How to save on your electricity bill with the free electricity market

Written by: André Lima, Growth, Serena Energia
Key takeaways from this article
-
Group A companies can migrate to the free energy market and replace tariff flags with fixed-price contracts for up to five years.
-
A feasibility study based on 12 months of invoices is the first step to size the contract and reduce the risk of unexpected costs.
-
Choosing a supplier with its own generation and financial soundness helps maintain supply continuity in 2026.
-
Migration requires registration with CCEE (Electric Energy Commercialization Chamber), adaptation of the metering system, and a six-month transition. Serena Energia handles the entire process at no additional cost to clients under its management.
-
In addition to savings of up to 20% on the electricity bill, contracting 100% renewable energy with the issuance of I-RECs strengthens ESG goals. To find out if your company is eligible, visit Serena Energia.
Prerequisites to get started
Gathering data and aligning internal decisions speeds up the migration to the free energy market and makes the feasibility study more accurate.
-
Recent invoices: gather at least 12 months of energy bills, including kWh consumption, contracted demand, and tariff components.
-
Consumption profile: map out seasonalities, demand peaks, and peak usage hours to guide the contract type.
-
Group A confirmation: check the invoice to see if the supply is at medium or high voltage. There is no minimum consumption required to migrate; belonging to Group A is sufficient.
-
Internal alignment: involve finance, operations, and, when applicable, ESG, since the contract typically lasts for five years.
-
Definition of objectives: prioritize cost reduction, budget predictability, renewable energy certification, or a combination of these outcomes.
Overview of the 7-step process
Migrating to the free energy market follows a defined regulatory and commercial sequence. The timeframe until the first savings appear on the bill is six months from contract formalization, a period necessary to terminate the relationship with the local distributor.
During this period, the distributor remains responsible for the physical delivery of energy and grid quality. The change occurs only in the origin of energy procurement.
The seven steps are: checking eligibility, analyzing the consumption profile, choosing a reliable supplier, registering the company with CCEE (Electric Energy Commercialization Chamber), negotiating the contract, implementing the metering system, and monitoring results.
Complete step-by-step guide to migrate
Step 1: check company eligibility
Objective: confirm whether the company can participate in the free energy market.
Actions: identify the tariff group and voltage subgroup on the invoice. Group A companies, connected at medium or high voltage, have been eligible to migrate since January 2024, regardless of their consumption level.
Responsible party: finance or facilities department, with support from the supplier.
Point of attention: companies with multiple units at different voltages need to analyze each unit separately. Units outside Group A can evaluate alternatives such as load pooling (comunhão de cargas).
Request a free eligibility analysis for your company and confirm whether your units can migrate.
Step 2: analyze the consumption profile
Objective: understand the energy usage pattern to structure a contract compatible with the company's reality.
Actions: map monthly consumption in kWh for the last 12 months, identify seasonalities and demand peaks, and compare contracted consumption with actual consumption.
Responsible party: operations or facilities department, with technical support from the supplier.
Point of attention: poorly sized contracts relative to the actual consumption profile are among the main causes of unexpected costs in the free energy market. The analysis of the consumption profile is the core input for the feasibility study and contract sizing.
Receive a personalized feasibility study based on your actual invoices and size your contract with greater confidence.
Step 3: choose a reliable supplier
rcializadora confiávelObjective: select a partner with financial strength, self-generation capacity, and full management of the process.
Actions: evaluate whether the company has its own generation or merely resells third-party energy, analyze its history, client portfolio, and the management model offered.
Responsible: finance and legal departments.
Point of attention: the liquidity crisis of 2025-2026 led several traders to seek judicial protection, exposing clients to replacement costs or a return to the regulated market. Companies without self-generation depend on buying energy from third parties, which increases supply risk during market stress scenarios. Serena is among the largest wind and solar energy generators created in the Americas, with over 17 years of history and clients such as Heineken, Cargill, and Bayer, reinforcing supply security.

Step 4: register the company with CCEE (Electric Energy Commercialization Chamber)
Objective: qualify the company as an agent in the free energy market.
Actions: submit technical, legal, and financial documentation to CCEE (Electric Energy Commercialization Chamber). In the retail model, the trader represents the company before CCEE (Electric Energy Commercialization Chamber) and leads the process.
Responsible: Serena fully assumes this process, at no additional cost for clients under its management.*
Point of attention: registration involves ongoing capital contributions and sectoral obligations. In Serena's retail model, these responsibilities are managed by the company itself.
Step 5: negotiate the energy contract
Objective: formalize supply conditions, such as price, term, volume, and source.
Actions: define the contract type, term, and energy source. The fixed-price contract is usually recommended for companies with low tolerance for cost fluctuations. The typical term is five years. Group A companies can obtain discounts on their energy tariff when migrating to the free energy market, varying according to consumption profile, local distributor, and market conditions at the time of negotiation. Serena offers savings of up to 20% compared to the regulated market.

Responsible: finance department, with support from the trader.
Point of attention: fixed-price contracts eliminate direct exposure to PLD (Difference Settlement Price), the market's short-term price. The average PLD went from R$ 129/MWh in 2024 to over R$ 300/MWh in 2026, an 84% increase, which impacted companies with spot-indexed contracts, while fixed-price contracts kept costs stable.
Step 6: implement the metering system
Objective: install the hourly metering equipment required to participate in the free energy market.
Actions: adapt the metering system (SMF) of the consumer unit to the free energy market standard, with hourly consumption registration.
Responsible: Serena is responsible for installing the metering equipment, at no additional cost to the client.*
Point of attention: adapting the metering system can represent a significant cost in other contracting models. At Serena, this cost is absorbed for clients under its management.
Step 7: monitor and adjust consumption
Objective: track results after migration and identify adjustment opportunities.
Actions: monthly compare costs with the captive market period, monitor actual consumption against the contracted amount
data and review demand projections.Responsible: dedicated consultant from Serena Energia, supported by the digital monitoring dashboard.
Point of attention: free energy market contracts provide for a flexibility range, usually between 5% and 10% of the contracted volume. Consumption outside this range is settled at the PLD. Active management by Serena Energia reduces this exposure through continuous monitoring.
Table: real disadvantages and how Serena Energia mitigates each one
|
Disadvantage |
Impact |
Mitigation by Serena Energia |
Result for your company |
|---|---|---|---|
|
Exposure to PLD in spot-indexed contracts |
The PLD can fluctuate significantly and increase costs during periods of water scarcity |
Fixed-price contracts for up to five years, eliminating direct spot exposure |
Budget predictability, regardless of hydrological conditions |
|
Regulatory complexity and red tape |
Registration with CCEE (Electric Energy Commercialization Chamber), SMF compliance, and management of settlements and ongoing sector obligations |
Serena Energia handles the entire process and represents the company before CCEE (Electric Energy Commercialization Chamber) in the retail model, at no additional cost for clients under its management* |
Reduction of administrative burden for the internal team |
|
Six-month timeframe until the first savings |
The company remains in the captive market during the regulatory transition period |
Early planning and execution of all stages within the deadline, with a dedicated consultant |
Migration in the shortest possible time, with savings starting on the first invoice after completion |
|
Risk of default or insolvency of the trader |
Clients may return to the regulated market or bear replacement costs |
Serena Energia with over 17 years of operation, its own generation, and a portfolio of large clients, which reduces the risk associated with supply |
Continuity of supply and long-term contractual security |
*Managed migration to the free energy market, energy consulting, and energy management are offered at no additional cost only for clients under Serena Energia's management. If the client has another manager, Serena Energia acts solely as an energy supplier.
How to check results after migration?
Result verification begins on the first invoice after migration is completed. Objective indicators allow you to track contract performance.
-
Monthly savings: comparison between energy costs in the current period and the equivalent cost in the captive market, available on the Serena Energia digital dashboard.
-
Consolidated savings: total accumulated since the start of the contract, showing the financial impact over time.
-
Budget predictability: absence of variations due to tariff flags on the contracted energy portion, facilitating long-term planning.
-
I-RECs issued: for each MWh consumed, Serena Energia can issue a Renewable Energy Certificate (I-REC), traceable from the wind source to the final consumer, a relevant feature for sustainability reports and Scope 2 targets.
-
Carbon credits: for companies with broader decarbonization targets, Serena Energia offers access to carbon credits from certified projects, complementing the ESG strategy.
Simulate these indicators for your company's consumption profile and view your savings potential.
The Serena Energia digital dashboard displays, in near real-time, monthly savings, consolidated savings a, the invoice breakdown with a comparison between the captive energy market and the free energy market, the monthly consumption forecast, and the consumption recorded so far. This level of transparency allows chief financial officers and controllers to monitor contract performance without relying on manual reports.
Advanced options for networks with multiple units and ESG goals
Companies with multiple consumer units can centralize energy management in a single contract or structure contracts per unit, according to each facility's profile. Serena operates throughout Brazil in the free energy market, which expands options for networks distributed across different states.
For ESG managers and sustainability directors, contracting 100% renewable energy with the issuance of I-RECs is a direct way to reduce Scope 2 emissions—associated with electrical energy consumption—to zero. Since 2017, Serena has avoided the emission of more than 2.14 million tons of CO₂. The statement by Rogério Andrade, Vice President of Product Supply at Bayer, illustrates this alignment: “The agreement with Serena is yet another important initiative we are implementing to achieve our sustainability goals, aligned with the UN Sustainable Development Goals.”

For companies seeking to advance beyond Scope 2, Serena offers access to carbon credits from certified projects, allowing them to neutralize other emission sources and strengthen annual sustainability reports before investors, clients, and regulators.
Frequently asked questions
Can any company migrate to the free energy market?
Group A companies, connected at medium or high voltage, can migrate to the free energy market, as described in the prerequisites. Since January 2024, any company in this group can participate, regardless of sector or location in Brazil. Serena performs eligibility analyses free of charge.
Does migration represent a risk of power supply interruption?
Migration to the free energy market is a commercial and contractual process. The local distributor remains responsible for the physical delivery of energy, grid quality, and restoring supply in case of failures. The company simply starts buying energy from another supplier, without altering the distribution infrastructure.
How long does the migration process take?
The regulatory deadline is six months from the formalization of the contract, a period necessary to terminate the bond with the distributor. Serena handles all steps of this process, such as registration with CCEE (Electric Energy Commercialization Chamber), adaptation of the metering system, and notification to the distributor, at no additional cost to clients under its management. Savings begin to appear on the first invoice after migration is complete.
What happens if actual consumption falls outside the contracted volume?
Contracts in the free energy market provide for a flexibility range, usually between 5% and 10% of the contracted volume. Consumption outside this range is settled at the PLD (Difference Settlement Price), the short-term price calculated by CCEE (Electric Energy Commercialization Chamber). Serena performs active management to reduce this exposure, monitoring consumption and supporting the company in demand projection.
What are I-RECs and why are they relevant for ESG reporting?
The I-REC (International Renewable Energy Certificate) is a global certificate that proves, in an auditable way, that 1 MWh of energy was generated from a renewable source and injected into the grid. By contracting wind energy with the issuance of I-RECs, the company can declare that its electricity consumption is 100% renewable—an internationally recognized resource for reducing Scope 2 emissions in sustainability reports and meeting the demands of investors and clients in the value chain.

É necessário instalar painéis ou qualquer equipamento especial na empresa?
Não é necessário instalar painéis ou infraestrutura de geração. A única adequação exigida é o sistema de medição horária (SMF), que registra o consumo com a precisão necessária para o mercado livre de energia. A Serena Energia se responsabiliza pela instalação desse equipamento, sem custo adicional para o cliente.
Conclusão
Migrar para o mercado livre de energia em 2026 é uma decisão estratégica com impacto direto no orçamento, na previsibilidade financeira e nas metas de sustentabilidade de médias e grandes empresas do Grupo A. O processo envolve seis meses de transição regulatória, escolha criteriosa de parceiro e estruturação adequada do contrato, em um cenário em que a solidez financeira da comercializadora e a existência de geração própria influenciam a segurança do fornecimento.
A Serena Energia oferece migração gerenciada sem custo adicional para clientes sob sua gestão, energia 100% eólica com emissão de I-RECs e créditos de carbono, contratos de preço fixo por até cinco anos e um painel digital para acompanhamento contínuo dos resultados.
Empresas que enfrentam custos elevados de energia podem reduzir despesas e ganhar previsibilidade. Simule seu desconto com a Serena Energia e veja quanto sua empresa pode economizar.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.