Main lessons from this article

  • Group A companies can significantly reduce energy costs by combining operational efficiency actions with migration to the free energy market.

  • A detailed consumption diagnosis of the last 12 months is the starting point to identify waste and plan effective actions.

  • Operational actions without capital investment, such as HVAC adjustments and preventive maintenance, can generate savings of 15% to 30% in the first year.

  • Migrating to the free energy market brings budget predictability and can reduce costs by up to 20%, in addition to eliminating the impact of tariff flags from the regulated market.

  • To implement these strategies with specialized support, contact Serena Energia.

Prerequisites to get started

Gathering some basic data speeds up the diagnosis and feasibility analysis in the free energy market.

  • Energy bills from the last 12 months, with consumption in kWh and contracted demand in kW

  • Monthly consumption profile, identifying seasonality and demand peaks

  • Company registration data, such as CNPJ, address of consumer units, and tariff class

  • Confirmation that the company belongs to Group A, i.e., it is served at medium or high voltage by the local distributor

An important point about eligibility: there is no minimum consumption to migrate to the free energy market; the company only needs to be part of Group A. If there is doubt about this classification, Serena Energia performs this analysis at no cost.

Talk to one of our consultants and find out if your company can already migrate.

Overview of the process in 6 steps

The process combines short‑term actions that require no capital investment with a medium‑term strategic decision: migration to the free energy market. The six steps are:

  1. Current consumption diagnosis

  2. Operational efficiency actions without capex

  3. Financial assessment of cash‑flow impact

  4. Decision and contracting in the free energy market

  5. Managed migration

  6. Continuous monitoring and adjustments

Steps 1 to 3 can be executed in parallel with step 4, which speeds up the overall schedule. However, the migration, which corresponds to step 5, takes up to six months due to the regulatory deadline for terminating the contract with the distributor, and this period cannot be shortened. Therefore, the sooner the process starts, the sooner the company begins to save.

Simulate your discount with Serena Energia and see how much your company can save.

Step‑by‑step guide

Step 1: current consumption diagnosis

Goal: map where and when energy is consumed to identify waste.

Recommended actions:

  • Consolidate the last 12 months of bills into a spreadsheet with monthly consumption in kWh and recorded demand in kW

  • Identify the highest‑consumption equipment, such as HVAC systems, lighting, motors, and production equipment

  • Conduct a survey of equipment that runs outside operating hours

Typical internal owner: Facilities manager or Operations manager.

Risk: Working without complete historical data makes the diagnosis imprecise and reduces focus on the highest‑impact loads.

Step 2: operational efficiency actions without capex

Goal: reduce consumption before migration, amplifying the cash‑flow savings impact.

Operational changes in HVAC, lighting and production equipment can cut energy consumption by 15% to 30% in the first year without significant capital investment. The main levers are:

Typical internal owner: Facilities manager, supported by the maintenance team.

Want to combine operational efficiency with migration to the free energy market? Our team can help you structure this strategy.

Step 3: financial assessment of cash‑flow impact

Goal: translate consumption reductions into measurable financial impact.

The WBCSD recommends evaluating energy‑efficiency projects with the same financial metrics used for traditional investments: NPV, IRR and payback. To apply these metrics, you need to compare “with” and “without” scenarios, capturing both direct cost reductions and secondary effects such as lower exposure to tariff adjustments, strengthening operational cash flow in a predictable way.

Typical internal owner: Controller or Finance director.

Step 4: decision and contracting in the free energy market

Goal: contract an energy supplier with a pre‑agreed price, eliminating the impact of tariff flags.

In the free energy market, the company negotiates directly with a generator or retailer the price, term and volume of energy. The local distributor remains responsible for the physical delivery of electricity. The difference lies in who supplies the energy and how the price is formed.

Landscape of a renewable energy park at sunset, showing large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the Free Market supply.

Criterion

Regulated market (captive)

Free energy market with Serena Energia

Price formation

Defined by ANEEL, subject to tariff flags

Negotiated in a long‑term contract, typically 3 to 5 years

Budget predictability

Low, as adjustments and flags impact cost monthly

High, with a fixed price agreed in advance

Energy source

No renewable source definition

100% renewable, with issuance of I‑RECs

Process management

Automatic, no supplier choice

Managed by Serena Energia, no additional cost to the client

Potential savings

Zero reference

Up to 20% compared to the regulated market

Typical internal owner: Finance director or controller, with involvement of the Operations manager.

Step 5: managed migration

Goal: execute the migration process without operational impact.

Serena Energia conducts all steps, such as notifying the distributor, registering with CCEE (Electric Energy Commercialization Chamber), adapting the metering system and configuring the contract. The six‑month period mentioned earlier is set by regulation and cannot be accelerated. Installation of metering equipment is the responsibility of Serena Energia, at no extra cost to the client.

Risk to avoid: starting the process without organized bills and registration data, which can delay registration with CCEE (Electric Energy Commercialization Chamber).

Step 6: continuous monitoring and adjustments

Goal: verify results and sustain cost reductions throughout the contract.

After migration, Serena Energia provides a digital dashboard showing monthly bill savings, accumulated consolidated savings, comparison between captive and free energy markets, consumption forecast and actual consumption. A dedicated consultant monitors the contract and is available for questions and performance reviews.

Common mistakes to avoid

During the planning phase:

  • Starting the analysis without the last 12 months of bills, which makes the diagnosis incomplete

  • Not involving the Operations manager in the migration decision, which can generate internal resistance during execution

  • Postponing the migration decision without considering that the six‑month regulatory deadline only starts counting after the contract is formalized

During the execution phase:

  • Neglecting preventive HVAC maintenance after migration, as poorly maintained equipment can consume up to 30% more energy compared to well‑maintained systems

calibrated

  • Not monitoring monthly consumption relative to the contracted volume, which exposes the company to settlements in the short‑term market

  • Failing to request the corresponding I‑RECs for consumption, missing the opportunity to prove renewable energy use in ESG reports

  • How to verify the results?

    A simple monthly monitoring routine helps confirm the savings and adjust the contract when necessary. The verification of results should consider three indicators:

    1. Cost per kWh: compare the effective price paid in the free electricity market with what would be charged in the regulated market for the same period, taking into account the prevailing tariff flags

    2. Consolidated savings: track the total saved since the start of the contract, available on the Serena Energia dashboard

    3. Adherence to the contracted volume: check whether the actual consumption falls within the contractual flexibility range, usually between 5% and 10%, to avoid exposure to the short‑term market

    The recommended cadence is a monthly review conducted by the controller or Facilities manager, based on the dashboard data and the received invoice. Any significant deviation should be reported to the Serena Energia consultant for adjustment.

    Advanced options

    Multiple consumer units: companies with more than one unit in Group A can consolidate the energy management of all of them into a single contract with Serena Energia, which simplifies monitoring and can increase savings.

    I‑REC certificates: for each MWh consumed, Serena Energia can issue an I‑REC (International Renewable Energy Certificate), a traceable, globally recognized document that proves consumption of renewable‑source energy. This certificate is one of the main tools to zero Scope 2 emissions in sustainability reports.

    Aerial view of a vast solar plant with long rows of photovoltaic panels capturing the light of the sunset.
    The use of large‑scale solar plants allows capturing energy with maximum efficiency, optimizing the credits that drastically reduce the fixed costs of partner companies.

    Carbon credits: companies seeking to neutralize emissions beyond electricity consumption can access carbon credits from certified projects through Serena Energia, complementing the decarbonization strategy.

    Frequently asked questions

    Does my company need a minimum consumption to migrate to the free electricity market?

    No. As mentioned in the prerequisites, the only requirement is to belong to Group A, which includes companies served at medium or high voltage by the local distributor.

    Can the migration interrupt the power supply to my operation?

    No. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity and grid stability. The only change is the energy supplier.

    How long does the migration process take?

    The regulatory process takes up to six months, counted from the contract formalization. Serena Energia handles all steps at no additional cost to the client. Therefore, the sooner the process starts, the sooner the company begins to save.

    What happens if my company consumes more or less energy than the contracted volume?

    Contracts provide a flexibility band, usually between 5% and 10% of the contracted volume. Consumption outside this band is settled in the short‑term market. Serena Energia offers active monitoring to reduce this exposure.

    How does Serena Energia prove that the supplied energy is renewable?

    Proof is provided through the issuance of I‑RECs (International Renewable Energy Certificates), traceable digital documents that show each MWh consumed was generated from wind sources. These certificates are globally accepted in sustainability reports and ESG audits.

    A single white wind turbine stands out amid a dense layer of fog or clouds, illuminated by the soft light of the sunset.
    Advanced wind technology enables Serena Energia to capture constant winds at high altitudes, guaranteeing a clean, stable, and efficient energy source for your business.

    Conclusion

    Combining operational efficiency actions with migration to the free electricity market reduces monthly outlay and increases long‑term budget predictability. For Group A companies operating at medium and high voltage, this path is already available with a managed process and no additional cost.

    Serena Energia, one of the largest wind and solar power generators created in the Americas, offers managed migration, energy consulting, continuous management, and renewable certification on a single platform. In this way, your company directs resources toward growth instead of paying more than necessary for electricity.

    Simulate your discount with Serena Energia and see how to reduce your company's energy cost.

    Redação Serena Energia

    André Lima

    We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

    Editor

    Leave a comment

    Your email address will not be published. Required fields are marked with *