How to improve operational efficiency to increase profit

Written by: André Lima, Growth, Serena Energia
Main lessons from this article
-
Operational efficiency in energy starts with a detailed analysis of the consumption profile and confirmation of eligibility in Group A.
-
Migration to the free energy market offers price predictability and cost‑reduction potential compared to the regulated market.
-
Choosing a retailer with its own generation, such as Serena Energia, reduces supply risks and ensures renewable backing.
-
The regulatory process takes up to six months, so starting early anticipates savings and reduces the risk of delay.
-
To turn these insights into concrete results for your company, contact Serena Energia.
What operational efficiency is
Operational efficiency is a company's ability to produce more results with fewer resources, reducing waste and controlling every cost line without compromising quality or continuity. In the energy context, this means paying less for each unit of energy consumed and having predictability over that cost over time. The free energy market makes these goals feasible for Group A companies.

1. Prerequisites and initial conditions
The migration or energy‑optimization process requires some basic prerequisites. The first three deal with technical eligibility and data availability. The last two indicate whether the organization is ready to execute and monitor the process:
-
The company is connected at medium or high voltage (Group A). There is no minimum consumption required; classification in Group A is the only eligibility requirement.
-
There is a history of energy invoices from the last 12 months available for consumption‑profile analysis.
-
There is internal alignment among the financial, operational and, when applicable, sustainability areas.
-
A designated person is assigned to monitor the migration process with the retailer.
-
Leadership understands that the regulatory process takes up to 6 months and that early planning determines when the savings start.
2. Overview of the process in 5 macro steps
-
Diagnosis and eligibility: invoice analysis and confirmation of classification in Group A mentioned in the prerequisites.
-
Retailer selection and contracting: partner selection, price negotiation and contract signing.
-
Migration process: notification to the distributor, registration with CCEE (Electric Energy Commercialization Chamber) and adaptation of the measurement system.
-
Entry into the free energy market: after the 6‑month regulatory period, the company starts operating in the new environment and begins recording savings.
-
Continuous monitoring: monthly tracking of consumption, billing and sustainability results.
3. Detailed step‑by‑step guide
Step 1 — Consumption diagnosis and eligibility
Goal: understand the company's energy profile and confirm migration feasibility.
Actions: gather the last 12 months of invoices, map seasonality and demand peaks, confirm classification in Group A already mentioned in the prerequisites.
Responsible parties: operations or facilities manager, with support from the finance area.
Risks and attention points: incomplete or inconsistent invoices can distort the savings projection. Serena Energia performs this eligibility analysis at no cost.
Step 2 — Retailer selection and contract closing
Goal: select a partner with financial solidity, own generation and full‑process management capability.
Actions: compare proposals, evaluate retailer credentials, verify if it has its own renewable energy generation, analyze contractual clauses and term, which is usually 5 years.
Responsible parties: CFO or controller, with legal validation.
Risks and attention points: retailers without own generation depend on third parties to ensure supply, which can pose risk in scarcity or high‑demand scenarios. Therefore, choosing a partner with generation backing, like Serena Energia, which is among the largest wind and solar generators in the Americas, reduces this exposure. Remember that physical energy delivery remains the responsibility of the local distributor; migration is a commercial and contractual process, without interruption risk.

To understand the practical differences between the two contracting environments, the table below compares the main decision criteria:
|
Criterion |
Regulated market (captive) |
Free energy market (with Serena Energia) |
|---|---|---|
|
Supplier choice |
No, local distributor mandatory |
Yes, company chooses the retailer |
|
Price predictability |
Low, subject to tariff flags and annual adjustments |
High, price agreed in long‑term contract |
|
Saving potential |
Limited, regulated tariff by ANEEL |
Potential reduction compared to the regulated market |
|
Renewable energy certification |
Not available |
I‑RECs issued by Serena Energia |
|
Process management |
Not applicable |
Full management by Serena Energia, at no additional cost |
See how much your company can save: simulate your discount with Serena Energia.
Step 3 — Migration process
Goal: execute all bureaucratic and technical steps to enable the company in the free energy market.
Actions: send formal notification to the distributor, register the company with CCEE (Electric Energy Commercialization Chamber), install the measurement system compatible with the free energy market.
Responsible parties: Serena Energia fully assumes this process, including installation of measurement equipment, at no additional cost to the client.
Risks and attention points: the 6‑month regulatory deadline is fixed. Starting the process as early as possible is the way to anticipate the start of savings.
Step 4 — Entry into the free energy market and start of savings
Goal: activate the new contract and begin recording cost reductions on the bill.
Actions: receive the two invoices, one from the energy retailer and one from the local distributor, monitor Serena Energia’s savings dashboard, verify the discount on the first invoice after migration.
Responsible parties: controller or financial manager, with support from Serena Energia’s dedicated consultant.
Risks and attention points: actual consumption must be monitored against the contracted volume. Contracts provide consumption flexibility, and deviations outside this range are settled in the short‑term market. Serena Energia offers active management to reduce this exposure.
Step 5 — Continuous monitoring and optimization
Goal: maintain energy efficiency and identify additional cost‑reduction opportunities.
Actions: monthly review of Serena Energia’s dashboard with realized savings, forecasted vs. actual consumption and comparison between regulated and free markets, periodic contract review.
Responsible parties: operations manager and controller, with support from Serena Energia’s consultant.
Risks and attention points:
5. Verification of results and monitoring metrics
Structured monitoring of the metrics consolidates operational efficiency and shows the financial impact of the migration. After entering the free energy market, monitor the following indicators monthly:
-
Monthly bill savings: difference between the cost that would be paid in the regulated market and the actual cost in the free energy market.
-
Consolidated savings: total accumulated since the start of the contract, visible on the Serena Energia dashboard.
-
Actual consumption versus forecast: control of deviations relative to the contracted volume.
-
CO₂ emissions avoided: volume of tonnes of CO₂ not emitted by using wind energy, based on the issued I‑RECs.
-
Bill comparison: month‑by‑month evolution of the cost per MWh in the free energy market versus what would be charged in the regulated market.
The Serena Energia digital dashboard centralizes all this information and allows the controller or financial manager to track results without relying on manual reports.

Want to deepen the savings analysis for your company? Talk to the Serena Energia team.
6. Advanced options and next steps
Companies that have already migrated to the free energy market with Serena Energia can expand financial and sustainability results through three complementary avenues.
-
I‑RECs (International Renewable Energy Certificates): for each MWh consumed, Serena Energia can issue a traceable certificate that proves the renewable origin of the energy. This document has global recognition and is the main tool to zero Scope 2 emissions in sustainability reports.
-
Carbon credits: for companies with emission‑neutralization targets beyond Scope 2, Serena Energia offers access to carbon credits from certified projects, complementing the ESG strategy.
-
Continuous optimization: as the company’s consumption profile evolves, Serena Energia’s dedicated consultant can recommend contractual adjustments to preserve efficiency and savings over time.
Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂, a result that reflects the scale of the operation and the commitment to renewable energy.

Frequently Asked Questions
Does my company need a minimum consumption to migrate to the free energy market?
No. As explained in the prerequisites, the only requirement is classification in Group A, i.e., being a medium‑ or high‑voltage consumer. Serena Energia conducts the eligibility analysis at no cost.
Does migrating to the free energy market pose any risk of supply interruption?
No. Migration is an exclusively commercial and contractual process. As described in the retailer‑selection step, the local distributor remains responsible for the physical delivery of electricity, the wires and the network infrastructure. The only change is the commercial energy supplier. Serena Energia, among the largest wind and solar generators in the Americas, has its own generation capacity to meet the contracted consumption.
How long does the migration process take and who is responsible for each step?
The regulatory process takes up to 6 months, the period defined by the prior notice required to terminate the contract with the distributor. Serena Energia assumes all steps entirely, including notification to the distributor, registration with CCEE (Electric Energy Commercialization Chamber), installation of measurement equipment and ongoing management after migration, at no additional cost to the client under Serena Energia’s management.
How does migrating to the free energy market contribute to the company’s ESG goals?
The energy supplied by Serena Energia is 100 % wind. For each MWh consumed, the company can request the issuance of I‑RECs, internationally recognized certificates that audibly prove the energy’s renewable origin. These certificates are the standard tool to zero Scope 2 emissions in sustainability reports and to meet the demands of investors, customers and boards. Serena Energia also offers carbon credits for neutralizing other emission sources.
What happens if the company’s actual consumption differs from the contracted volume?
Free‑market contracts provide a consumption‑flexibility band. Deviations outside this band are settled in the short‑term market. Serena Energia offers active risk management, monitors consumption monthly and advises adjustments when needed, so the company maintains the financial predictability that motivated the migration.
Summary and final call to action
Improving operational efficiency to increase company profit hinges on controlling the most relevant and less predictable costs. For Group A companies, medium‑ and high‑voltage consumers, migrating to the free energy market with Serena Energia is a direct path to turning the electricity bill into a predictable cost line, with potential expense reduction and 100 % certified renewable energy. With over 17 years of history, full‑process management at no extra cost and a digital dashboard for result tracking, Serena Energia is the partner financial directors, controllers and operations managers can choose to channel energy toward business growth.
Ready to turn your electricity bill into a competitive advantage? Simulate your discount now

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *
