SERENA
Back to Blog
All articles • 18/04/2026

How to migrate to the free energy market ACL in 7 steps

How to migrate to the free energy market ACL in 7 steps

Written by: André Lima, Growth, Serena Energia

Key takeaways from this article

  • Group A companies can migrate to the free energy market (ACL) in 2026 with no minimum consumption, saving up to 20% with fixed prices and no tariff flags.
  • The process involves 7 steps managed by Serena Energia for free, from eligibility verification to continuous monitoring via a digital dashboard.
  • Registration with CCEE (Electric Energy Commercialization Chamber), measurement adaptation and long‑term contracts are essential steps, with Serena handling all bureaucracy as part of the full management.
  • Common errors such as consumption underestimation are avoided with detailed analysis and active management, which enhances security and guarantees 100% renewable energy certified I‑REC.
  • Serena Energia is among the largest wind and solar power generators created in the Americas and offers complete and sustainable migration; start your free analysis to assess your company's savings potential.

Prerequisites and initial conditions for ACL migration

Before starting the migration process, your company needs to confirm technical eligibility and organize consumption information. These points define who can migrate and influence the contractual strategy and savings potential.

Your company must belong to Group A, which refers to companies served at medium or high voltage by the local distributor. This classification is the first eligibility filter, and since 2024 there is no minimum consumption required for migration.

After confirming eligibility, the next step is to gather the energy bills from the last 12 months for consumption profile analysis, including contracted demand data and consumption in kWh. These documents enable Serena Energia to perform a free feasibility analysis and project the potential savings in the free energy market.

It is also important to involve from the start the finance, operations or ESG teams, who will monitor the migration process. The duration of the process depends on the notice periods stipulated in the contract with the distributor, described in this ACL migration flow.

Overview of the migration process

Migration to the free energy market follows 7 main steps: eligibility verification, detailed consumption analysis, selection of the retailer, registration with CCEE (Electric Energy Commercialization Chamber), contract negotiation, measurement system adaptation, and continuous results monitoring.

Serena Energia takes full management of this process for clients who contract its energy supply services. This management includes everything from the initial feasibility analysis to representing the company at CCEE (Electric Energy Commercialization Chamber) and monthly monitoring of savings results.

Start your free feasibility analysis and learn the personalized schedule for your migration.

Below, each of these 7 steps is detailed to show what happens at each stage and how Serena Energia conducts the process.

Step by step: 7 steps to migrate to ACL in 2026

Step 1: Eligibility verification
The first step confirms whether your company belongs to Group A by analyzing energy bills. Serena Energia performs this verification for free and identifies load aggregation opportunities for companies with multiple units.

Step 2: Consumption profile analysis
The next step maps the monthly consumption in kWh and the contracted demand in detail. The analysis identifies seasonality and peaks that guide the contractual strategy, projects potential savings, and indicates the most suitable contract type.

Step 3: Choosing Serena Energia as the retailer
In this phase, Serena Energia presents a proposal based on its own renewable energy generation capacity, which contributes to stable prices and secure supply. As one of the largest renewable energy generators created in the Americas, the company offers relevant financial and operational solidity for long‑term contracts.

Landscape of a renewable energy park at sunset, showing large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the Free Market supply.

Step 4: Registration with CCEE (Electric Energy Commercialization Chamber)
Next, registration with CCEE (Electric Energy Commercialization Chamber) takes place. Serena Energia handles the submission of technical, legal, and financial documentation and uses its specialized expertise to complete this step as part of the previously mentioned full management.

Step 5: Contract negotiation and formalization
After registration, long‑term contracts are defined, typically between 3 and 5 years, with fixed prices that eliminate tariff flag charges. These contracts materialize the projected savings from the initial analysis and provide budget predictability for the company.

Step 6: Measurement system adaptation
With the contract signed, hourly measurement equipment compatible with the free energy market is installed. Serena Energia is responsible for installing the measurement equipment, included in the management service.

Step 7: Continuous monitoring and management
After entering the free energy market, Serena Energia conducts monthly monitoring via a digital dashboard. The dashboard compares captive market costs with free market energy costs, monitors actual consumption versus forecast, and calculates accumulated savings. The tool shows monthly bill savings, consolidated savings, bill breakdown comparing captive and free market energy, monthly consumption forecast, and consumption to date.

Side profile of a worker in a wind farm, with the sun in the background and multiple wind turbines stretching across the horizon.
The dedication of qualified field professionals is what ensures the efficiency and constant availability of clean energy that drives our clients' businesses.
Metric Regulated market ACL with Serena
Annual savings 0% Up to 20%
Predictability Low, with flags High, with fixed price

Common mistakes and troubleshooting

Knowing the most frequent mistakes helps avoid savings loss and migration delays. Below are three critical points that Serena Energia actively monitors.

Consumption underestimation: Many companies fail to project future consumption, which can expose them to the short‑term market. Serena Energia offers active consumption management, with monthly monitoring and contract adjustments when necessary.

Ignoring the 6‑month deadline: The migration process requires prior notice of the contract with the distributor. Companies that do not plan the schedule in advance miss migration windows and postpone savings. Continuous consumption monitoring also supports planning for this deadline.

Choosing a retailer without own generation: The selection of the energy partner directly influences supply security. Companies that rely solely on third parties for supply face higher operational risk. Serena Energia has its own renewable energy generation, which increases supply security.

Silhouette of several wind turbines aligned along the coast during a colorful sunset, with reflections on the water.
Exploiting natural resources, such as coastal winds, is essential to maintain the scale and sustainability needed in the Free Energy Market.

How long does it take to migrate to ACL?

The migration process to the free energy market takes up to 6 months. This period is mainly determined by the need for prior notice of the contract with the distributor. Serena Energia manages all stages of this schedule, from the initial documentation to the effective entry into the free energy market.

What are the risks and disadvantages of ACL?

The main risks involve consumption above the contracted amount, which is settled in the short‑term market, and dependence on the correct choice of retailer. Serena Energia reduces these risks with active consumption management and financial solidity built over more than 17 years of operation in the electricity sector.

Who can migrate to ACL?

Since January 2024, any Group A company can migrate to the free energy market, regardless of consumption level. Group A includes consumers served at voltage equal to or above 2.3 kV, which covers most industries, large retailers, and corporate buildings.

Companies with multiple units can use the load aggregation mechanism, summing consumption from different locations to enable migration. Serena Energia analyzes eligibility for free and identifies the most suitable strategies for each business profile.

Results verification and metrics

After migration, results monitoring confirms whether the projected savings are materializing. This monitoring is done through monthly comparison between the period's invoices in the regulated market and costs in the free energy market.

Serena Energia provides a digital dashboard that shows consolidated savings, consumption forecast versus actual consumption, and unit energy cost. The dashboard facilitates decision‑making and contract adjustments when necessary.

In addition to financial savings, companies that migrate with Serena Energia receive I‑REC certificates that verify 100% renewable energy consumption. These certificates contribute to corporate sustainability goals and ESG reporting.

Aerial view of a vast solar plant with long rows of photovoltaic panels capturing the sunset light.
The use of large‑scale solar plants allows capturing energy with maximum efficiency, optimizing the credits that drastically reduce
and the fixed costs of partner companies.

Discover the monitoring dashboard and the available sustainability metrics.

Advanced options and next steps

Companies with complex operations can adopt advanced strategies to expand the benefits of migration. Among these strategies are the management of multiple sites, the adjustment of contracted demand, and integrated energy efficiency projects.

Serena Energia offers specialized consulting to structure these initiatives and align energy supply with the company's growth and sustainability strategy.

Frequently Asked Questions

What is, in practice, the free energy market?

The free energy market allows your company to choose the electricity supplier and negotiate price, term, and contractual conditions. The local distributor remains responsible for the physical delivery of energy through the network of wires and poles, while the energy procurement can be done with companies such as Serena Energia, under more competitive commercial terms.

Is migration risky? Can I be left without power?

There is no risk of supply shortage, because migration is an exclusively commercial process. Your company only changes who supplies the contracted energy. The local distributor is legally obliged to continue delivering energy with the same quality and stability. Serena Energia guarantees supply based on its own generation capacity.

What happens if I consume more energy than I contracted?

Contracts provide a flexibility band for consumption variations. Consumption outside this band is settled in the short‑term market. Serena Energia performs active management to reduce this exposure, supports consumption forecasting, and adjusts contracts when necessary.

What is I‑REC and why is it important?

I‑REC is an international certificate that verifies each MWh consumed came from a renewable source. This certificate is essential for sustainability reporting and allows your company to declare 100% renewable consumption in an auditable way, zero Scope 2 emissions, and strengthen the ESG strategy.

Do I need to install equipment to have renewable energy?

It is not necessary to install your own generation. Serena Energia produces wind energy in its high‑efficiency parks and the distributor delivers this energy to your company through the existing electric grid. Your company begins to consume 100% certified renewable energy simply through the supply contract.

A single white wind turbine stands out amid a dense layer of fog or clouds, illuminated by the soft light of the sunset.
Advanced wind technology enables Serena Energia to capture constant winds at high altitudes, ensuring a clean, stable, and efficient energy source for your business.

Clarify your specific questions about migration to the free energy market.

Conclusion

Migration to the free energy market in 2026 represents a concrete opportunity to reduce operational costs, increase budget predictability, and advance sustainability goals. With Serena Energia's full management, your company can turn the projected savings into recurring results, without taking on additional operational or bureaucratic risks.

With the full market opening, Group A companies have access to more competitive conditions and can leverage the expertise of this own‑generation capacity to convert energy costs into long‑term competitive advantage.

Start your journey toward savings and sustainability in the free energy market today.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *