SERENA
Back to Blog
All articles • 09/06/2026

How to reduce the company's fixed costs with electricity?

How to reduce the company's fixed costs with electricity?

Written by: André Lima, Growth, Serena Energia

Key takeaways from this article

  • Group A companies can migrate to the free energy market with no minimum consumption, reduce exposure to tariff flags, and have cost predictability for up to five years.

  • Signing bilateral contracts with fixed price and 100% certified renewable energy by I-REC reduces operating expenses and contributes to sustainability goals without upfront investment.

  • Having a manager partner like Serena Energia transfers the bureaucracy with CCEE (Electric Energy Commercialization Chamber), meter adaptation and consumption monitoring, without a specific additional charge for these services.

  • Conducting a free invoice and consumption‑profile analysis allows you to project real savings and identify billing errors before migration.

  • To start the migration and turn energy cost into a competitive advantage, talk to a Serena Energia consultant.

Essential concepts: free energy market, captive market, distributor and CCEE

Captive market is the traditional model where the company purchases energy from the local distributor at regulated tariffs, without being able to negotiate price, term, or source.

Free energy market is the environment where eligible consumers choose the supplier and negotiate contractual conditions, such as price, volume, term and energy source. The distributor remains present, but only as responsible for the delivery infrastructure and the wires and poles.

Distributor is the local concessionaire that operates the distribution network. In any purchase model, this company is responsible for the physical delivery of electricity to the meter.

CCEE (Electric Energy Commercialization Chamber) is the body that registers and settles energy transactions in Brazil. Companies that migrate to the free energy market need to register with CCEE or be represented by an authorized agent, such as Serena Energia.

Understanding these concepts helps connect the migration decision to financial and sustainability benefits. Contracts in the free energy market allow fixed price and choosing the supplier enables access to 100% renewable energy with traceable certification.

Landscape of a renewable energy park at sunset, featuring large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the supply of the Free Market.

Talk to a Serena Energia consultant and assess how to apply these concepts to your company's reality.

Who can migrate? Eligibility for Group A companies

Group A gathers all consumers served at medium or high voltage. Since January 2024, any company in this category can migrate to the free energy market, regardless of monthly consumption volume. No minimum consumption is required.

This rule covers industries, retail chains, hospitals, malls, hotels and corporate offices, as long as they are connected at medium or high voltage. These companies already have the right to choose the energy supplier and negotiate more favorable conditions.

Serena Energia performs the eligibility analysis for free, evaluating the company's invoices and consumption profile to confirm eligibility and project potential savings.

Request a free eligibility analysis and discover how much your company can save by migrating.

Comparison of alternatives: regulated market, free energy market and self‑generation

Criterion

Regulated market (captive)

Free energy market (with manager partner)

Self‑generation

Cost predictability

Low, tariffs and flags vary throughout the year

High, price fixed in contract for up to 5 years

Medium, depends on own generation and O&M costs

Management complexity

Low, a single distributor invoice

Low, manager partner assumes bureaucracy with CCEE

High, requires dedicated technical team and asset management

Initial investment

None

Meter adaptation costs absorbed by the manager partner

High, infrastructure, installation and maintenance

Access to certified renewable energy

Not guaranteed

Yes, wind energy with I‑REC issuance

Dependent on the chosen source

Self‑generation requires high investment in infrastructure, long implementation timelines, and management of an asset that is not part of most companies' core business.

The free energy market with a manager partner combines cost savings, predictability and sustainability without requiring own capital or dedicated internal technical team.

Request a personalized comparative study and evaluate these alternatives based on the real data of your operation.

Factors to assess before migration

Invoice analysis: the consumption history in kWh and contracted demand in kW form the basis to size the contract in the free energy market. Invoice audits identify billing errors, tax exemptions and incorrect tariff classifications that can distort the baseline of the analysis.

Consumption profile: seasonality and demand peaks influence the most suitable contract type. Contracts that combine fixed price for the expected volume with settlement of excess in the short‑term market offer predictability and maintain flexibility.

Contractual flexibility: contracts in the free energy market generally provide a consumption tolerance range, typically between 5% and 10% of the contracted volume. Volumes outside this range are settled in the short‑term market.

An experienced manager partner monitors consumption and advises adjustments to reduce this exposure.

Technical support: the adaptation of the measurement system, the SMF, is mandatory to operate in the free energy market. This requirement can represent a relevant cost, but Serena Energia takes responsibility for installing the measurement equipment, which eliminates this financial and operational barrier for the client.

Request a detailed analysis of invoices and consumption profile to assess the feasibility of migration.

Steps of migration to the free energy market (step by step)

  1. Feasibility analysis: Serena Energia analyzes the company's invoices and consumption profile, projects savings and presents a detailed study, free of charge.

  2. Contract closing: after defining price, term, usually 5 years, and conditions, the parties sign the bilateral contract.

  3. Migration process: Serena Energia conducts the bureaucratic steps, including registration with CCEE, notification to the distributor and adaptation of the measurement system. All these costs are absorbed by Serena Energia.

  4. Meter adaptation: the company receives installation of measurement equipment compatible with the free energy market, with mandatory hourly measurement. Serena Energia assumes this responsibility without separate charge.

  5. Supply start: after the 6‑month period required to terminate the contract with the distributor, the company begins operating in the free energy market and starts reducing the electricity bill.

During the whole process, a Serena Energia consultant follows each step and coordinates timelines with the distributor and CCEE, avoiding impacts to the company's operation.

Start your migration now and put this 6‑month schedule to work in favor of cost reduction.

How does the operation work after migration?

After migration, the company receives two invoices. One invoice comes from Serena Energia, referring to the contracted energy. The other invoice comes from the local distributor, referring to the use of the distribution network, the wires.

Serena Energia centralizes operational complexity, handles payment to the distributor and represents the company before CCEE in the retail model.

The client accesses a digital dashboard with monitoring of monthly savings on the invoice, total consolidated savings, comparison between cost in the captive market and in the free energy market with Serena Energia, monthly consumption forecast and consumption realized to date.

Companies with sustainability goals can receive I‑RECs (International Renewable Energy Certificates) issued by Serena Energia in volume corresponding to consumption.

Each I‑REC certifies that 1 MWh was generated by a renewable source and injected into the grid. It is a globally recognized instrument to zero Scope 2 emissions in sustainability reports.

A single white wind turbine stands out amid a dense layer of fog or clouds, illuminated by the soft light of the sunset.
Advanced wind technology allows Serena Energia to capture constant winds at high altitudes, ensuring a clean, stable and efficient energy source for your business.

Understand in detail the energy management after migration and see how to monitor results in real time.

Common Risks and Best Mitigation Practices

Consumption deviations: consuming significantly above or below the contracted volume exposes the company to short‑term market prices. Active consumption monitoring and incremental contract adjustments reduce this risk without requiring an internal trading team.

Serena Energia provides this monitoring as part of energy management.

Bureaucracy and compliance: the Brazilian electricity sector involves obligations with CCEE, financial settlements, and periodic data submissions. Companies that try to manage this process without specific expertise are exposed to fines and non‑compliance risks.

A management partner with a solid track record reduces this exposure and organizes compliance with the obligations.

Supplier choice: suppliers without their own generation depend on purchasing energy from third parties, which can represent a higher supply risk. Serena Energia is among the largest wind and solar generators in the Americas, with more than 17 years of history and 17 operational plants.

This integration of generation and commercialization brings solidity and competitiveness that partners without own assets cannot replicate.

Assess how to mitigate migration risks with the support of a team with over 17 years of experience in the sector.

Frequently Asked Questions about Migration to the Free Energy Market

What is, in practice, the free energy market?

The free energy market allows a company to stop buying electricity exclusively from the local regulated‑tariff distributor and to choose among different suppliers.

In this environment, the company negotiates price, term, volume and energy source. The physical quality of delivery does not change, because the distributor remains responsible for the wires and grid stability.

What changes is the commercial contract and, with it, the price paid for electricity.

Can my company migrate? What are the requirements?

Any company connected at medium or high voltage, the so‑called Group A, can migrate to the free energy market. As mentioned earlier, there is no volume barrier; companies of any size in Group A are eligible.

Serena Energia conducts the eligibility analysis for free, evaluating your invoices and consumption profile.

Can migration cause an interruption in electricity supply?

No. Migration is a commercial and contractual process. The local distributor is obliged to continue delivering electricity and to maintain grid quality and stability, regardless of who supplies the energy.

There is no risk of operational interruption during or after the migration because of the change in contracting environment.

How long does the migration process take?

The process takes 6 months, the time needed to terminate the contract with the distributor. Serena Energia handles steps such as registration with CCEE, meter adjustment and notification to the distributor.

Serena Energia performs these activities as part of the energy management included in the contract. The sooner the company starts, the sooner it begins to save.

What happens if my company consumes more or less energy than contracted?

Free‑market contracts provide a tolerance band, usually between 5 % and 10 % of the contracted volume. Volumes outside this band are settled in the short‑term market.

Serena Energia offers active consumption monitoring to reduce this exposure, helps the company forecast consumption and adjust the contract when needed.

What is the I‑REC and why is it important?

The I‑REC (International Renewable Energy Certificate) is a global certificate that auditable proves that 1 MWh of electricity was generated from a renewable source and injected into the grid.

By acquiring I‑RECs together with the contracted energy, a company can declare that its electricity consumption is 100 % renewable. This information is essential for sustainability reporting, ESG targets and investor or commercial partner requirements.

Silhouette of several wind turbines aligned along the coast during a colorful sunset, with reflections on the water.
Exploiting natural resources, such as coastal winds, is essential to maintain the scale and sustainability required in the Free Energy Market.

Next Steps to Reduce Your Fixed Energy Costs

Migrating to the free energy market with an experienced management partner generates three simultaneous benefits. The company gains a fixed price, reducing exposure to tariff flags. The complete handling of the bureaucratic process occurs with no specific additional charge. The contracted energy can be 100 % renewable, with traceable certification via I‑REC.

Serena Energia brings more than 17 years of history as a pioneer in renewable energy, a self‑generation scale that places it among the largest on the continent, and a portfolio that includes companies such as Heineken, Cargill and Bayer.

Managed migration, energy consulting and CCEE management are offered as part of the service for clients under Serena Energia’s management.

The first step is to analyze the company’s invoices. Based on this analysis, Serena Energia projects the potential savings and presents a detailed, no‑obligation study.

Talk to one of our consultants and take the first step to turn energy cost into a competitive advantage.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *