Key takeaways from this article

  • Group A companies can migrate to the free energy market and achieve cost predictability without initial investment.

  • Auditing and renegotiating contracts with strategic suppliers allow identifying outdated expenses and reducing OPEX.

  • Granular consumption monitoring by cost center reveals waste and supports monthly efficiency targets.

  • Adjusting contracted energy demand to the actual consumption profile eliminates payments for idle capacity.

  • To implement these strategies with specialized support and results in up to six months, contact Serena Energia.

Prerequisites

Planning starts with organizing the information that guides all decisions throughout the process:

  • Energy bills from the last 12 months

  • Monthly consumption profile in kWh and contracted demand

  • CNPJ and address of all consumer units

  • Current contracts with strategic suppliers

  • Operational expense reports by cost center

The process involves the Finance, Operations, and Facilities areas. There is no minimum consumption required to participate in the free energy market, as long as the company is part of Group A, with medium or high voltage supply.

Process overview

Step 1: migrate to the free energy market with Serena Energia

Goal: replace regulated market energy supply with the free energy market and achieve cost predictability.

Actions: request a feasibility study from Serena Energia, which analyzes the company's bills and consumption profile to project the expected savings. After approval, Serena Energia conducts the entire migration process, from registration with CCEE (Electric Energy Commercialization Chamber) to measurement system adjustment, at no additional cost to the client. The contract is typically signed for five years, with a pre‑agreed price, which eliminates the uncertainty of tariff flags.

Internal owners: financial director or controller, for contract approval, and Facilities manager, for technical monitoring of measurement adjustment.

Note: the regulatory process takes six months, during which Serena Energia manages all stages. During this period, nothing changes in the operation; the physical delivery of energy remains the responsibility of the local distributor, with the same reliability as always. After migration, the client receives two invoices, one for energy and another for distribution, and has support from a dedicated Serena Energia consultant to clarify doubts.

Aerial view of a vast solar plant with long rows of photovoltaic panels capturing the light of the sunset.
The use of large‑scale solar plants allows capturing energy with maximum efficiency, optimizing credits that drastically reduce the fixed costs of partner companies.

Checklist:

  • Bills from the last 12 months sent for analysis

  • Feasibility study received and approved

  • Contract signed with Serena Energia

  • Migration process started by the Serena Energia team

Step 2: audit contracts with strategic suppliers

Goal: identify contracts with outdated terms or underutilized services that can be renegotiated or cancelled.

Actions: map all active supply contracts and classify them by annual value. Verify if the negotiated terms still reflect the actual volume consumed. Prioritize suppliers with the greatest OPEX representation and schedule renegotiation rounds based on updated market data.

Internal owners: controller, for financial analysis, and Purchasing or Procurement manager, for conducting negotiations.

Checklist:

  • List of active contracts with mapped annual value

  • Contracts expiring in the next 12 months identified

  • Renegotiation meetings scheduled with the top three suppliers

Step 3: implement granular consumption monitoring by cost center

Goal: create visibility on where resources are being consumed to identify waste and reduction opportunities.

Actions: install or activate consumption monitoring tools by unit, production line, or department. Define efficiency indicators, such as consumption per produced unit, per square meter, or per employee, and set monthly reduction targets. In the case of energy, Serena Energia provides a dashboard with monthly savings tracking, actual consumption, consumption forecast, and comparison between captive market and free energy market.

Internal owners: Operations manager and Facilities manager.

Checklist:

  • Monitoring tool active by cost center

  • Efficiency indicators defined and communicated to teams

  • Serena Energia dashboard configured and accessible

Talk to one of our consultants to understand how migrating to the free energy market fits into your budgeting plan.

Step 4: review contracted energy demand

Goal: eliminate payment for contracted demand above actual consumption and adjust the contract to the operation's effective profile.

With granular monitoring active, the company now has concrete data to review contracted demand more accurately.

Actions: compare contracted demand with measured demand over the last 12 months. Identify months with recorded demand significantly below contracted. Use this data as a basis for contract adjustments in the next review window.

Internal owners: Facilities manager and controller.

Step 5: automate high operational cost manual processes

Goal: reduce man‑hours allocated to repetitive and error‑prone tasks, freeing the team for higher‑value activities.

Actions: start by mapping administrative and operational processes with the highest volume of manual work. Use this mapping to prioritize automations with lower implementation cost and higher productivity impact. For financial routines identified as priorities, such as invoice reconciliation and expense reporting, evaluate RPA tools, robotic process automation.

Internal owners: IT manager, controller and Operations manager.

Step 6: consolidate suppliers and eliminate redundancies

Goal: reduce the number of active suppliers to gain negotiating power and simplify administrative management.

Actions: identify purchasing categories with multiple suppliers for the same type of product or service. Assess the feasibility of consolidating into a single supplier per category, negotiating volume in exchange for better commercial terms. Eliminate duplicate contracts or overlapping services.

Internal owners: Purchasing manager and controller.

Step 7: establish operational energy efficiency policy

Goal: complement the savings obtained from migrating to the free energy market with actions to reduce physical electricity consumption.

Actions: conduct an energy efficiency diagnosis in the facilities, including lighting, HVAC, and industrial equipment. Implement scheduled shutdown routines for equipment outside operating hours. Train teams to adopt conscious energy use practices.

Internal owners: Facilities manager and Operations manager.

Step 8: incorporate ESG goals into cost planning

Goal: turn the savings obtained in previous steps into a strategic sustainability asset and strengthen the company's reputation with investors, customers, and partners.

Migrating to the free energy market allows proving the use of renewable energy and linking cost reduction to ESG goals.

Landscape of a renewable energy park at sunset, featuring large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the Free Market supply.

Actions: request from Serena Energia the issuance of Renewable Energy Certificates, I‑RECs, corresponding to the company's consumption. These certificates auditable prove that the consumed energy is 100% renewable and are the main tool to zero Scope 2 emissions. For companies with broader goals, Serena Energia also offers carbon credits to offset other emission sources.

A single white wind turbine stands out amid a dense layer of fog or clouds, illuminated by the soft light of the sunset.
Advanced wind technology allows Serena Energia to capture constant winds at high altitudes, ensuring a clean, stable, and efficient energy source for your business.

Internal owners: ESG manager and financial director.

Common mistakes and how to avoid

Not analyzing consumption profile before migrating. Starting the process without understanding seasonality and demand peaks can result in a poorly sized contract. The solution is to send the last 12 months of bills to Serena Energia before any contractual decision.

Underestimating the six‑month timeline for migration. Companies that postpone the decision lose months of savings. Since the regulatory timeline mentioned in Step 1 is fixed, starting the process as soon as possible increases the savings period in the first year.

Not monitoring consumption monthly after migration. Lack of monitoring prevents identifying deviations between contracted and actual consumption. The Serena Energia dashboard enables continuous monitoring, with comparisons between captive market and free energy market.

Treating cost reduction as a one‑off project. Expense cuts require periodic review. Establish a

Quarterly routine of contract and consumption analysis sustains the results over time.

Results Verification

The comparison between invoices before and after migration is the most direct method to measure the financial impact. The Serena Energia dashboard shows the monthly savings, the total consolidated savings, the invoice breakdown with a comparison between the regulated market and the free energy market, as well as the forecast and the actual consumption for the month.

The annual contract review with Serena Energia’s dedicated consultant allows adjusting the contracted volume to the real consumption profile and evaluating additional optimization opportunities.

Request a personalized analysis of your energy invoices with our consultants.

Advanced Options

After implementing the eight steps described, companies with multiple consumer units can amplify results by migrating all of them to the free energy market under Serena Energia’s management. This consolidation increases the volume of savings and centralizes energy management. Serena Energia serves the entire national territory.

For companies with public sustainability targets, the I-RECs issued by Serena Energia have global recognition and are used in sustainability reports aligned with international standards, including the UN Sustainable Development Goals. Since 2017, Serena Energia has prevented the emission of more than 2.14 million tonnes of CO₂.

Silhouette of several wind turbines aligned along the coast during a colorful sunset, with reflections on the water.
Exploiting natural resources, such as coastal winds, is essential to maintain the scale and sustainability required in the Free Energy Market.

The integration of the Serena Energia dashboard with enterprise resource planning (ERP) systems allows energy consumption and billing data to be incorporated directly into the company’s financial planning and ESG reporting.

Frequently Asked Questions

Can my Group A company migrate to the free energy market?

Yes. Any company supplied at medium or high voltage, i.e., belonging to Group A, can migrate to the free energy market. No minimum consumption is required. Serena Energia conducts the eligibility analysis at no cost.

How long does the migration process take?

The regulatory process takes six months. Throughout this period, Serena Energia carries out each step described in Step 1, maintaining the same model with no additional cost to the client. The sooner the process starts, the sooner the company begins to save.

Does migration pose any risk to my operation’s energy supply?

No. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity and grid quality. The only change is who the company purchases the energy from. Serena Energia, among the largest wind and solar generators created in the Americas, has robust backing to cover 100 % of the contracted consumption.

What happens if my company consumes more or less energy than contracted?

Contracts provide a flexibility band for consumption variations. Outside this band, the difference is settled in the short‑term market. In Serena Energia’s retail model, the client does not purchase a fixed volume of energy; billing is calculated based on the contracted price multiplied by the actual consumption for the month, simplifying management.

What is an I‑REC and how does it benefit my company?

The I‑REC, International Renewable Energy Certificate, is a global certificate that auditable proves a certain volume of energy was generated from a renewable source. By acquiring I‑RECs together with Serena Energia’s electricity, a company can declare its electricity consumption as 100 % renewable and meet sustainability reporting and ESG target requirements for investors, customers, and regulators.

Conclusion

Reducing costs and operational expenses in Group A companies, supplied at medium or high voltage, requires a structured plan with clear prioritization of high‑impact actions. Migration to the free energy market with Serena Energia is the highest‑return step, delivering budget predictability, lower electricity bills, and renewable energy certification, with no additional migration cost and full management by Serena Energia.

With more than 17 years of history, presence across Brazil, and clients such as Heineken, Cargill, and Bayer, Serena Energia is among the largest wind and solar generators created in the Americas and is a solid partner for companies seeking to cut costs and strengthen their sustainability agenda.

Take the first step, talk to our consultants and place your energy in the right spot for your business growth.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *