Energy efficiency: strategies for Group A companies

Written by: André Lima, Growth, Serena Energia
Key lessons from this article
- Group A companies face high and unpredictable costs in the captive market due to adjustments and tariff flags, making energy efficiency a strategic priority.
- The most effective sequence starts with energy audit, power factor correction and automation, and continues with equipment replacement and system optimization.
- After reducing consumption, migrating to the free energy market allows contracting a fixed price for 3 to 5 years and eliminating exposure to tariff flags.
- Combining energy efficiency with renewable energy certified by I-RECs generates cost reduction, budget predictability and meeting ESG goals.
- To implement these strategies and obtain a personalized savings study, talk to a Serena Energia consultant.
Essential concepts every manager needs to master
Understanding the energy contracting environments in Brazil guides the choice of cost reduction strategies.
The captive market is the traditional model, in which the company purchases energy from the local distributor at regulated tariffs. There is no supplier choice nor price negotiation.
The free energy market, also called the Free Contracting Environment (ACL), allows Group A companies to choose the supplier and negotiate price, term and volume directly. The local distributor remains responsible for the physical delivery of electricity, and the difference lies in who supplies the energy and at what price. Since January 2024, any company connected at medium or high voltage can migrate, regardless of consumption level.
The renewable energy from sources such as wind and solar is the basis of Serena Energia's offering in the free energy market. The Renewable Energy Certificates (I-RECs) are traceable digital documents that auditable prove that each MWh consumed originated from a clean source. These certificates support ESG reporting and Scope 2 decarbonization goals.

Understand how these concepts apply to your company's profile with the support of a Serena Energia consultant.
Energy efficiency strategies: logical and prioritized sequence
Following a sequence that starts with lower-cost, faster-return actions facilitates capturing gains and planning larger investments.
1. Energy audit
Mapping where and how the company consumes energy is the starting point. An audit identifies inefficient equipment, unnecessary peak times and reduction opportunities before any significant investment.
2. Power factor correction
Keeping the power factor below the minimum limit generates excess reactive energy charges on the invoice of Group A companies. Correcting this indicator with a capacitor bank usually yields high financial return in a short time.
3. Combat phantom consumption and automation
Equipment in standby mode, lighting left on in unoccupied areas and systems operating outside productive hours generate consumption without creating value. Timers, presence sensors and programmable logic controllers reduce this waste with relatively low investment.
4. Replacement of equipment and lighting
Replacing motors, compressors and lighting systems with more efficient versions reduces baseline consumption. The audit should guide prioritization, focusing on equipment that operates many hours and currently has low efficiency.
5. HVAC optimization
HVAC systems represent a significant portion of consumption in commercial and industrial facilities. Adjusting setpoints, maintaining filters and heat exchangers in good condition and applying variable frequency drives on compressors reduces consumption without compromising comfort or process quality.
6. Continuous monitoring
Installing smart meters per circuit or per production line allows identifying deviations in near real-time. This monitoring sustains the gains achieved and underpins decisions on new efficiency investments.
Migration to the free energy market as a complementary step
Reducing consumption before migrating puts the company in a more favorable position to negotiate in the free energy market. The company consumes less, presents a more predictable load profile and amplifies the effect of each percentage point of contracted discount.
In this context, the free energy market offers contractual conditions that reinforce efficiency gains. Contracts have a pre‑agreed price, generally for periods of 3 to 5 years, which eliminates exposure to captive market tariff flags. Serena Energia offers 100% wind energy with issuance of I‑RECs for each MWh consumed.

The migration process managed by Serena Energia includes feasibility analysis, handling all bureaucratic steps with the CCEE (Electric Energy Commercialization Chamber), installation of measurement equipment and continuous contract management. All occurs at no additional cost for clients under Serena Energia's management. The regulatory deadline is 6 months from notification to the distributor.
Start your feasibility analysis with no commitment with the support of the Serena Energia team.
Comparison between low-cost measures and structural solutions
The table below summarizes the investment level, implementation timeline and impact on cost predictability of each measure, helping prioritize actions according to the company's profile and urgency.
| Measure | Investment level | Implementation timeline | Impact on cost predictability |
|---|---|---|---|
| Power factor correction with capacitor bank | Low to medium | Low to medium | High, eliminates variable reactive energy charges |
| Combat phantom consumption and basic automation | Low | Weeks | Medium, reduces baseline consumption without changing tariff structure |
| Replacement of equipment and lighting | Medium to high | Months | Medium to high, generates permanent consumption reduction |
| Migration to the free energy market | No additional cost with Serena Energia | 6 months, regulatory timeline | High, allows contracted fixed price without tariff flags |
Benefits by target audience profile
Financial directors and controllers
Combining energy efficiency with migration to the free energy market directly impacts the P&L. Power factor correction reduces variable charges, and contracting in the free energy market replaces regulated tariffs subject to adjustments with a fixed price, allowing more accurate budget planning for several years.
Operations directors and managers
Automation and continuous monitoring reduce overload failures and extend equipment lifespan. Migration to the free energy market does not change grid operation, and, as explained earlier, the local distributor remains responsible for delivery. Serena Energia assumes regulatory management with the CCEE (Electric Energy Commercialization Chamber) and avoids increased operational complexity for the client.
ESG and sustainability managers
The energy contracted with Serena Energia is 100% wind. For each MWh consumed, the company can obtain I‑RECs, globally recognized certificates that prove the renewable origin of the energy and allow declaring 100% clean consumption in sustainability reports. This practice helps meet investor and supply chain requirements. Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂.

What changes in operation after implementation
After migrating to the free energy market with Serena Energia, the company receives two invoices, one for energy issued by Serena Energia, and another for distribution issued by the local distributor. Serena Energia centralizes management, handles payment to the distributor and provides a digital dashboard with monthly savings tracking, actual consumption, consumption forecast and comparison between captive and free energy markets.
In the sustainability field, I‑RECs are issued proportionally to consumption and can be used directly in annual ESG reports. For companies seeking to neutralize emissions beyond Scope 2, Serena Energia also offers carbon credits from certified projects.
Common risks and best mitigation practices
- Consumption outside the contracted range: free energy market contracts provide a flexibility range, generally between 5% and 10% of the contracted volume. Continuously monitoring consumption and having the support of a dedicated Serena Energia consultant reduces short‑term market exposure.
- Inadequate power factor after migration: performing correction before or in parallel with migration avoids additional charges. For installations with variable loads or high harmonic content, automatic banks or those with reactors tend to be more suitable than fixed banks.
- Choosing a supplier without own generation: contracting a supplier that relies solely on third‑party purchases can represent a higher supply risk. Serena Energia operates as a generator and marketer and maintains a robust renewable energy backing.
- Underestimated migration timeline: the regulatory process takes 6 months. Starting the process early increases the chance of c
Synthesis and Practical Next Steps
The most effective sequence for Group A companies, in medium and high voltage, starts with an energy audit, followed by power factor correction and the fight against phantom consumption, which require low investment and have quick returns, and culminates in migration to the free energy market, where the contracted fixed price and certified renewable energy amplify and sustain the gains.
The recommended internal next steps form a logical sequence that connects diagnosis, efficiency, and migration.
- Gather the last 12 electricity bills and identify excess reactive energy charges, as these charges indicate immediate opportunities for power factor correction.
- With the bills in hand, request an energy audit to map the largest consumers and quantify the reduction potential before any significant investment.
- In parallel, assess eligibility for the free energy market, as simply being in Group A suffices, and verify whether migration can be combined with efficiency improvements.
- Finally, request a feasibility study from Serena Energia, which consolidates the audit and bill data to project total savings and the migration timeline.
Receive a personalized savings study for your company with the Serena Energia team.
Frequently Asked Questions (FAQ)
Can my Group A company migrate to the free energy market even without a minimum consumption?
Yes. As explained earlier, since January 2024 there is no mandatory minimum consumption. The company only needs to belong to Group A, with a medium or high voltage connection. Serena Energia conducts the eligibility analysis at no cost to the interested company.
How long does the migration take and what changes in the operation?
The process takes the 6 regulatory months mentioned earlier, counted from the notification to the distributor. During this period, Serena Energia handles the bureaucratic steps, including registration with the CCEE (Electric Energy Commercialization Chamber) and the installation of measurement equipment, at no additional cost to the client. As noted, physical delivery remains with the local distributor, and the operation experiences no interruptions.
What is the I‑REC and how does it serve sustainability reporting?
The I‑REC, short for International Renewable Energy Certificate, is a traceable digital certificate that proves that 1 MWh of energy was generated by a renewable source and injected into the grid. When contracting energy with Serena Energia, the company can obtain I‑RECs proportional to its consumption. These certificates are globally recognized and allow an auditable declaration that the company's electricity consumption is 100 % renewable, helping meet investor requirements, supply‑chain expectations, and public Scope 2 emission‑reduction targets.
How does power factor correction reduce the energy bill for Group A?
Group A companies with a power factor below the minimum limit receive excess reactive energy charges on their bill, identified as UFER, FER, EREX, DREX, or UFDR. Installing a capacitor bank raises the power factor to the appropriate level and reduces these charges. The investment typically pays for itself within a few months, and the benefits also include reduced conductor losses and extended lifespan of electrical equipment.
What are the risks of contracting energy in the free market and how does Serena Energia mitigate them?
The main operational risk is consuming outside the contracted range, which exposes the company to the short‑term market. Serena Energia provides continuous consumption monitoring and a dedicated consultant to track performance and advise adjustments. Supply risk remains low, as the local distributor is legally obliged to continue delivering electricity, and Serena Energia, as a generator with its own renewable energy backing, guarantees the contracted volume. All regulatory complexity with the CCEE (Electric Energy Commercialization Chamber) is managed by Serena Energia, without any additional client involvement.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *
