SERENA
Back to Blog
All articles • 29/07/2026

Practical guide: how to reduce your SME's electricity bill?

Practical guide: how to reduce your SME's electricity bill?

Written by: André Lima, Growth, Serena Energia

Key takeaways from this article

  • Companies in Group A can migrate to the free energy market with no minimum consumption and without altering the physical delivery infrastructure.
  • Migration can generate up to 20% savings on the electricity bill, with fixed pricing in long‑term contracts and elimination of tariff flags.
  • A specialized supplier manages the entire process, with no upfront investment and a regulatory timeline of up to six months.
  • In addition to cost reduction, migration allows issuing I‑REC certificates that prove 100% renewable consumption for ESG reporting.
  • To start a free feasibility analysis, contact Serena Energia.

Main alternatives to reduce energy costs

Managers of Group A SMEs usually evaluate three main paths to reduce energy costs: migrating to the free energy market, contracting renewable energy credit models, and implementing operational energy efficiency measures. Each alternative presents different levels of upfront investment, complexity, cost predictability, and sustainability impact.

Renewable energy credit models, where the company receives discounts on the distributor’s invoice through quotas in remote plants, require zero upfront investment and have low contracting complexity. This is an affordable option, but with a limited savings ceiling and no long‑term price predictability.

Operational energy efficiency measures, such as lighting replacement, HVAC system modernization, and real‑time consumption monitoring, present low risk and can be implemented incrementally. IoT‑based management systems can reduce energy waste by 30% to 50%, according to industry data. However, results depend on each company’s operational profile and usually require a prior technical diagnosis.

Migrating to the free energy market combines greater savings potential with cost predictability and sustainability attributes. For Group A companies, the process does not require investment in own generation infrastructure and can be fully managed by a specialized partner. Serena Energia offers up to 20% savings on the electricity bill, with long‑term contracts and pre‑agreed pricing.

Silhouette of several wind turbines aligned along the coast during a colorful sunset, with reflections on the water.
Exploiting natural resources, such as coastal winds, is essential to maintain the scale and sustainability required in the Free Energy Market.

Find out which alternative makes the most sense for your company's consumption profile.

What the free energy market is and why it is accessible for Group A companies

The free energy market allows companies to choose from whom to buy electricity and to negotiate price, term, and volume directly with suppliers. Physical delivery of electricity remains the responsibility of the local distributor, and the wires, poles, and network quality stay the same. The difference lies in who supplies the energy and at what price.

Any Group A company, connected at medium or high voltage, can migrate to the free energy market. Since January 2024, there is no minimum consumption requirement for this migration, which expands access to retail networks, hospitals, supermarkets, medium‑size industries, and commercial buildings.

Even with this expanded access, migrations to the free energy market fell 19% in 2025 compared to 2024, totaling 21.7 thousand consumers. This scenario indicates room for more companies to evaluate the topic calmly and with structure.

Serena Energia operates in this market primarily with renewable energy and is among the largest wind and solar generators created in the Americas, with over 17 years of history. In the retail model of the free energy market, the company represents the client before the CCEE (Electric Energy Commercialization Chamber), handles regulatory and financial management, and issues Renewable Energy Certificates (I‑RECs) that verify the clean origin of the consumed energy. This is a valuable asset for sustainability reporting and ESG goals.

Landscape of a renewable energy park at sunset, showing large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the Free Market supply.

Steps to assess and implement the migration

1. Verify eligibility

The first step is to confirm whether the company is in Group A, with medium or high voltage supply. No minimum consumption is required to migrate. Serena Energia conducts this eligibility analysis at no cost.

2. Analyze consumption profile

Mapping monthly consumption in kWh and contracted demand guides the choice of contract type and projects the savings potential. Serena Energia performs this analysis based on the company's previous bills and presents contracting scenarios.

3. Choose the supplier and close the contract

The feasibility study guides the proposal evaluation and contract signing, which typically has a term of about five years. The price is agreed upon in advance, eliminating tariff‑flag uncertainty and facilitating budget planning.

4. Conduct the migration process

Serena Energia handles the entire bureaucratic process, including registration with the CCEE and installation of the necessary metering equipment, at no additional cost to the client. This complete process takes up to six months, according to the established regulatory timeline.

A single white wind turbine stands out amid a dense layer of fog or clouds, illuminated by the soft light of the sunset.
Advanced wind technology allows Serena Energia to capture steady winds at high altitudes, ensuring a clean, stable, and efficient energy source for your business.

5. Start saving and monitor results

After migration, the client receives two invoices, one for energy and another for distribution. A dedicated Serena Energia consultant monitors performance, assists with questions, and suggests adjustments when needed.

Start the feasibility analysis for your company now.

Post‑contract monitoring

After migration, Serena Energia represents the company before the CCEE in the retail model and handles sector obligations such as guarantee deposits, financial settlements, and data submission. As part of this centralized management, the company also consolidates payment to the distributor, reducing the risk of service interruption due to administrative issues.

Beyond behind‑the‑scenes regulatory management, the client has access to a digital dashboard tracking monthly bill savings, accumulated consolidated savings, comparison between captive and free energy markets, consumption forecast, and actual consumption. A dedicated consultant remains available to answer questions and monitor cost‑reduction performance throughout the contract.

Common risks and best mitigation practices

The main operational risk in migrating to the free energy market is consumption variation relative to the contracted volume. Retail‑model contracts provide a flexibility band, and differences outside this band are settled in the short‑term market. Active consumption management, with monthly monitoring and preventive adjustments, reduces this exposure and keeps the contract aligned with actual use.

Another point of attention is supplier selection. Many companies operating in the free energy market do not have their own generation and rely on third parties to fulfill contracts. Serena Energia has its own renewable energy generation, providing greater supply solidity.

Advance planning also reduces risks. Since the migration process takes up to six months, starting the assessment early allows the company to begin saving at the appropriate point in the budgeting cycle, without surprises.

Frequently asked questions

Does my company need a minimum consumption to migrate to the free energy market?

No. Any Group A company, connected at medium or high voltage, can migrate to the free energy market, regardless of its monthly consumption level. Serena Energia conducts the eligibility analysis at no cost to confirm whether your unit fits this profile.

Can the migration cause an interruption in energy supply?

No. Migration to the free energy market is an exclusively commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity, and the wires, poles, and network stability remain unchanged. The only change is who the company buys the energy from and at what price.

How long does the migration process take?

The regulatory process takes up to six months, counted from the notification to the distributor. As mentioned earlier, this is the timeframe to complete steps such as documentation, registration with the CCEE, installation of metering equipment, and start of supply in the free energy market.

What is the I‑REC and why is it relevant for my company?

The I‑REC (International Renewable Energy Certificate) is an international certificate that verifies that 1 MWh of energy was generated by a renewable source and injected into the electric grid. This certificate is the official instrument for companies to declare 100% clean energy consumption in sustainability reports, Scope 2 emission inventories, and ESG audits. Serena Energia issues I‑RECs corresponding to each client’s consumption, allowing the renewable origin to be auditable to investors, customers, and global partners.

What happens if my company consumes more or less energy than contracted?

Retail‑model contracts in the free energy market provide a consumption flexibility band. Differences outside this band are settled in the short‑term market. Serena Energia offers active consumption monitoring to help the company stay within the contracted range and reduce potential financial adjustments over the contract term.

Conclusion and next steps

For Group A SMEs, co

connected at medium or high voltage, the free energy market is a direct path to reduce the electricity bill, stabilize operational costs, and advance sustainability goals without investing in own generation infrastructure. The migration does not require a minimum consumption, does not change the physical delivery of energy, and can be conducted in a fully managed way.

Serena Energia conducts this end‑to‑end process: eligibility analysis, managed migration, regulatory management before the CCEE, continuous monitoring, and issuance of I‑REC certificates. With over 17 years of operation and clients such as Heineken, Cargill, and Bayer, the company offers the experience that a financial manager seeks before making a decision of this magnitude.

The next step is to share the energy invoices with a specialist and receive a feasibility study with the projected savings for your company.

Place your energy in the right place: in the growth of your business.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *