SERENA
Back to Blog
All articles • 03/06/2026

Financial decision tools for SMEs in the free market

Financial decision tools for SMEs in the free market

Written by: André Lima, Growth, Serena Energia

Key lessons from this article

  • Controlling energy cost requires applying well-known financial tools, such as cash flow, income statement (P&L) and scenario analysis, to the decision to migrate to the free energy market.
  • Completing the migration process is feasible for Group A companies and typically takes 6 to 12 months when a specialized partner leads the steps.
  • Comparing scenarios with and without migration allows quantifying savings and increasing budget predictability for up to 5 years.
  • Conducting monthly monitoring of results and continuously reviewing the budget reduces the weight of energy as an uncertainty factor.
  • To turn your company's energy cost into a competitive advantage, talk to a Serena Energia consultant.

Prerequisites

Starting the migration process requires a basic mastery of reading energy bills, cash flow and income statement. The finance, operations and facilities areas need to work in a coordinated manner.

The essential documents are the 12 most recent electricity bills, the current contract with the distributor, and the monthly consumption data in kWh. With this set, the company can assess eligibility and project scenarios more accurately.

Having a partner that manages the entire migration process reduces the need for internal specialization in electric sector regulation. Serena Energia conducts each step at no additional cost for clients under its management, from feasibility analysis to representation before the CCEE (Electric Energy Commercialization Chamber).

With these prerequisites met, the company can follow the process in five steps and structure the decision in a financially and operationally consistent way.

Overview of the process in 5 steps

The migration decision process is organized into five sequential stages, each with defined inputs, owners, and advancement criteria:

Step 1: current financial diagnosis, with mapping of consumption profile and energy impact on the budget.

Step 2: scenario analysis with and without migration, with building comparative cash flow projections.

Step 3: energy solution selection, with choosing the supplier, contract modality and term.

Step 4: managed migration execution, with conducting the regulatory and technical process.

Step 5: continuous monitoring and adjustment, with results monitoring and budget review.

Request a personalized feasibility study for your company.

Step by step: the 5 financial decision steps with energy

1. Current financial diagnosis

Objective: understand the real weight of energy in the budget and identify consumption patterns.

Actions: consolidate the 12 most recent bills to calculate the average monthly consumption in kWh. With this base, identify seasonality and demand peaks that affect the budget. Finally, record the total energy cost in the income statement of the last 12 months to measure the impact of this expense.

Owners: controller or financial manager, with facilities support.

Dependencies: access to the billing system and physical or digital invoices.

Risks: working with incomplete data or invoices that have reading errors, which distort the consumption average.

Note: verify if the company is in Group A, which includes consumers served at medium or high voltage. This is the requirement for access to the free energy market.

2. Scenario analysis with and without migration

Objective: quantify the financial impact of migration on the cash flow projected for the next 36 to 60 months.

Actions: build two scenarios in the cash flow model, one maintaining the current cost in the captive market, with estimated tariff adjustments, and another with the fixed price negotiated in the free energy market. Then, calculate the accumulated difference period by period and stress the model with consumption variations of plus or minus 10%.

Criterion Captive market Free energy market
Price formation Tariff regulated by ANEEL, subject to annual adjustments and tariff flags Price negotiated in a bilateral contract, usually fixed for 3 to 5 years
Budget predictability Low, because tariff flags change the cost monthly High, because the price is contracted in advance
Supplier choice No choice, the supplier is the local distributor The company chooses the supplier and negotiates terms
Renewable origin certification Not available as standard Available via I-RECs issued by the supplier

Owners: controller or financial director.

Dependencies: completion of step 1 and access to a formal supplier proposal.

Risks: using tariff adjustment assumptions that underestimate or overestimate the future cost in the captive market.

Note: lack of confidence in projected numbers is one of the main factors that stall migration decisions in SMEs. Working with a partner with a proven track record reduces this uncertainty.

Document checklist for this step:

  • 12 energy bills from the last 12 months
  • Current contract with the distributor
  • Monthly consumption history in kWh
  • Updated cash flow model
  • Formal supplier proposal in the free energy market

Request a comparative projection prepared by Serena Energia to support this analysis.

3. Energy solution selection

Objective: select the supplier, contract modality, retail or wholesale, and term that best fit the company's financial and operational profile.

Actions: request formal proposals, compare price, term, contractual flexibility and supplier solidity, verify if the supplier has its own renewable energy generation and assess the availability of I-RECs for ESG goals.

Owners: financial director, with involvement of operations and, when applicable, the sustainability manager.

Dependencies: scenario analysis completed in step 2, which guides the choice.

Risks: choosing a supplier without its own generation increases dependence on third parties and may compromise supply security.

Note: in the retail model, the company does not need to manage contracted volume relative to consumption. Billing considers the actual consumption multiplied by the agreed price. Serena Energia primarily operates in this model for SMEs.

Landscape of a renewable energy park at sunset, showing large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the Free Market supply.

4. Managed migration execution

Objective: complete the regulatory and technical process without impact to operations.

Actions: sign the contract with the supplier, start the notification process to the distributor, adapt the metering system, complete registration with the CCEE (Electric Energy Commercialization Chamber) and wait the regulatory period of 6 months for the start of supply in the free energy market.

Owners: the supplier manages the process, and the facilities area monitors the installation of metering equipment.

Dependencies: signed contract and complete technical and legal documentation.

Risks: delays due to incomplete documentation or starting the process without sufficient lead time.

Note: Serena Energia fully assumes the migration process, including installation of metering equipment. Physical delivery of energy remains the responsibility of the local distributor, maintaining the supply standard.

Start the migration process with Serena Energia's support, which has been operating for over 17 years in the renewable energy sector.

5. Continuous monitoring and adjustment

Objective: monitor financial and operational results after migration and treat energy as a managed variable in the budgeting cycle.

Actions: compare monthly the energy cost in the free energy market with the projected cost in the captive market, update the cash flow with actual values, review the annual budget based on the contracted fixed price and monitor the savings dashboard provided by the supplier.

Owners: controller, with support from Serena Energia's dedicated consultant.

Dependencies: access to the monitoring dashboard and monthly energy and distribution invoices.

Risks: not monitoring actual consumption versus projected can cause billing surprises.

Note: Serena Energia provides a dashboard with monthly savings, consolidated savings, comparison between captive and free energy markets, consumption forecast and actual consumption. Each client has a dedicated consultant.

Common mistakes and how to fix them

Frequent mistakes:

  • Underestimate the migration timeline and lose months of savings by not starting the process on time.
  • Not involving operations and facilities in the analysis, which creates internal resistance during execution.
  • Ignoring contractual flexibility when comparing proposals and focusing only on the unit price of energy.
  • Not monitoring actual consumption after migration and missing the opportunity to adjust the budget with real data.

How to fix:

  • Start the analysis and contracting process at least 8 months ahead of the desired start date in the free energy market.
  • Include operations and facilities from the diagnosis stage to ensure alignment on consumption and demand.
  • Evaluate consumption flexibility clauses and contractual revision conditions before signing.
  • Establish a monthly cadence for reviewing the monitoring dashboard with the supplier's consultant.

Results verification

Measuring the success of the migration to the free energy market requires tracking objective and measurable indicators. The main ones are the reduction of the unit energy cost in R$/MWh compared to the period in the captive market, the increase in budget predictability, measured by the deviation between projected and actual cost, and administrative simplification, with regulatory management centralized with the supplier.

The recommended cadence is to conduct a monthly review of the monitoring dashboard data and a quarterly review of the impact on the income statement (P&L) and cash flow. In each annual planning cycle, energy cost should be entered as a predictable variable, not as a risk line.

Build a financial monitoring model integrated with your energy management with the support of Serena Energia.

Advanced options

Consolidating the consumption of multiple consumer units into a single contract can simplify management and improve negotiated terms. This structure is especially relevant for expanding SMEs or those operating in more than one state.

Achieving public sustainability targets may require contracting I-RECs (International Renewable Energy Certificates) from the supplier, which allows you to declare that energy consumption is 100% renewable. This certificate has global recognition and is essential for ESG reporting and meeting Scope 2 targets. Since 2017, Serena Energia has prevented the emission of more than 2.14 million tonnes of CO₂.

Aerial view of a vast solar plant with long rows of photovoltaic panels capturing the light of the sunset.
The use of large‑scale solar plants allows energy capture with maximum efficiency, optimizing credits that drastically reduce the fixed costs of partner companies.

In long‑term financial planning, the fixed price negotiated in the free energy market allows treating energy cost as a stable variable in 3‑ to 5‑year projection models. This stability improves the quality of liquidity analyses and the reliability of multi‑year budgets. In Brazil, the energy management systems market grows 12.1% per year from 2026 to 2033, reflecting the increasing integration between energy management and corporate financial planning.

A single white wind turbine stands out amid a dense layer of fog or clouds, illuminated by the soft light of the sunset.
Advanced wind technology enables Serena Energia to capture constant winds at high altitudes, guaranteeing a clean, stable, and efficient energy source for your business.

Frequently asked questions

Does my company need a minimum energy consumption to migrate to the free energy market?

There is no minimum consumption. The requirement is that the company belongs to Group A, with medium or high voltage service, as explained in the diagnostic stage. Serena Energia conducts the eligibility analysis for free.

How long does the migration process take?

The regulatory process takes 6 months, counted from the notification to the distributor. Therefore, the sooner the company starts the process, the sooner it will have cost predictability for energy. Serena Energia handles all stages for clients under its management.

Is there a risk of the company losing power during or after the migration?

There is no such risk. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity, using the same network of wires and poles. The only change is the supplier that sells the electricity to the company.

How does the migration impact cash flow in the first months?

After migration, the company receives two invoices: one for energy from the supplier, such as Serena Energia, and one for distribution from the local distributor. Serena Energia centralizes the management of these obligations, and the client receives a single invoice for payment. Savings tend to appear from the first invoice after the contract starts.

What are I-RECs and when does it make sense to contract them?

I-RECs, International Renewable Energy Certificates, are certificates that audibly prove that a certain volume of energy was generated from a renewable source and injected into the grid. For each MWh consumed, Serena Energia can issue a corresponding I‑REC. These certificates are the main tool to zero Scope 2 emissions in sustainability reports and have global recognition by investors, regulators, and supply chains.

Conclusion

Treating energy as a manageable financial variable, rather than an inevitable fixed cost, elevates the quality of budgeting for any Group A SME. The tools that controllers and CFOs already use, such as cash flow, P&L, and scenario analysis, gain accuracy when energy ceases to be an unpredictable line and becomes a fixed price contracted in advance.

Serena Energia, among the largest wind and solar power generators created in the Americas, offers managed migration to the free energy market at no additional cost, assuming the regulatory and technical complexity of the process. The result is greater budget predictability and 100% renewable energy use, with auditable certification.

Talk to a Serena Energia consultant and take the first step to direct energy spending toward your business growth.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *