SERENA
Back to Blog
All articles • 08/08/2026

Companies: save without cuts with free energy market

Companies: save without cuts with free energy market

Written by: André Lima, Growth, Serena Energia

Main takeaways from this article

  • Electric energy is the last frontier of savings for Group A companies that already optimize payroll, suppliers, and processes.

  • Migrating to the free energy market allows for price fixation through a bilateral contract, reducing the impact of tariff flags and annual adjustments.

  • The regulatory process takes six months and requires a preliminary diagnosis with invoices from the last 12 months, as well as the involvement of the financial, operational, and legal departments.

  • Serena Energia handles the diagnosis, migration, management, and monitoring for clients under its management.

  • To get a personalized analysis and find out how much your company can save, talk to Serena Energia.

For Group A companies that have already adjusted their payroll, renegotiated suppliers, and streamlined processes, the electricity bill usually remains a significant and unpredictable cost. Annual adjustments from distributors and tariff flags complicate budgeting and pressure profit margins that have already been optimized on other fronts.

Migrating to the free energy market allows this cost to be treated strategically. The company begins to contract energy through a bilateral contract, with a defined price and clear timeframe, without altering operations, reducing teams, or investing in infrastructure. This content shows how this process works, from the initial diagnosis to the monthly monitoring of results.

Silhouette of several wind turbines aligned along the coast during a colorful sunset, with reflections in the water.
The exploration of natural resources, such as coastal winds, is essential to maintain the scale and sustainability required in the Free Energy Market.

Prerequisites to start the migration

Starting the migration requires data organization and internal alignment. The necessary documents are:

  • Energy invoices from the last 12 months

  • Monthly consumption data in kWh, separated by peak and off-peak hours

  • Current contracted demand

  • Confirmation of Group A classification, at medium or high voltage

The internal profiles that need to be involved are:

  • Finance or controlling: validate economic viability and approve the contract

  • Operations or facilities: monitor the adaptation of the metering system

  • Legal: review the bilateral supply contract

With these documents and profiles aligned, the company can begin the migration process. There is no minimum required consumption. Any Group A company, regardless of consumption volume, can migrate to the free energy market.

With preparation complete, the company is ready to follow the full migration flow. Below are the five macro-steps that lead from the initial diagnosis to the continuous monitoring of results.

Overview of the process in five macro-steps

Migrating to the free energy market follows a logical sequence. The process begins with reading the current consumption profile, moves on to financial decision-making based on concrete projections, advances to regulatory and technical transition, and ends with continuous management and monthly monitoring of savings.

  1. Invoice diagnosis

  2. Viability analysis

  3. Managed migration

  4. Continuous management

  5. Results monitoring

Each step is described in detail below. In all of them, Serena Energia acts as the person responsible for the process for clients under its management.

1. Invoice diagnosis

Objective

Map the company's current consumption profile and identify the invoice components that weigh most heavily on the total cost.

Actions

  • Detailed reading of invoices from the last 12 months

  • Identification of contracted demand, peak and off-peak consumption, charges, and taxes

  • Mapping of seasonality and demand peaks

Responsible parties

Serena Energia conducts the analysis at no additional cost. The client provides the invoices and consumption data.

Points of attention

Incomplete invoices or atypical consumption periods can distort the projection. Including months that represent the company's routine increases the accuracy of the diagnosis.

2. Viability analysis

2>

Objective

Project the expected savings from migration and present a detailed study to the financial manager.

Actions

  • Comparison between the current cost in the regulated market and the projected cost in the free energy market

  • Calculation of potential savings

  • Presentation of contractual conditions, such as term, fixed price, and consumption flexibility

Responsible Parties

Serena prepares the study. The decision to move forward belongs to the client.

Points of Attention

Savings apply to the energy portion, not the total bill. This happens because the distribution portion, which corresponds to the use of the local distributor's grid, remains regulated and continues to be billed separately. The local distributor remains responsible for the physical delivery of electricity. What changes is only who the company buys energy from.

Um único aerogerador branco se destaca em meio a uma densa camada de neblina ou nuvens, iluminado pela luz suave do pôr do sol.
Advanced wind technology allows Serena to capture steady winds at high altitudes, ensuring a clean, stable, and efficient energy source for your business.

3. Managed Migration

Objective

Execute all bureaucratic and technical steps necessary for the company to enter the free energy market.

Actions

  • Notification to the local distributor for the termination of the regulated contract

  • Company registration with CCEE (Electric Energy Commercialization Chamber)

  • Adaptation and installation of the metering system compatible with the free energy market

  • Signing of the bilateral supply contract with Serena

Responsible Parties

Serena conducts the entire process, including registration with CCEE and installation of metering equipment. The regulatory deadline for this stage is six months, starting from the notification to the distributor.

Points of Attention

The six-month deadline is a regulatory requirement and cannot be reduced. Savings begin on the first bill after the completion of the migration. Planning ahead is decisive: the sooner the company starts, the sooner it begins to save.

Start your migration with Serena and begin saving in six months.

4. Continuous Management

Objective

Keep the company in compliance with the obligations of the free energy market and ensure uninterrupted supply.

Actions

  • Representation of the company before CCEE in the retail model

  • Management of capital contributions and financial settlements

  • Payment to the local distributor, reducing the risk of disconnection due to financial issues

  • Monitoring of actual consumption against the contracted volume

Responsible Parties

Serena assumes the regulatory and financial obligations before CCEE. The client has a dedicated consultant available for questions and monitoring.

Points of Attention

Bilateral contracts provide for a consumption flexibility range, generally between 5% and 10% of the contracted volume. When actual consumption exceeds this range, the difference is settled in the short-term market, where prices can fluctuate. To minimize this exposure, Serena offers active management that tracks consumption and adjusts projections throughout the month.

5. Results Monitoring

Objective

Verify monthly savings achieved and compare performance with the period in the regulated market.

Actions

  • Access to Serena's digital dashboard featuring monthly savings and consolidated savings

  • Comparison between the cost in the regulated market and the cost in the free energy market

  • Monitoring of consumption forecast versus actual consumption

  • Identification of opportunities for contractual adjustment or operational efficiency

Responsible Parties

Serena provides the dashboard and the dedicated consultant. The financial or facilities manager tracks the indicators monthly.

Points of Attention

The correct comparison considers only the energy portion, as explained in the feasibility analysis. Serena's dashboard already makes this separation automatically.

See how much your company can save r with the Serena Energia dashboard.

Knowing the complete process helps plan the migration. Understanding where companies usually make mistakes prevents rework and delays. The following three points bring together the most frequent errors and how to prevent them.

Common mistakes and how to avoid them

Mistake

Why it happens

How to avoid

Waiting for the current contract to expire before starting the process

Underestimating the six-month regulatory deadline

Start the diagnosis at least six months in advance of the desired date to start saving

Comparing the free energy market tariff with the total regulated market bill tariff

Not isolating the energy portion in the comparison

Use the Serena Energia dashboard or ask the consultant for a comparison that considers only the contracted energy portion

Contracting an energy volume well above or below actual consumption

Not mapping seasonalities and demand peaks before closing the contract

Provide invoices from the last 12 months so that Serena Energia calibrates the contracted volume within the 5% to 10% flexibility range

How to check the results?

Checking the results in a structured way makes savings measurable and facilitates planning. Verification is done monthly through the Serena Energia digital dashboard. The main indicators are:

  • Monthly savings on the bill, in reais and in percentage

  • Consolidated savings since the beginning of the contract

  • Detailed comparison between cost in the regulated market and cost in the free energy market

  • Consumption forecast for the current month in relation to consumption achieved to date

This data allows the financial manager to incorporate the energy line into the annual budget with real predictability. The company starts treating energy as a contracted and trackable cost, rather than a variable that is difficult to control.

For companies that operate more than one consumer unit, this same process can be applied in a consolidated way. This approach further simplifies financial and operational management.

Advanced options for companies with multiple units

Companies with more than one consumer unit in Group A can consolidate the management of all of them under a single contract or under contracts coordinated by Serena Energia. This approach simplifies financial monitoring, centralizes the relationship with CCEE, and allows the manager to view the consolidated savings of the entire portfolio of units on a single dashboard. For networks with units in different states, Serena Energia serves all of Brazil in the free energy market, with no geographic restriction.

Frequently asked questions

Does my company need to be large to migrate to the free energy market?

No. Any company in Group A, which consumes at medium and high voltage, can migrate to the free energy market, regardless of consumption volume. There is no minimum consumption required. Serena Energia performs the eligibility analysis at no cost.

How long does the migration process take?

The regulatory process takes six months, as detailed in the managed migration step. Serena Energia conducts all steps during this period, at no additional cost to the client.

Does the local distributor stop serving my company after migration?

No. The local distributor remains responsible for the physical delivery of electricity, network maintenance, and supply quality. What changes is who the company buys energy from. In the free energy market, this choice becomes the company's, rather than an obligation imposed by the regulated market.

What happens if my consumption varies throughout the contract?

Bilateral contracts provide for a flexibility range, usually between 5% and 10% of the contracted volume. Consumption within this range generates no additional cost. When consumption falls outside this range, the difference is settled in the short-term market. Serena Energia offers active management to monitor consumption, forecast variations, and support contractual adjustments when necessary.

How does migration contribute to sustainability goals

of the company?

The energy provided by Serena in the free energy market is 100% renewable, sourced from wind power. For each MWh consumed, Serena can issue an I-REC, a globally recognized certificate that proves the clean origin of the energy and allows the company to declare 100% renewable consumption in its sustainability reports, reducing Scope 2 emissions. Serena also offers carbon credits to neutralize other emission sources.

Side profile of a worker at a wind farm, with the sun in the background and several wind turbines stretching across the horizon.
The dedication of qualified professionals in the field is what guarantees the efficiency and constant availability of clean energy that drives our clients' businesses.

Discover how much your company can save with 100% renewable energy.

Conclusion

For most Group A companies, electricity is one of the last major operational cost lines that has not yet been addressed structurally. Annual distributor adjustments and tariff flags make budget planning inaccurate and erode margins that have already been optimized on other fronts. Migrating to the free energy market allows you to tackle this problem without altering operations, without reducing teams, and without investing in infrastructure.

Serena guides the process from bill diagnosis to the monthly monitoring of results, with long-term bilateral contracts that fix the price of energy. With over 17 years of history, 17 operational plants, and clients such as Heineken, Cargill, and Bayer, Serena is among the largest wind and solar energy generators created in the Americas.

Talk to one of our consultants and discover how much your company can save without cutting anything that is already working.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *