How to map and reduce costs of my company: practical guide

How to map and reduce costs of my company: practical guide

Written by: André Lima, Growth, Serena Energia

Main lessons from this article

  • After optimizing payroll, logistics and inputs, electricity usually remains one of the largest and most difficult operating expenses for Group A companies.

  • A structured five-stage process allows mapping costs, prioritizing opportunities, and reducing OPEX systematically within up to 12 months.

  • Materiality analysis and category diagnosis show that energy tends to be the last relevant savings frontier after addressing other line items.

  • Migration to the free energy market creates budget predictability and reduces costs by replacing regulated tariffs with pre‑negotiated contracts.

  • With Serena Energia, your company gets managed migration, 100% renewable energy and full support, with service by specialized consultants.

Prerequisites and initial conditions

Cost mapping starts with organizing internal information and resources.

Documents and data: invoices from the last 12 months from all relevant suppliers, including electricity bills with details of contracted demand and actual consumption, monthly income statements, active contracts with service and input suppliers, and consumption reports by cost center.

Systems: an up‑to‑date ERP with expense classification by nature and cost center, and spreadsheets or BI tools for data consolidation and visualization.

Involved teams: finance (controller or senior analyst), operations (plant manager or facilities), procurement and, when applicable, ESG. Alignment among these areas ensures that the mapping reflects operational reality and not just accounting records.

Technical constraints to consider: contracts with termination penalties in force limit short‑term renegotiation flexibility. The contracted demand with the local distributor defines the fixed component of the current bill. The monthly consumption profile allows projecting potential savings in the free energy market. Together, these three pieces of information guide feasibility assessment and the optimal migration timing.

Process overview

The operational cost mapping and reduction process follows five macro stages, each with a specific objective and clear dependencies on the previous one.

Stage 1: inventory and classification. Identify and categorize all operational expenses by nature (fixed, variable, semi‑variable) and by cost center.

Stage 2: materiality analysis. Identify which line items represent the greatest weight in total OPEX and where there is the highest reduction potential without operational impact.

Stage 3: category diagnosis. Deepen the analysis in priority categories, compare market benchmarks, and identify specific inefficiencies.

Stage 4: action plan and prioritization. Define concrete initiatives, owners, timelines, and measurable targets for each category.

Stage 5: energy as the final frontier. After exhausting opportunities in other categories, structure the migration to the free energy market as the remaining highest‑impact lever.

The stages are sequential, but analyses of stages 2 and 3 can occur in parallel for distinct categories, reducing total process time. Stage 5, detailed below, focuses on migration to the free energy market, which is usually the highest‑impact lever after addressing payroll, inputs, logistics and maintenance. Talk to one of our consultants and assess whether your company is ready for this step.

Step‑by‑step guide

Stage 1: expense inventory and classification

Objective: build a complete and structured view of all operational costs.

Actions: export from the ERP all expenses from the last 12 months, classify each item as fixed (independent of production volume), variable (proportional to production or revenue) or semi‑variable (has a fixed and a variable component) and associate each expense with a cost center and an internal owner.

Internal owner: controller or senior financial analyst, with validation from area managers.

Note: expenses entered in aggregate in the ERP need to be broken down. Electricity bills, for example, contain distinct components such as demand, consumption and charges, which must be recorded separately to allow precise analysis.

  • Stage 1 checklist:

  • All expenses from the last 12 months exported and reviewed

  • Fixed, variable and semi‑variable classification completed

  • Cost‑center association performed

  • Internal owner identified for each category

Stage 2: materiality analysis and prioritization

Objective: identify the categories that carry the greatest weight in OPEX and where reduction yields the biggest impact on results.

Actions: rank categories by annual absolute value, calculate each one's percentage of total OPEX, apply Pareto logic to identify categories accounting for the majority of spend, and assess for each priority category the level of internal control (high, medium, low) and reduction potential without compromising operations.

Internal owner: controller, with participation from the operations manager to validate operational impact of any cuts.

Risk: categories with high weight but low internal control, such as tax charges or logistics costs set by long‑term contracts, should be flagged for future contractual review, not for immediate action.

Talk to one of our consultants and check whether electricity already appears among the highest‑materiality categories in your company.

Stage 3: category diagnosis

Objective: deepen the analysis in priority categories to identify specific inefficiencies and concrete opportunities.

Typical category actions:

  • Payroll and third‑party labor: review hour allocation, absenteeism, service contracts and role overlap.

  • Inputs and raw materials: analyze process losses, purchasing conditions, inventory volume and alternative suppliers.

  • Logistics and freight: map routes, load utilization and transport contracts.

  • Maintenance: compare preventive and corrective maintenance and evaluate service contracts.

  • Electricity: verify contracted and measured demand, peak consumption hours, low‑efficiency equipment and the current tariff classification. At this stage, comparing the cost in the regulated market with conditions available in the free energy market becomes relevant.

Internal owner: manager of the area responsible for each category, with financial support for quantification.

Stage 4: action plan and initiative prioritization

Objective: turn the diagnosis into concrete initiatives with defined goals, timelines and owners.

Actions: for each identified opportunity, record the action description, estimated savings in absolute value, implementation timeline, owner and dependencies. Prioritize initiatives with higher impact and lower execution complexity and set a monthly monitoring cadence.

Note: initiatives that depend on contract renegotiation require advance planning. Migration to the free energy market requires this type of preparation due to regulatory timelines, detailed in the FAQ section. The sooner the decision is made, the sooner the savings begin.

Stage 5: energy as the final frontier

After implementing the prioritized initiatives in the previous stages, many Group A companies realize that electricity remains the highest‑materiality line item still not addressed strategically. This stage focuses on that final frontier.

Objective: structure the migration to the free energy market as the last and most relevant OPEX reduction lever available to Group A companies.

Context: after optimizing the other categories, electricity often remains one of the most significant and least addressed cost lines. In the regulated market, Group A companies pay rates set by ANEEL, subject to annual adjustments and tariff flags that raise costs during water scarcity periods. In the free energy market, the company can negotiate contracts with a pre‑agreed price, reducing uncertainty and increasing budget predictability.

Aerial view of a vast solar plant with long rows of photovoltaic panels capturing the sunset light.
The use of large‑scale solar farms allows capturing energy with maximum efficiency, optimizing credits that drastically reduce partner companies' fixed costs.

Actions: request a feasibility analysis based on the last 12 months of invoices, assess consumption profile and contracted demand, compare current cost with conditions available in the free energy market, and start the migration process with an experienced retailer.

Serena Energia, one of the largest wind and solar power generators in the Americas, offers managed migration to the free energy market at no additional cost to the client, handling the entire bureaucratic process with CCEE (Electric

The main cost center and ignoring allocations and shared expenses among units generates a distorted view of the materiality of each category.

Incorrect classification of semi‑variable costs: treating electricity as a purely variable cost ignores the fixed component of contracted demand, which is charged regardless of actual consumption.

Lack of alignment between areas: cost‑reduction initiatives defined by finance without validation from operations tend to generate resistance or a negative impact on production.

Postponement of the energy decision: waiting for an “ideal” moment to migrate to the free‑energy market prolongs the period of paying regulated tariffs. Each month of delay represents an opportunity cost.

Insufficient documentation: not recording the assumptions and data used in the diagnosis makes periodic review and accountability to management difficult.

How to fix

For incomplete mapping, cross‑reference ERP data with bank statements and physical supplier invoices. Any discrepancy indicates expenses not recorded correctly.

For the incorrect classification, break down the electricity invoice separating demand (the fixed component) and consumption (the variable component) before any analysis.

For the lack of alignment, involve the operations manager from stage 1, not only at the final validation.

For postponement, start the feasibility analysis for the free‑energy market in parallel with the diagnosis of the other categories, without waiting for the entire process to finish.

Validation checklist:

  • All units and cost centers included in the mapping

  • Fixed and variable components of electricity recorded separately

  • Operations manager validated the cost‑reduction initiatives

  • Feasibility analysis for the free‑energy market requested

  • Assumptions and data sources documented

Results verification and metrics

Results verification occurs through operational and financial indicators monitored monthly.

Financial KPIs: variation of total OPEX compared to the previous period, on a monthly basis and accumulated over 12 months; electricity cost per unit produced or per square meter of operational area; and the difference between regulated‑market electricity cost and free‑market electricity cost after migration.

Operational KPIs: measured demand vs. contracted demand, off‑peak consumption as a proportion of total consumption, and number of reduction initiatives implemented versus planned.

Sustainability KPIs: volume of I‑RECs issued corresponding to renewable‑energy consumption and tons of Scope 2 CO₂ emissions offset.

Landscape of a renewable‑energy park at sunset, showing large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean‑energy generation, ensuring greater stability and efficiency for the Free‑Energy Market supply.

Review frequency: monthly monitoring for financial and operational KPIs, quarterly strategic review of initiatives and action‑plan updates, and annual evaluation of contract renegotiation and new opportunities.

Tools: Serena Energia provides a digital dashboard showing monthly bill savings, consolidated savings, comparison between regulated and free markets, consumption forecast, and actual consumption. This level of transparency reduces the need for parallel manual controls for the energy line item.

Talk to one of our consultants and see how Serena Energia’s dashboard simplifies energy‑cost monitoring.

Advanced options and next steps

Companies with multiple sites: the described process can be replicated per site and then consolidated. This approach allows identification of which plants concentrate the greatest energy inefficiency and prioritizes migration by impact order. In the free‑energy market, the company can contract energy for all eligible Group A sites centrally, simplifying management.

Companies with sustainability targets: migrating to the free‑energy market with 100 % renewable supply, combined with I‑REC issuance and carbon credits from Serena Energia, integrates cost‑reduction agendas with ESG agendas. This combination enables auditable reporting of Scope 2 emission reductions for investors, customers, and sustainability reports.

Silhouette of several wind turbines aligned along the coast during a colorful sunset, with reflections on the water.
Exploiting natural resources, such as coastal winds, is essential to maintain the scale and sustainability required in the Free‑Energy Market.

Related topics for deeper study: management of contracted demand and metering system adaptation, industrial‑process energy‑efficiency strategies, and structuring decarbonization targets aligned with the UN Sustainable Development Goals.

FAQ

Talk to one of our consultants if your question is not answered below.

What is Group A and does my company qualify?

Group A gathers consumers connected at medium and high voltage. There is no minimum consumption to participate in the free‑energy market; the company only needs to be in this voltage range. Serena Energia performs a free eligibility analysis based on the last months’ electricity bills.

How long does the migration process to the free‑energy market take?

The regulatory process takes six months, counted from formalization with the local distributor. During this period, Serena Energia handles all bureaucratic steps, such as registration with CCEE (Electricity Commercialization Chamber), metering system adaptation, and distributor notification, at no additional cost to the client. Therefore, the sooner the decision is made, the sooner the company starts operating in the free‑energy market.

Who inside the company needs to be involved in the migration?

The process mainly involves finance—for contractual approval and feasibility analysis—and the operations or facilities manager—to oversee metering system adaptation. Serena Energia assumes technical and regulatory coordination, reducing the burden on internal teams.

Does migration pose any risk to operational continuity?

Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity to the company. The only change is the supplier with whom the company negotiates price, term, and volume. Serena Energia installs the required metering equipment at no extra cost and oversees the entire process to ensure no operational impact.

How does renewable energy connect to the cost‑reduction agenda?

In the free‑energy market with Serena Energia, the company reduces costs while advancing sustainability simultaneously. The supplied energy is 100 % renewable, with I‑RECs issued to certify the clean origin of each MWh consumed. This structure allows the company to offset its Scope 2 emissions in sustainability reports without additional cost or process beyond the energy contract.

Closing

Upon completing the process described in this guide, the company gains a structured view of all operational costs, with initiatives prioritized by impact and complexity and an action plan with owners and defined deadlines. Electricity, which is often the last category to be tackled strategically, stops being an opaque expense and becomes managed with the same discipline applied to the other OPEX line items.

For Group A companies, connected at medium and high voltage, migration to the free‑energy market represents the highest‑impact lever remaining after optimizing other categories. With pre‑agreed price contracts, the company reduces exposure to tariff flags and gains long‑term budget predictability. With Serena Energia, this process is managed end‑to‑end, at no extra cost, with 100 % renewable supply certified by I‑RECs and carbon credits.

With a history of over 17 years and a client base that includes companies such as Heineken, Cargill, and Bayer, Serena Energia offers the solidity and experience a CFO or controller seeks for decisions of this magnitude.

Talk to one of our consultants and take the next step to make the electricity bill a strategic element in your company’s cost management.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.