SERENA
Back to Blog
All articles • 24/06/2026

How to reduce your company's fixed expenses: a practical guide

How to reduce your company's fixed expenses: a practical guide

Written by: André Lima, Growth, Serena Energia

Key lessons from this article

  • Mapping fixed expenses by cost center and applying Pareto analysis allows prioritizing high‑impact actions without compromising operations.
  • Renegotiating recurring contracts and eliminating under‑utilized services converts fixed costs into leaner expenses aligned with actual usage.
  • Automating repetitive administrative processes reduces allocated labor cost and frees teams for strategic activities.
  • Moving to the free energy market makes energy cost more predictable and strengthens budget control and ESG traceability.
  • To implement these strategies with specialized support, contact Serena Energia.

1. Diagnosis by cost center

The starting point of any fixed‑expense reduction program is to map spending by cost center. Without granular visibility into where money is spent, cut decisions tend to be arbitrary and ineffective. The Pareto analysis identifies the biggest cost generators by focusing on the 20% of factors responsible for 80% of results, enabling high‑impact reduction prioritization. In manufacturing, raw materials usually lead, followed by labor, indirect costs and energy, creating a practical hierarchy to guide prioritization.

The diagnosis should include a comparison between contracted demand and actually used demand, the identification of contracts with automatic adjustment clauses, and the mapping of paid services with no proven usage. Comparing contracted versus used demand reveals whether the company pays for idle capacity. In parallel, identifying contracts with automatic adjustments exposes cost lines that grow without review. Finally, mapping paid services with no proven usage completes the survey and creates an objective basis for the next steps.

Talk to one of our consultants and discover how Serena Energia can support the diagnosis of your energy consumption profile.

2. Renegotiation of recurring contracts

Long‑term contracts with suppliers of inputs, logistics, technology and facilities tend to accumulate outdated conditions compared with the current market. Systematically renegotiating, with external benchmarking and total cost of ownership (TCO) analysis, often reveals room for adjustments without changing suppliers. TCO quantifies the full lifecycle cost of a product or service, including direct and indirect costs, and guides more precise decisions.

Energy contracts in the regulated market deserve special attention in this context, because they follow tariff adjustments defined by ANEEL. Companies in the regulated market absorb these adjustments without negotiation power. In addition to renegotiating existing contracts, the next fixed‑expense reduction strategy involves reducing labor needs in repetitive processes through automation.

3. Process automation

Automating processes helps reduce fixed expenses over time. The value‑stream mapping visualizes the flow of information, materials and resources along the delivery chain of a product or service and reveals waste that allows cost reduction in processes and infrastructure without harming operations. Manual repetitive processes in areas such as accounts payable, financial reconciliation and supplier management are priority candidates for automation.

Automation reduces the variable labor cost allocated to administrative tasks and lowers errors that generate rework and contractual penalties. The impact on fixed expenses occurs when automation enables team reallocation and absorbs demand growth without expanding headcount.

4. Elimination of under‑utilized contracts

Eliminating under‑utilized contracts reduces expenses without reducing operational capacity. Software tools, corporate licenses, data services and communication platforms tend to accumulate over time in medium and large organizations. The cost optimization, as defined by the IBM Institute for Business Value, differs from traditional cuts by preserving and, when possible, improving the quality and value delivered by the company. Removing under‑utilized contracts applies this principle directly, because it reduces expense without reducing capacity.

The process requires an up‑to‑date inventory of all active contracts, cross‑referenced with actual usage data from the last 12 months. This cross‑check reveals which contracts are under‑utilized. Contracts with usage below a threshold defined by management should then be cancelled, consolidated or renegotiated for smaller volumes. The four previous strategies apply to multiple cost lines. The next strategy focuses on a single fixed expense that, for Group A companies, usually represents a significant part of the budget: electricity.

5. Migration to the free energy market

Migrating to the free energy market usually generates a relevant recurring impact for Group A companies, which consume at medium and high voltage. In the regulated market, tariffs are set by ANEEL and follow annual adjustments and tariff flags that increase energy costs during periods of water scarcity. In the free energy market, the company negotiates price, term and volume directly with a supplier, making the energy expense more predictable over the contract term.

Aerial view of a vast solar plant with long rows of photovoltaic panels capturing the sunset light.
Using large‑scale solar plants allows capturing energy with maximum efficiency, optimizing credits that drastically reduce partner companies' fixed costs.

The physical delivery of electricity does not change, because the local distributor remains responsible for the wires and supply quality. What changes is from whom the company purchases the energy. The table below summarizes the main structural differences between the two models and highlights the criteria that most impact the budget and ESG traceability.

Comparative table: regulated market vs. free energy market

Criterion Regulated market Free energy market Serena Energia differential
Price structure Tariff defined by ANEEL, with annual adjustments and tariff flags Price negotiated in a long‑term bilateral contract Typically 3‑ to 5‑year contracts with price agreed in advance
Budget predictability Low, because adjustments and flags impact the budget without prior notice High, because the cost of contracted energy remains stable regardless of flags Digital dashboard tracking monthly savings and actual consumption
ESG traceability No renewable source certification Possible by choosing a renewable supplier Issuance of I‑RECs for each MWh consumed, traceable from the source

7 practical steps to migrate to the free energy market in 2026

Step 1: verify eligibility

The first step is to confirm that the company belongs to Group A, with supply at medium or high voltage. No minimum consumption is required, just being in this voltage range.

Step 2: analyze consumption profile

The second step is to map monthly consumption in kWh, identify seasonality and demand peaks. This analysis guides the choice of contract type.

Step 3: choose a supplier with own generation

Choosing a supplier with its own generation increases supply solidity, because it reduces dependence on third‑party purchases. Serena Energia is among the largest wind and solar generators in the Americas, with over 17 years of history and clients such as Heineken, Cargill and Eurofarma.

Landscape of a renewable energy park at sunset, showing large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the Free Market supply.

Step 4: register the company with CCEE (Electric Energy Commercialization Chamber)

Registering the company with CCEE (Electric Energy Commercialization Chamber) is mandatory to participate in the free energy market. Serena Energia handles the entire process, at no additional cost to the client.

Step 5: negotiate and sign the contract

The fifth step is to define price, term and volume. Retail‑model contracts from Serena Energia do not require the client to manage risks directly in CCEE (Electric Energy Commercialization Chamber).

Step 6: implement the measurement system

Hourly measurement is mandatory in the free energy market. Serena Energia is responsible for installing the equipment, at no additional cost to the client.

Silhouette of several wind turbines aligned along the coast during a colorful sunset, with reflections on the water.
Exploiting natural resources, such as coastal winds, is essential to maintain the scale and sustainability required in the Free Energy Market.

Step 7: monitor and adjust

After migration, Serena Energia represents the company before CCEE (Electric Energy Commercialization Chamber) and provides a digital dashboard with monthly savings, actual consumption and a comparison between regulated and free energy markets. A dedicated consultant monitors the contract and supports adjustments when needed.

Talk to one of our consultants and start the managed migration process to the free energy market at no additional cost.

6. Zero‑based budgeting

Applying zero‑based budgeting helps review recurring fixed expenses that persist out of inertia. The zero‑based budgeting requires each expense to be re‑evaluated and justified from zero each budgeting cycle, allocating resources only to activities that generate the most value.

The practical application involves questioning each cost line with the question: “If it didn’t exist, would the company hire today, under current conditions?”. Lines that do not pass this filter are candidates for elimination or renegotiation. The activity-based costing complements this approach by identifying the actual cost of products and services based on the specific activities required to produce them. Applying zero‑based budgeting and activity‑based costing generates targeted reductions. Sustaining these results over time requires the final strategy: systematic monitoring.

7. Monthly Monitoring

Monitoring cost centers monthly maintains expense reductions over time. Tracking with defined goals and responsible parties differentiates successful programs from ad‑hoc initiatives.

For the energy line, monitoring includes comparing the cost per contracted MWh with what would be paid in the regulated market, tracking actual consumption versus contracted, and periodically reviewing whether the demand profile justifies contractual adjustments. The following plan organizes the seven strategies into a 30‑day schedule, with priority actions, owners, and deliverables for each week.

30‑Day Plan to Implement the Strategies

Week Priority Actions Owner Deliverable
Week 1 Map all fixed expenses by cost center, collect energy invoices from the last 12 months, verify eligibility for the free energy market (Group A) Controller / Finance Spreadsheet of fixed expenses classified by impact
Week 2 Apply Pareto analysis to identify the three largest cost lines, initiate contact with energy supplier for feasibility study, list recurring contracts with expiration dates Finance Director / Operations Ranking of reduction opportunities with impact estimate
Week 3 Receive and analyze migration proposal to the free energy market, start renegotiation of the two largest recurring contracts, eliminate contracts with demonstrably low usage Finance Director / Legal Energy proposal evaluated, contracts renegotiated or cancelled
Week 4 Sign energy contract in the free energy market, define monthly monitoring KPIs, present zero‑based budgeting plan for the next cycle Finance Director / CEO Contract signed, monitoring dashboard active, ZBB proposal approved

Frequently Asked Questions about Migration to the Free Energy Market

Is my company eligible to migrate to the free energy market?

Any company connected at medium or high voltage, classified as Group A, can migrate to the free energy market. There is no minimum consumption required. Serena Energia conducts the eligibility analysis at no cost, evaluating the company's invoices and consumption profile to confirm feasibility and project expected results.

How long does the migration process take?

The regulatory process takes up to six months, a timeframe determined by the prior notice the distributor requires to terminate the current contract. During this period, Serena Energia handles all bureaucratic steps, such as registration with CCEE (Electric Energy Commercialization Chamber), measurement system adjustment, and notification to the distributor, at no additional cost to the client. The sooner the company starts, the earlier it begins operating in the free energy market.

What happens if my company consumes outside the contracted volume?

Contracts in the free energy market provide a flexibility band for consumption variations. In this model, the client does not purchase a fixed volume of energy, and the monthly billing is calculated based on the contract‑agreed price multiplied by the consumption realized during the period. This simplifies management and reduces exposure to short‑term market adjustments.

What is the I‑REC and what is its relevance for ESG reporting?

The I‑REC (International Renewable Energy Certificate) is a global certificate that audibly proves that 1 MWh of energy was generated from a renewable source and injected into the grid. For each MWh consumed, Serena Energia can issue a corresponding I‑REC. This document is one of the main tools to zero Scope 2 emissions in sustainability reports and meets the requirements of investors, customers, and regulators. Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂.

Does migration to the free energy market pose a risk of supply interruption?

No. Migration is a commercial and contractual process. As explained earlier, the local distributor remains responsible for physical delivery. The only change is the supplier from whom the company purchases the energy. Serena Energia has its own generation backing to cover the contracted consumption, without relying exclusively on third‑party purchases.

Talk to one of our consultants and receive a personalized feasibility study for your company with no obligation.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *