How to have renewable energy without installation for a company

How to have renewable energy without installation for a company

Written by: André Lima, Growth, Serena Energia

Main takeaways from this article

  • Companies in Group A can migrate to the free electricity market without installing equipment or altering their infrastructure.

  • In the free electricity market, the company can negotiate a fixed price in advance and have cost predictability, without impact from tariff flags.

  • The migration allows contracting 100% renewable energy with I‑REC certification and meeting ESG goals without works or initial investments.

  • Serena Energia conducts the entire process, with analysis, documentation, registration with CCEE (Electric Energy Commercialization Chamber) and measurement adaptation.

  • To start your migration and discover how much your company can save, talk to a Serena Energia consultant.

What is renewable energy without installation and how does the free electricity market work?

The free electricity market allows Group A companies, connected at medium or high voltage, to negotiate volume, price and term directly with generators or retailers, without installing any equipment or altering existing infrastructure. The energy is produced in large‑scale wind or solar parks, injected into the national grid and delivered to the consumer unit by the local distributor, using the same physical structure used today.

A single white wind turbine stands out amid a dense layer of fog or clouds, illuminated by the soft light of sunset.
Advanced wind technology enables Serena Energia to capture constant winds at high altitudes, guaranteeing a clean, stable and efficient energy source for your business.

The difference lies in the contract. Instead of buying energy at regulated tariffs, the company negotiates a price agreed in advance with the chosen retailer. Since January 2024, any Group A company can migrate to the Free Contracting Environment without a minimum demand requirement.

Serena Energia manages the entire migration process and the ongoing operation for clients under its management, connecting the company to 100% wind energy with renewable source certification.

Remote credit energy vs. free electricity market: comparison

Many companies start the search for renewable energy without installation by evaluating remote credit models, where the consumer purchases shares of a distant plant and receives discounts on the distributor’s bill. This model has different characteristics from the free electricity market. To support the decision, the table below compares the two models on the criteria that most impact operations and financial results.

Criterion

Remote energy credits

Free electricity market with Serena Energia

Initial investment

None, subject to enrollment and contractual loyalty fees

None, measurement adaptation costs are assumed by Serena Energia

Operational complexity

Low for the consumer, credit management done by the provider

Low for the consumer, regulatory and financial management conducted by the retailer

Price predictability

Partial, discount tied to the distributor’s tariff, which varies with tariff flags

High, price contracted in advance, independent of tariff flags

Renewable source certification

Limited, not all providers issue globally recognized I‑RECs

I‑RECs issued per MWh consumed, internationally recognized for Scope 2 reporting

Continuous management

Restricted to tracking credits on the bill

Active management in CCEE, monitoring dashboard and dedicated consultant

Receive a personalized comparative study with your company’s numbers.

Who can migrate? Eligibility criteria

Eligibility is straightforward: any Group A company can migrate to the free electricity market. There is no minimum consumption requirement since January 2024. Industries, retail chains, hospitals, malls and corporate offices supplied at medium or high voltage are eligible.

Serena Energia conducts the eligibility analysis for free, evaluates the invoices and the company’s consumption profile, and projects the expected savings before any contractual commitment.

Migration steps to the free electricity market

1. Feasibility analysis

Serena Energia analyzes the invoices and the company’s consumption profile, projects the savings and presents a detailed study at no cost.

2. Contract signing

The company signs a contract with Serena Energia, usually for five years, with a price agreed in advance for the contracted energy.

3. Notification to the distributor

Serena Energia carries out the formal communication of the termination of the regulated contract with the local distributor and respects the legally required notice period.

4. Registration with CCEE (Electric Energy Commercialization Chamber)

The registration involves technical, legal and financial documentation. Serena Energia is responsible for the entire process.

5. Measurement system adaptation

Hourly measurement is mandatory in the free electricity market. Serena Energia assumes responsibility for installing the necessary equipment.

6. Start of supply

After the migration period, which takes up to six months and is determined by the notice given to the distributor, the company begins operating in the free electricity market and starts receiving the contracted benefits.

7. Continuous monitoring

A dedicated Serena Energia consultant monitors contract performance, tracks consumption and advises adjustments when necessary.

Start your migration hassle‑free with the support of a dedicated consultant.

How daily operation works

After migration, the company receives two invoices: one from Serena Energia for the contracted energy, and one from the local distributor for the use of the distribution network, the wires. Serena Energia centralizes the management of these obligations, represents the client before CCEE and handles the financial settlements.

Side profile of a worker in a wind farm, with the sun in the background and multiple wind turbines stretching across the horizon.
The dedication of qualified field professionals is what guarantees the efficiency and constant availability of clean energy that powers our clients’ businesses.

The client has access to a digital dashboard showing monthly savings, a comparison between captive and free markets, actual consumption and consumption forecast. A dedicated consultant is available to answer questions and monitor cost‑reduction performance.

Common risks and how Serena Energia mitigates them

The main operational risk in the free electricity market is consumption deviation from the contracted volume. When actual consumption falls outside the flexibility range defined in the contract, the difference is settled in the short‑term market, which can generate additional costs.

Serena Energia actively manages this risk, monitors consumption monthly, anticipates deviations and advises contractual adjustments when needed. Physical delivery of the energy remains the responsibility of the local distributor, which is regulated to maintain quality and continuity of supply. Migration is a commercial process and does not alter grid stability.

Why choose Serena Energia

Serena Energia has more than 17 years of history as a pioneer in wind energy and is among the largest wind and solar generators created in the Americas. In the free electricity market, it operates primarily with wind energy from parks that run at high efficiency in regions with above‑average wind.

Silhouette of several wind turbines aligned along the coast during a colorful sunset, with reflections on the water.
Exploiting natural resources, such as coastal winds, is essential to maintain the scale and sustainability required in the Free Electricity Market.

Serena Energia has vertical integration between generation and commercialization, which brings solidity to supply. Its client portfolio includes companies like Heineken, Cargill and Bayer. Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂.

For each MWh consumed, Serena Energia can issue I‑RECs, international certificates that prove the renewable origin of the energy and are used in sustainability reports to offset Scope 2 emissions. The company also offers carbon credits for neutralizing other emission sources.

Summary of benefits and next steps

Group A companies that migrate to the free electricity market with Serena Energia obtain cost predictability with a price agreed in advance, 100% renewable energy certified by I‑RECs, and full process management, without installing panels, without works and without operational impact.

The first step is a free analysis of the company’s invoices. From that analysis, Serena Energia guides each stage until the start of supply in the free electricity market.

Request your free feasibility study and discover how much your company can save.

Frequently asked questions

Does a company need to install solar panels to get discounted renewable energy?

No. In the free electricity market, the company contracts energy directly from a generator such as Serena Energia, which produces wind energy in large‑scale parks. This energy is injected into the national grid and delivered to the consumer unit by the local distributor, without installation, construction or alteration of the company’s infrastructure.

How long does the migration to the free electricity market take?

The process

It takes up to six months, a period determined by the prior notice that the distributor requires to terminate the regulated contract. Throughout this period, Serena Energia conducts each step, with documentation, registration with CCEE, measurement adjustment, and schedule monitoring.

What changes in the energy bill after the migration?

The company begins to receive two invoices: one from Serena Energia, referring to the contracted energy with a price agreed in advance, and one from the local distributor, referring to the use of the distribution network. Serena Energia centralizes the management of these obligations and the client has a digital dashboard to monitor monthly savings and actual consumption.

What is the I-REC and why is it relevant for ESG reporting?

The I-REC (International Renewable Energy Certificate) is a globally recognized digital certificate that verifies that a certain amount of energy was generated from a renewable source and injected into the grid. For each MWh consumed, Serena Energia can issue a corresponding I-REC. This document is the main tool for companies to demonstrate, in an auditable way, that their electricity consumption is 100% renewable, an essential requirement for sustainability reports and for the reduction of Scope 2 emissions before investors, regulators, and other stakeholders.

What happens if the company's consumption varies relative to the contracted volume?

Contracts in the free energy market provide a flexibility band for consumption variations. If the actual consumption falls outside this band, the difference is settled in the short‑term market. Serena Energia actively manages this risk, monitors consumption monthly, and advises adjustments to minimize exposures. In the retail model, where Serena Energia acts as a trader and manager, the client does not need to directly monitor the settlements at CCEE, as this process is handled by Serena Energia.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.