Common mistakes when reducing business energy costs

Written by: André Lima, Growth, Serena Energy
Key lessons from this article
-
Conducting a full audit of invoices before any decision prevents improper payments and identifies immediate savings opportunities.
-
Mapping the consumption profile, including peaks and seasonality, is essential to contract appropriate volumes and avoid short‑term market exposure.
-
Choosing the supplier based on financial solidity, own generation and integrated solutions, not just the lowest management fee, increases real savings and operational security.
-
Having a partner that assumes all regulatory complexity, metering and representation at CCEE (Electric Energy Commercialization Chamber) reduces risks of delays, fines and documentation errors.
-
After migration, continuous monitoring and renewable source certification are essential to sustain results, contact Serena Energy and start your journey.
Financial, operational and sustainability impact
Reactive energy management raises costs, creates uncertainty and weakens sustainability goals. Financially, the lack of a defined price in the contract prevents the building of reliable budgets and exposes cash flow to fluctuations that hinder investment decisions.
Operationally, poorly structured contracts or suppliers without own generation backing can jeopardize supply continuity. In terms of sustainability, without auditable certification of energy origin, Scope 2 emission reduction targets lack verification before investors and regulators.
The opening of the free energy market for medium and high voltage consumers in January 2024 created a concrete window for Group A companies to exit the regulated environment and take control over price, term and energy source. Ignoring this opportunity is a strategic mistake. Companies that decide to migrate need to structure the process to avoid failures that reduce or nullify the potential savings.
7 common mistakes made by Group A companies
Mistake 1: not auditing invoices before any decision
Reducing energy costs without understanding the invoice composition leads to imprecise decisions. Inappropriate tariff modality, contracted demand above actual consumption, and improperly charged fees are frequent problems that go unnoticed without a detailed review.
The impact is direct: the company pays more than it should even before considering any supplier change. Therefore, a full invoice audit is the starting point for any cost‑reduction strategy. Serena Energy performs this invoice and consumption profile analysis as part of the feasibility study, at no additional cost.
Mistake 2: ignoring peak hours in consumption sizing
Concentrating consumption during peak hours raises energy costs in the regulated market. Companies that do not map their demand peaks before migrating to the free energy market may contract inadequate volumes and become more exposed to the short‑term market.
A precise diagnosis of the monthly consumption profile, with seasonality and peaks, is the starting point to structure an efficient contract. This mapping guides the volume to contract and the flexibility needed to match operations.
Mistake 3: choosing a supplier based only on the lowest management price
Selecting a company to connect the business to the free energy market based only on the lowest management fee reduces service quality. Companies that adopt this criterion risk contracting superficial services, lacking market intelligence or negotiating power, resulting in higher final energy costs and lower savings than expected.
The supplier’s financial solidity, own generation capacity and portfolio of integrated solutions are criteria as relevant as price. Serena Energy has been operating for over 17 years in generation and commercialization of renewable energy for clients such as Heineken, Cargill and Bayer, reinforcing operational consistency and contract management.
Mistake 4: underestimating the regulatory complexity of migration
Migration to the free energy market requires a sequence of regulatory steps. The process involves prior notification to the distributor, registration with CCEE (Electric Energy Commercialization Chamber), adaptation of the metering system and continuous management of sector obligations.
Companies that try to conduct this process internally, without specialists, often face delays, documentation errors and fine risks. Serena Energy assumes this process for the client, from distributor notification to representation before CCEE in the retail model.
Mistake 5: not monitoring consumption after migration
Failing to monitor consumption after entering the free energy market reduces contract efficiency. Suppliers that do not invest in monitoring technology provide little visibility into consumption, hindering real‑time waste identification and rapid cost‑reduction decisions.
Consumption outside the contracted range is settled in the short‑term market and can generate unforeseen costs. Serena Energy provides a digital dashboard with monthly savings, actual consumption, consumption forecast and a comparison between captive and free energy markets.
Mistake 6: sizing the project without independent technical assessment
Contracting energy volumes without a technical assessment of the unit’s actual consumption profile increases the risk of under‑ or over‑sized contracts. Without independent assessment, contracts suffer from poorly adjusted volumes and higher operational costs.
A correct diagnosis considers seasonality, production shifts and demand variations before defining the volume to contract. This analysis reduces the need for frequent adjustments and improves contract fit to operations.
Mistake 7: disregarding renewable source certification
Migrating to the free energy market without requiring renewable source certification limits the company’s ESG potential. Without the I‑REC (International Renewable Energy Certificate), it is not possible to prove to investors, customers and boards that the consumed energy is truly clean.
Serena Energy issues I‑RECs for each MWh consumed and offers carbon credits to offset other emission sources. Since 2017, the company has avoided more than 2.14 million tonnes of CO₂, reinforcing its contribution to corporate climate goals.

Contact one of our consultants to understand how to structure the migration without incurring these mistakes.
Comparison of solution alternatives
Group A companies seeking to reduce energy costs have, in practice, three main paths: stay in the regulated market, migrate to the free energy market with self‑management, or migrate with a managed migration partner.
Staying in the regulated market requires no initial investment nor operational change, but keeps the company subject to annual tariff adjustments and tariff flags, without choice over the energy source. There is no long‑term price predictability and renewable source certification is not available by default.
Migrating to the free energy market with self‑management requires the company to internally build regulatory expertise, assume representation before CCEE, manage the metering system and continuously monitor consumption. Internal operational costs tend to be higher and the risk of regulatory errors greater.
Managed migration with Serena Energy transfers this complexity to a partner with own generation, 17‑year history and a portfolio of large‑scale clients. The migration process, metering system adaptation, regulatory representation and continuous monitoring are under Serena Energy’s responsibility. The client then operates with a contract‑defined price, 100 % certified renewable energy and access to a digital monitoring dashboard.

Contact one of our consultants and compare the alternatives based on your company's consumption profile.
Step‑by‑step evaluation and implementation
1. Diagnosis and eligibility
The first step is to confirm that the company is in Group A, connected at medium or high voltage. There is no minimum consumption required to migrate. Then, gather the invoices from the last 12 months to map consumption, contracted demand and seasonality.
2. Technical and economic analysis
Based on the invoices, Serena Energy projects the expected savings and presents a detailed study at no additional cost. This stage defines the volume to contract and the contract type best suited to the company's profile.
3. Contracting
The contract typically has a term of about five years, with a pre‑agreed fixed price. This structure eliminates tariff‑flag uncertainty and enables long‑term budget planning.
4. Migration process
Serena Energy conducts all stages of the migration process: notification to the distributor, registration with CCEE (Electric Energy Commercialization Chamber), adaptation and installation of the metering system. The regulatory deadline is six months for migration completion.
Contact one of our consultants to start the process and accelerate the onset of savings.
5. Activation and continuous monitoring
After activation, the client accesses Serena Energy’s digital dashboard with monthly savings, actual consumption, consumption forecast and a comparison between the two environments. A dedicated consultant monitors the contract and is available for questions and performance adjustments.

Frequently Asked Questions
Can any Group A company migrate to the free energy market?
Yes. Since January 2024, any company connected at medium or high voltage, the so‑called Group A, can migrate to the free energy market, regardless of consumption volume. There is no minimum consumption required. Serena Energia conducts the eligibility analysis at no additional cost.
Does migration pose a risk of interruption in energy supply?
No. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of energy; the wires, poles, and grid stability remain the same. The only difference is who the company purchases the energy from. Serena Energia operates with its own renewable energy generation to cover 100% of the consumption contracted by customers.
What is the I-REC and why is it relevant for ESG goals?
The I‑REC (International Renewable Energy Certificate) is a globally recognized certificate that audibly proves that 1 MWh of energy was generated from a renewable source and injected into the grid. This certificate is the main tool to zero Scope 2 emissions in sustainability reports and meet the demands of investors, customers, and boards. Serena Energia issues I‑RECs for each MWh consumed by its customers.
How long does the migration process take?
The regulatory process takes six months, the period required to terminate the contract with the distributor. Serena Energia handles all stages, such as documentation, registration with CCEE, installation of the metering system, at no additional cost to the client. The sooner the process is started, the earlier the company begins operating with the price defined in the contract.
How does billing work in the free energy market?
In the retail model, the client receives two invoices: one from Serena Energia, concerning the energy consumed at the contracted price, and one from the local distributor, concerning the use of the distribution network. Serena Energia centralizes the management and the client has the support of a dedicated consultant to monitor billing and contract performance.
Conclusion and next steps
The seven mistakes described in this article share a common cause: trying to reduce energy costs without a structured diagnosis, without a partner with its own generation, and without continuous monitoring. This scenario often results in new expenses, regulatory risks, and sustainability goals without verification.
The first concrete step is to gather the energy invoices from the last 12 months and the company's consumption history. This material is sufficient for Serena Energia to conduct a detailed feasibility study and project the expected savings from migrating to the free energy market.
Serena Energia has been operating for more than 17 years in the generation and commercialization of renewable energy, with 17 operational plants in Brazil and the United States and capacity to supply the equivalent of 4.2 million households. In the free energy market, the company offers managed migration, 100% renewable energy with issuance of I‑RECs and carbon credits, contracts with a pre‑agreed price, and a digital monitoring dashboard with a dedicated consultant. The physical delivery of energy remains the responsibility of the local distributor.
Talk to one of our consultants and start your company's diagnosis today.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *
