Group A companies can reduce energy costs without cutting consumption by migrating to the free energy market.
-
The migration process takes about 6 months and does not require a minimum consumption.
-
Fixed-price contracts eliminate the unpredictability of tariff flags and facilitate financial planning.
-
In addition to savings, the company can obtain renewable certification via I-REC to meet ESG goals.
-
Contact Serena Energia to receive a free feasibility analysis.
Prerequisites to start the migration
The company needs to organize basic consumption data and involve the right internal areas before starting the migration.
Required data:
-
Energy bills from the last 12 months
-
Current contracted demand, in kW
-
Monthly consumption profile, in kWh, including seasonality and peaks
-
Connection data, such as voltage level and identification code with the distributor
Internal areas to involve:
-
Finance / Controllership, to assess budget impact and approve the contract
-
Operations / Facilities, to monitor the adequacy of the metering system
-
ESG / Sustainability, to determine if the company wants to certify consumption as renewable
Serena Energia conducts the feasibility analysis at no cost. There is no minimum consumption required: the company just needs to be part of Group A, with medium or high voltage supply.
Overview of the process in 5 macro steps
-
Feasibility analysis: gathering invoices and consumption profile to project expected savings.
-
Contracting: signing the contract with the chosen retailer for five years, with a pre‑agreed price.
-
Managed migration: handling the entire bureaucratic process, including notification to the distributor, registration with CCEE (Electric Energy Commercialization Chamber) and metering system adjustment.
-
Activation: after six months from the start of the process, the company begins operating in the free energy market and starts accounting for savings.
-
Continuous management: monthly monitoring of consumption, billing and cost reduction performance by a dedicated consultant.
Each step depends on the previous one. Therefore, the sooner the company starts the feasibility analysis, the sooner it begins saving.
Step by step: how to migrate to the free energy market without operational impact
Step 1: verify eligibility
The company needs to confirm it is in Group A, with medium or high voltage supply. Checking current invoices shows consumption pattern and contracted demand. Serena Energia can perform this check for free.
Step 2: map the consumption profile
Monthly mapping in kWh reveals seasonality and demand peaks. This analysis guides the choice of contract type and defines the volume to be contracted. The typical internal responsible is the Facilities or Operations manager.
Step 3: choose the retailer and sign the contract
Choosing a retailer with its own generation and solid track record reduces risks. Serena Energia is among the largest wind and solar generators created in the Americas, with over 17 years of operation and clients such as Heineken, Cargill and Bayer.
Contracts usually have a five‑year term, with a fixed price for the contracted energy, which eliminates the uncertainty of tariff flags in the captive market.

Step 4: conduct the migration process
This step includes formal notification to the distributor, registration of the company with CCEE (Electric Energy Commercialization Chamber) and installation of metering equipment compatible with the free energy market.
Serena Energia fully assumes this step, at no additional cost to the client. Physical delivery of energy remains the responsibility of the local distributor, as the migration is purely a commercial and contractual process.
Step 5: activate supply and start monitoring
After six months from the start of the process, the company enters the free energy market. A Serena Energia consultant will monthly monitor actual consumption, accumulated savings and comparison with the captive market period.
The table below summarizes the main structural differences between the two models and shows how migration enhances predictability and contracting flexibility.
Captive market vs. free energy market
|
Criterion |
Captive market |
Free energy market |
|---|---|---|
|
Supplier choice |
No, local distributor mandatory |
Yes, company chooses the retailer |
|
Energy price |
Regulated by ANEEL, subject to adjustments and tariff flags |
Negotiated in bilateral contract, fixed for the agreed term |
|
Budget predictability |
Low, adjustments and flags impact cost |
High, price agreed in advance |
|
Renewable certification (I-REC) |
Not available |
Available upon contracting |
|
Physical delivery of energy |
Local distributor |
Local distributor, no change |
To start the process described above, the company will need to gather the following documentation.
Document checklist for migration
-
Energy bills from the last 12 months
-
Current demand contract with the distributor
-
Company legal documentation, such as CNPJ and articles of incorporation
-
Technical data of the consuming unit, such as voltage level and connection point
-
Power of attorney for representation before CCEE (Electric Energy Commercialization Chamber), when applicable
Common mistakes and how to avoid them
Not analyzing consumption seasonality. Companies that contract a fixed volume without considering seasonal variations can be exposed to the short‑term market in high‑consumption months, paying prices that reduce the planned savings.
To avoid this exposure, it is necessary to map the last 12 months before defining the contracted volume, so the contract reflects operational reality.
Underestimating the six‑month timeline. The migration process requires prior notification to the distributor. Companies that start the process without planning lose months of savings. A good practice is to complete the feasibility analysis, sign the contract and send the notification to the distributor within the same month.
Lack of internal alignment. When finance, operations and ESG are not aligned from the start, the process can stall on internal approvals. The company can reduce this risk by appointing a responsible person for each area before starting the feasibility analysis.
Choosing a retailer without its own generation. Companies that rely exclusively on purchasing energy from third parties to pass on to the client face higher supply risk. Serena Energia has its own generation, which gives greater solidity to the contract.
How to verify results after migration
Comparing the invoices from the captive market and the free energy market is the most direct indicator of savings.
Serena Energia provides a digital dashboard with information such as monthly bill savings, total consolidated savings, comparison between captive and free energy markets, monthly consumption forecast and consumption to date.
For finance, budget predictability indicators, such as the stability of the unit energy cost over months, are as relevant as the absolute discount. In the free energy market, the contracted energy price does not fluctuate with tariff flags, simplifying long‑term planning.
Monthly reviews with the Serena Energia consultant allow identifying consumption deviations from the contracted amount and adjusting the strategy when necessary.
Advanced options for companies with multiple sites or ESG goals
Companies with more than one consuming unit can consolidate supply into a single contract, which simplifies management and can increase savings. Serena Energia serves all of Brazil in the free energy market.
For ESG goals, Serena Energia issues I-RECs (International Renewable Energy Certificates) corresponding to the company's consumption. Each certificate audibly proves that 1 MWh was generated from a renewable source, in Serena Energia's case predominantly wind.
These certificates are globally recognized and used to offset Scope 2 emissions in sustainability reports. Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂.

For companies seeking to go further, Serena Energia offers carbon credits from certified projects, covering emission sources beyond electricity consumption.
Structure a contract that meets multiple units and decarbonization goals, talk to our specialists.
Frequently Asked Questions
Can any company in Group A migrate to the free electricity market?
Yes. As mentioned earlier, any consumer in Group A can migrate, regardless of consumption volume. Serena Energia conducts the eligibility analysis at no cost to confirm whether the consuming unit is qualified.
Does migration pose any risk of interruption in electricity supply?
No. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity, the wires, and grid stability. The only change is who the company purchases electricity from.
How long does the migration process take?
The regulatory deadline of 6 months mentioned earlier covers all bureaucratic steps, carried out by Serena Energia at no additional cost to the client.
What happens if the company consumes more or less energy than contracted?
Contracts provide a flexibility band. Consumption outside this band is settled in the short‑term market. Serena Energia monitors the actual consumption monthly and advises adjustments to reduce this exposure.
How do I‑REC certificates work in practice?
For each MWh consumed, Serena Energia can issue an I‑REC that tracks the energy from the generating source to the end consumer.
This certificate is globally recognized and allows the company to auditable declare that its electricity consumption is 100% renewable, which is relevant for sustainability reporting and ESG target compliance.

Conclusion: savings and predictability without reducing consumption
Group A companies, connected at medium or high voltage, have a concrete path to reduce energy costs without changing consumption or operations: migrating to the free electricity market.
The process takes about 6 months, does not require a minimum consumption, and can be fully handled by an experienced retailer such as Serena Energia, at no additional cost to the client.
The results go beyond bill savings. Fixed‑price contracts eliminate the uncertainty of tariff flags and bring predictability to financial planning. Renewable certification via I‑REC meets ESG requirements of investors, customers, and regulators.
A dedicated consultant monitors results month by month and supports necessary adjustments.
Find out how much your company can save: request a personalized simulation at no cost.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *