injected into the grid. By acquiring I‑RECs together with the contracted energy, a company can declare its electricity consumption as 100 % renewable in sustainability reports, meeting the demands of investors, regulators and other stakeholders.
Conclusion: turn fixed expenses into a competitive advantage
Reducing fixed expenses in 2026 requires method and long‑term vision. For Group A companies, with medium or high‑voltage supply, the path goes through contract audits, renegotiation of recurring suppliers and, above all, migration to the free energy market. This final step combines cost reduction, budget predictability and sustainability in a single move.
Serena Energia, a renewable energy generator with a portfolio that includes Heineken, Cargill and Bayer, offers end‑to‑end managed migration at no additional cost, delivering the promised savings with a dedicated consultant to accompany each step.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *
