How to eliminate waste and reduce energy costs?

How to eliminate waste and reduce energy costs?

Written by: André Lima, Growth, Serena Energia

Main lessons from this article

  • Group A companies can significantly reduce their energy bill by mapping consumption and eliminating operational waste, such as compressed air leaks and idle equipment.

  • An Energy Management System (EMS) enables continuous monitoring, anomaly detection, and maintaining the gains achieved in the early stages.

  • Starting the migration to the free energy market in parallel with operational actions avoids delays, as the regulatory process takes up to 6 months and replaces tariff flags with a fixed price.

  • Maintaining preventive maintenance programs, automation, and proper metering consolidates savings and reduces the risk of waste recurrence over time.

  • With Serena Energia, you get managed migration, energy management, and consulting at no additional cost. Talk to our specialists.

Prerequisites to start

Three conditions create the foundation for a consistent energy cost reduction project:

  • Documentation: gather the energy bills from the last 12 months, the contracted and measured demand data, and consumption records by unit or department, when available. These documents form the baseline that allows measuring the real impact of each action implemented in the subsequent stages.

  • Multidisciplinary team: involve finance to validate the impact on the P&L, operations or facilities to map equipment and processes, and sustainability to align ESG goals and certifications. This combination reduces gaps in the diagnosis and increases adoption of changes.

  • Proper measurement: verify whether critical consumption points have individual meters or if sub‑meters need to be installed before the diagnosis. Without granular data, the following stages lose accuracy and the savings potential diminishes.

Process overview in 5 steps

The process follows a logical and sequential flow: consumption diagnosis → elimination of operational waste → implementation of continuous monitoring → preventive maintenance and automation → migration to the free energy market.

Each step generates inputs for the next phase and the accumulated results build the financial case that justifies and amplifies the migration to the free energy market.

Step‑by‑step: how to eliminate waste and reduce energy costs?

Step 1 — Consumption diagnosis (weeks 1–2)

Goal: map where and when energy is consumed and identify the biggest waste hotspots.

Actions: analyze the last 12 months of bills to identify seasonality and demand peaks, compare contracted demand with measured demand, walk the plant to list high‑power equipment and their operating regimes, record operating hours of HVAC, compressors, lighting, and motors.

Owner: facilities or operations manager, with finance support to cross‑reference production and consumption data.

Expected outcome: consumption map by area, prioritized list of opportunities, and baseline to measure future reductions.

Step 2 — Elimination of operational waste (weeks 3–6)

Goal: tackle the identified waste with low‑cost, quick‑impact actions.

Idle equipment continues to consume energy even without producing output. This waste worsens when waiting time, equipment failures, and rework keep compressed‑air, HVAC, and ventilation systems running without generating productive output.

To address these waste sources, the priority actions in this step include:

  • Detect and repair compressed‑air leaks, as fixes in this system generate significant annual savings, with a typical payback of 12 to 24 months.

  • Replace conventional lighting with LED, since switching to LED can reduce lighting consumption by up to 75%.

  • Group similar production batches to reduce machine start‑up and shut‑down cycles. Each additional start‑up, shutdown, and cleaning cycle consumes extra energy. Larger, more homogeneous batches lower consumption without affecting output volume.

  • Schedule automatic equipment shutdown outside productive hours, avoiding consumption during non‑production periods.

Owner: operations manager and maintenance team.

Step 3 — Implementation of continuous monitoring (weeks 5–8)

Goal: create real‑time visibility to sustain the achieved reductions and identify new deviations.

To achieve this goal, the central tool is an Energy Management System (EMS), which continuously monitors consumption, detects anomalies such as power spikes at unusual times, and identifies unnecessary consumption like excessive machine operation and devices in idle mode.

The implementation follows five stages: energy audit, meter installation, system configuration, integration with IT infrastructure, and commissioning with continuous monitoring.

Investment in an EMS can pay for itself in a few years, depending on the organization’s size and consumption volume. This return accelerates in companies with multiple sites, where centralized integration enables remote management and performance comparison across plants, uncovering improvement opportunities that would be invisible in isolated analyses.

Ready to turn visibility into real savings? Simulate how much your company can save with continuous monitoring and managed migration.

Step 4 — Preventive maintenance and automation (weeks 7–12)

Goal: consolidate operational gains with structured maintenance programs and automation of energy‑intensive processes.

Predictive maintenance programs can considerably reduce total maintenance costs and emergency repair expenses. Keeping HVAC coils clean, sensors calibrated, and filters within specification ensures controls operate correctly and deliver the expected energy savings.

Automation complements maintenance, as automated systems dynamically adjust energy consumption to current needs, eliminating waste and increasing efficiency.

To ensure both maintenance and automation are consistently implemented, use the checklist below as the final validation of this step:

  • Documented preventive maintenance plan for the top 5 highest‑consumption equipment

  • Presence sensors installed in intermittently used areas

  • Automatic shutdown scheduling configured in the EMS

  • Monthly deviation report generated automatically

Step 5 — Migration to the free energy market (starting day 1, completion within up to 6 months)

Goal: replace regulated, tariff‑flag‑subject cost with a contract at a pre‑agreed price, adding financial savings to the operational gains already achieved.

The migration can and should be started in parallel with the previous steps, as the regulatory process takes 6 months.

Serena Energia conducts the entire managed migration process at no additional cost to the client: feasibility analysis, registration with CCEE (Electric Energy Commercialization Chamber), metering system adaptation, and continuous management after entering the free energy market.

Savings can reach up to 20% compared to the captive market, with a fixed price that reduces uncertainty associated with tariff flags.

Aerial view of a vast solar plant with long rows of photovoltaic panels capturing the sunset light.
Large‑scale solar farms allow capturing energy with maximum efficiency, optimizing credits that drastically reduce fixed costs for partner companies.

Common mistakes and how to avoid them

Across the five steps, four pitfalls frequently appear and can jeopardize the process results. The table below summarizes each mistake, its impact, and the corresponding preventive action.

Mistake

Consequence

How to avoid

Starting without a consumption baseline

Impossible to measure real results

Collect 12 months of bills before any action

Treating the free energy market migration as a final isolated step

6‑month delay in starting savings

Start the migration process on day 1, in parallel

Involving only one area, e.g., finance only

Incomplete diagnosis and low operational buy‑in

Form a multidisciplinary team from the start

Not monitoring after improvements

Waste returns undetected

Deploy EMS with automatic alerts

How to verify the results

Structured tracking of results consolidates savings and guides new adjustments.

Operational: monitor consumption in kWh per production unit (energy ratio), number of corrective maintenance occurrences per month, and percentage reduction of peak demand.

Financial: track month‑to‑month energy bill variation compared to the baseline, and cumulative savings since entering the free energy market. Serena Energia provides a digital dashboard with monthly savings, consolidated savings, comparison between captive and free energy markets, consumption forecast, and actual consumption.

Sustainability: monitor Scope 2 CO₂ tons offset through I‑RECs (International Renewable Energy Certificates) issued by Serena Energia for each MWh consumed from renewable sources.

Landscape of a renewable energy park at sunset,
showcasing large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the supply of the Free Market.

The recommended review frequency is monthly for operational and financial indicators and quarterly for sustainability indicators and alignment with ESG goals.

Want to track your savings in real time? Talk to our consultants and discover Serena Energia's digital dashboard.

Advanced options for multiple units and sustainability goals

Companies with multiple consumer units can centralize energy management in a single integrated EMS, compare performance across plants and prioritize investments where impact is greatest. Automation in an EMS enables remote access and centralized management across multiple locations.

For sustainability goals, Serena Energia issues traceable I-RECs from the generating source to the end consumer, allowing the company to declare 100% renewable consumption in ESG reports.

Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂. For companies seeking to neutralize emissions beyond Scope 2, Serena Energia also offers carbon credits from certified projects.

A single white wind turbine stands out amid a dense layer of fog or clouds, illuminated by the soft light of the sunset.
Advanced wind technology enables Serena Energia to capture constant winds at high altitudes, ensuring a clean, stable and efficient energy source for your business.

Frequently Asked Questions

Can my Group A company migrate to the free energy market?

Group A comprises consumers served at medium and high voltage. Any company in this range can migrate to the free energy market, regardless of consumption volume. There is no minimum consumption required. Serena Energia conducts the eligibility analysis at no cost.

How long does the migration take and who handles the process?

The regulatory process takes 6 months, counted from the notification to the distributor. Serena Energia assumes the entire process described in Step 5, at no additional cost to the client under its management. Therefore, the sooner the process is started, the sooner the company begins to save.

Does migration to the free energy market pose any risk to operations?

No. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity and grid stability.

The only change is who the company purchases the energy from. Serena Energia installs the necessary measurement equipment at no additional cost and oversees the entire process to ensure no impact on operations.

How do operational waste reductions connect to savings in the free energy market?

The two initiatives are complementary. Reducing waste lowers the volume of energy consumed. Migrating to the free energy market reduces the price paid for each MWh consumed. Combined, the actions affect both consumption and unit cost, amplifying the total bill reduction.

Moreover, a more stable and predictable consumption profile facilitates contract negotiations in the free energy market.

How to prove to stakeholders that the consumed energy is renewable?

As described in the advanced options section, Serena Energia issues I-RECs (International Renewable Energy Certificates) for each MWh consumed, globally recognized certificates that verify the renewable origin of the energy.

It is the standard tool to zero Scope 2 emissions in sustainability reports and meet the requirements of investors, customers and ESG audits.

Summary and next steps

Eliminating operational waste and reducing energy costs in Group A companies, medium and high voltage consumers, requires combining quick operational actions with migration to the free energy market.

The roadmap covers consumption diagnosis, waste elimination with quick‑impact actions, continuous monitoring via EMS, preventive maintenance and automation, and managed migration to the free energy market with pre‑agreed pricing and 100 % certified renewable energy.

Serena Energia, one of the largest wind and solar power generators created in the Americas, offers the managed migration process detailed in Step 5, as well as energy management and consulting, all at no additional cost for clients under its management, along with I-RECs and carbon credits for sustainability goals.

Clients such as Heineken, Cargill and Bayer already use the platform to turn energy costs into a competitive advantage.

Turn energy costs into a competitive advantage. Simulate your discount and start your managed migration today.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *