Strategies to save without cuts on the electricity bill

Written by: André Lima, Growth, Serena Energia
Main lessons from this article
-
The energy bill for Group A combines fixed demand and variable consumption, which makes budget forecasting uncertain and subject to ANEEL's annual adjustments and tariff flags.
-
Group A companies can reduce the bill by reviewing contracted demand, shifting loads off‑peak, and correcting power factor, but these actions remain limited by the captive market structure.
-
Migration to the free energy market allows negotiating price, term, and volume in a 3‑ to 5‑year bilateral contract, which eliminates tariff‑flag charges on the contracted energy portion.
-
The migration process involves 7 steps, from eligibility verification to continuous monitoring, and Serena Energia conducts all phases for clients under its management.
-
In addition to savings and predictability, Serena Energia offers 100% renewable energy with I‑RECs and active management. Talk to a consultant and use the electricity bill as a strategic lever.
1. How to read the bill to identify cost origins
The energy bill of a Group A company comprises two major charge blocks. The first is the contracted demand, a fixed amount charged regardless of consumption, which pays for capacity reservation on the grid. The second is consumption, divided between peak and off‑peak hours, on which the energy tariff, sector charges, taxes, and, when applicable, the tariff‑flag surcharge are applied.
Tariff flags work as an addition on each 100 kWh consumed. The green flag generates no additional charge. The yellow flag and the red flags at level 1 and level 2 add increasing amounts to the bill, defined periodically by ANEEL based on the status of hydroelectric reservoirs. For the CFO, this means that the same consumption level can generate very different bills from month to month, due to climatic factors beyond the company's control.
In addition to the flags, contracted demand requires constant attention. A company that contracts demand above what it actually uses pays for idle capacity. A company that exceeds the contracted demand pays an overage penalty. Identifying the break‑even point between these two extremes is the first step of any energy diagnosis and opens the way for subsequent optimization actions.
2. Optimization tactics that work for Group A companies
Some measures within the captive market reduce the bill without altering operations and prepare the ground for migration.
-
Review contracted demand, using the consumption history of the last 12 months to reduce idle capacity reservation.
-
Shift high‑consumption loads off‑peak, which reduces the cost of energy consumed during the most expensive period.
-
Correct power factor, to avoid charges for excess reactive energy, which appears as a separate line item on the bill.
-
Monitor monthly consumption, to identify seasonality and peaks that guide contractual and operational adjustments.
These actions generate savings but remain limited by the captive market tariff structure. Migration to the free energy market addresses the root problem, which is the price of energy itself, negotiated and fixed in contract, without tariff‑flag incidence on that contracted portion.
3. Complete step‑by‑step migration (7 steps)
Step 1: verify eligibility
The first step is to confirm whether the company is in Group A, with medium or high voltage supply. There is no minimum consumption required; simply belonging to Group A is enough. Serena Energia performs this analysis at no cost to the interested company.
Step 2: analyze consumption profile
The next step is to map monthly consumption in kWh over the last 12 months. This analysis identifies seasonality, demand peaks, and usage patterns by time of day. These data guide the choice of contract type and size the potential savings in the free energy market.
Step 3: choose a reliable retailer
Choosing a retailer with its own generation and solid track record reduces risks and simplifies management. Serena Energia is among the largest wind and solar generators created in the Americas and offers full support throughout the migration and management process.

Step 4: register the company with CCEE (Electric Energy Commercialization Chamber)
Registration with the CCEE (Electric Energy Commercialization Chamber) is mandatory to participate in the free energy market. This process involves technical, legal, and financial documentation. Serena Energia takes on this step entirely, from document preparation to registration completion.
Step 5: negotiate the energy contract
The bilateral contract defines price, term, volume, and energy source. Long‑term contracts, typically 5 years, lock in the energy cost and eliminate tariff‑flag incidence on that contracted portion. Competition among suppliers in the free energy market tends to result in more competitive prices than those in the regulated market.
Step 6: implement the measurement system
Hourly measurement is mandatory in the free energy market and allows more precise consumption monitoring. Serena Energia is responsible for specifying and installing compatible measurement equipment, as well as integration with monitoring systems.
Step 7: monitor and adjust consumption
After migration, monthly performance tracking shows the comparison between costs in the captive market and the free energy market and reveals new efficiency opportunities. Serena Energia provides a digital dashboard with monthly savings, consolidated savings, comparison between captive and free markets, consumption forecast and actual consumption, plus continuous consulting support.
4. What changes and what doesn’t in the physical delivery of energy
Migration to the free energy market changes the commercial relationship but keeps the same physical infrastructure. The local distributor remains responsible for electricity delivery, network maintenance, and supply quality. The wires, poles, and transformers serving the plant or office remain the same.
The main change is the commercial source of the energy. Instead of buying from the distributor at regulated tariffs, the company purchases from a generator or retailer of its choice, at a negotiated price. The distributor remains on the bill, charging for the use of the distribution network, the so‑called wire portion, while the energy portion is contracted in the free energy market.
For the operations manager, this means total production continuity. There is no supply interruption during migration, no changes to plant equipment, and no change in voltage or delivered energy quality.
5. How does Serena Energia conduct the entire process?
Serena Energia acts as an end‑to‑end energy manager for clients under its management and assumes all steps of the migration process and continuous management in the free energy market. This work covers the entire energy management cycle.
-
Feasibility analysis, based on the company's bills, with savings projection and definition of the best contracting model.
-
Conducting the bureaucratic process, from notification to the distributor to registration with CCEE (Electric Energy Commercialization Chamber).
-
Installation of measurement equipment, compatible with the free energy market and integrated with the monitoring system.
-
Representation of the company before CCEE (Electric Energy Commercialization Chamber) in the retail model, including sector obligations, financial settlements, and data submission.
-
Payment to the distributor, which reduces the risk of disconnection due to financial issues and simplifies the payment flow for the company.
-
Continuous monitoring, via digital dashboard and dedicated consultant, with adjustment recommendations and periodic reports.
Managed migration, energy consulting, and energy management are offered at no additional cost exclusively for clients under Serena Energia's management. With over 17 years of history and activity in wind and solar energy, the company combines operational and financial solidity aligned with the demands of financial and operations managers.

6. Budget predictability with 3‑ to 5‑year contracts
In the captive market, energy cost undergoes ANEEL's annual adjustment and monthly variation due to tariff flags. For the controller or CFO, any energy budget for the next year carries a significant margin of uncertainty.
In the free energy market, the price of the energy portion is defined in the bilateral contract before supply begins. Typically 5‑year contracts allow the company to know how much it will pay for energy over the entire contracted period, regardless of reservoir conditions or activated tariff flags.
This predictability directly impacts financial planning. The energy line ceases to be a risk variable in the budget and becomes a known expense, which can be accurately incorporated into the P&L and long‑term forecasts.
Contracts provide a consumption flexibility range, usually between 5% and 10% of the contracted volume. Variations within this range are absorbed without penalty. Serena Energia offers active management to reduce exposure outside this range, monitoring consumption and guiding adjustments when necessary.
7. Sustainability Bonus via I‑RECs and Carbon Credits
The energy supplied by Serena Energia in the free energy market comes from wind sources, with a 100% renewable origin defined in the contract. For companies with ESG goals, this procurement represents a direct solution for Scope 2 emissions, linked to electricity consumption.

For each MWh consumed, Serena Energia can issue an I‑REC (International Renewable Energy Certificate), a traceable digital certificate recognized globally that proves the consumed energy was generated by a clean source. The I‑REC is the standard instrument to declare 100% renewable consumption in sustainability reports and to meet ESG targets before investors, customers and regulators.
For companies that wish to neutralize other emission sources, Serena Energia also offers carbon credits from certified projects. Since 2017, the company has avoided the emission of more than 2.14 million tonnes of CO₂.
Clients such as Cargill and Bayer have already documented results of this partnership:
“The price of renewable sources is much more competitive compared to conventional sources. And this sustainability issue also cannot be reversed.” (Hamul Freitas, Strategic Sourcing Consult at Cargill)
“The agreement with Serena is another important initiative we are implementing to achieve our sustainability goals, aligned with the United Nations Sustainable Development Goals.” (Rogério Andrade, Vice‑President of Product Supply at Bayer)
“The prices have always been extremely competitive. There is also the sustainability and service aspect, which we already knew, and the trust. These were differentiators for us at the time of renewal.” (Guilherme Lopes Sobral, New Business at Casa Santa Luzia)
Frequently Asked Questions
What is, in practice, the free energy market?
In the free energy market, the company chooses from whom to buy energy and negotiates price, term, volume and source directly with the supplier. The physical quality of delivery remains the same, as the local distributor continues to be responsible for the wires, poles and network stability. The difference is that the company is no longer required to purchase energy from the distributor at regulated tariffs and instead contracts with a generator or marketer of its choice, such as Serena Energia.
Can my company migrate to the free energy market?
Any company connected at medium or high voltage, the so‑called Group A, can migrate to the free energy market. There is no minimum consumption required. If the company does not fall under Group A, there may be the option of load sharing with other units. Serena Energia conducts the eligibility analysis at no cost.
Is migration risky? Can the company be left without power?
Migration is a commercial and contractual process. The local distributor is legally obliged to continue providing the energy delivery service and to maintain the quality and stability of the grid. There is no risk of supply interruption during or after migration. The only change is the contracted energy supplier.
How long does the migration process take?
The regulatory process takes 6 months, counted from the notification to the distributor. Serena Energia conducts all stages of this process and keeps the client informed about progress at each phase. Savings begin on the first invoice after migration is completed. Therefore, the sooner the company starts the process, the sooner it will begin to save.
What happens if the company consumes more or less energy than contracted?
Contracts provide consumption flexibility, usually between 5% and 10% of the contracted volume. Variations within this range are absorbed without penalty. If consumption falls outside this range, the difference is settled in the short‑term market. Serena Energia offers active management to reduce this exposure, monitoring consumption and guiding adjustments when necessary.
What is the I‑REC and why is it important for the company?
The I‑REC (International Renewable Energy Certificate) is a digital certificate that auditable proves that 1 MWh of energy was generated by a renewable source and injected into the grid. By acquiring I‑RECs together with the energy, the company can declare that its electricity consumption is 100% renewable, which is essential for sustainability reports and for meeting ESG targets before investors, customers and regulators.
Do I need to install renewable energy panels to get clean energy at a discount?
No. Serena Energia generates energy in its large‑scale, high‑efficiency wind farms, and the local distributor delivers this energy to the company. There is no cost for installing own generation equipment. The company contracts the energy digitally or with the support of specialized consultants and receives renewable origin certification through I‑RECs.
When does the company start seeing savings on the bill?
Savings appear on the first invoice after migration is completed, which takes 6 months due to regulatory requirements. Serena Energia conducts all stages of this process and keeps the client informed about the status at each phase.
Conclusion
The electricity bill is still, for most Group A companies, the last major operating expense without structural treatment. Other cost lines have already undergone negotiation rounds, contract revisions or cuts. Energy has remained a sensitive point mainly due to the perceived complexity of migrating to the free energy market.
Serena Energia reduces this complexity. With more than 17 years of history in wind and solar energy, the company conducts the entire migration process for clients under its management, from feasibility analysis to registration with the CCEE (Electric Energy Commercialization Chamber), from installation of measurement equipment to continuous regulatory representation. The result is a reduction of the electricity bill, cost predictability for 3 to 5 years, and 100% renewable energy certification, without altering operations, without supply interruption and without infrastructure investment.
Energy is one of the last costs a company can reduce without cutting activities. With Serena Energia, this cost becomes a strategic advantage for business growth.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *