How to optimize energy consumption in an industrial plant

How to optimize energy consumption in an industrial plant

Written by: André Lima, Growth, Serena Energia

Key takeaways from this article

  • Industrial plants of Group A can reduce costs and achieve budget predictability by migrating from the captive market to the free energy market.

  • A detailed energy diagnosis with measured data from the last 12 months is essential to identify losses and prioritize internal efficiency actions.

  • Feasibility analysis and contracting in the free energy market eliminate the uncertainty of tariff flags and allow access to renewable energy with I-REC certification.

  • The migration process takes six months and requires coordination between Finance, Operations, and Legal, as well as adaptation of the measurement system.

  • To structure your complete energy efficiency and free energy market migration strategy, talk to a Serena Energia consultant.

Prerequisites

The migration process to the free energy market requires some technical, documentary, and organizational prerequisites.

  • Confirmation that the company belongs to Group A, with medium or high voltage supply, a requirement for access to the free energy market.

  • Energy bills from the last 12 months, with consumption details in kWh, contracted demand, and overage records.

  • Updated electrical plant of the facility, including load board and existing measurement system.

  • Involvement of Finance, Operations, and Legal areas, as the migration requires contractual approval and operational alignment.

  • Technical and legal documentation of the company for the registration process with CCEE (Electric Energy Commercialization Chamber).

  • Clarity on the seasonal consumption profile, especially when the plant operates in variable shifts or has concentrated demand peaks.

Process overview

Optimizing energy consumption in an industrial plant combines two complementary fronts: internal efficiency actions and migration to the free energy market. These fronts unfold into six macro steps. The first two reduce the plant's baseline consumption. Steps 3 and 4 address the contractual and regulatory migration to the free energy market. Steps 5 and 6 consolidate gains and open space for advanced opportunities.

Landscape of a renewable energy park at sunset, featuring large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the supply of the Free Market.
  1. Energy diagnosis and mapping of current consumption.

  2. Identification and prioritization of internal efficiency actions.

  3. Feasibility analysis and contracting in the free energy market.

  4. Execution of migration and adaptation of the measurement system.

  5. Continuous monitoring and adjustment of contracts and processes.

  6. Advancement to complementary options: renewable certification, carbon credits, and expansion to multiple units.

Receive a personalized analysis of the applicable steps for your plant with Serena Energia consultants.

Detailed step-by-step

1. Conduct the plant's energy diagnosis

Objective: understand where and how energy is consumed before making any decision.

The energy diagnosis maps the main consumption points, identifies losses, and generates recommendations prioritized by financial and operational impact. This detailed mapping also meets the energy review required by energy management system standards, which structure continuous monitoring within the organization. For the diagnosis to be reliable, it is essential to work with measured data. Without precise measurement, any savings estimate is inaccurate.

Internal responsibilities: Plant Manager, Facilities Manager.

Note: the calibration of electrical measurement instruments must follow traceable standards, such as those offered by laboratories accredited by Inmetro.

2. Prioritize internal efficiency actions

Objective: reduce baseline consumption before or in parallel with migration, to increase the total impact of the strategy.

The energy diagnosis guides the selection of the most profitable efficiency actions. The most common actions in industrial plants include reviewing contracted demand, replacing motors with high-efficiency models, optimizing compressed air systems, adjusting industrial lighting, and reviewing processes with higher specific energy consumption. To decide where to start, use the checklist below and prioritize actions that meet all criteria.

Prioritization checklist:

  • Does the item represent a significant consumption in the total plant?

  • Can the intervention be performed without production shutdown?

  • Is the investment payback period compatible with the financial planning?

  • Is a qualified supplier available?

Risk: implementing efficiency actions without measuring the result before and after prevents proving the benefit to management and ESG reports.

Integrate internal efficiency and free energy market into a single plan with Serena Energia's support.

3. Analyze feasibility and contract in the free energy market

Objective: project the real savings and formalize the contract with a reliable retailer.

The feasibility analysis uses the invoices from the last 12 months to calculate the potential savings in the free energy market. Serena Energia conducts this study at no cost. The contract in the retail model of the free energy market sets the energy price for a determined period, usually three to five years, and eliminates the uncertainty of tariff flags in the captive market. The table below summarizes the structural differences between the two models and shows how the free energy market expands control over price, supplier, and energy source.

Aerial view of a vast solar plant with long rows of photovoltaic panels capturing the sunset light.
The use of large-scale solar plants allows capturing energy with maximum efficiency, optimizing credits that drastically reduce fixed costs for partner companies.

Comparative table: captive market vs. free energy market

Criterion

Captive market

Free energy market (retail model)

Price definition

Regulated tariff, with annual adjustments and tariff flags

Negotiated price in bilateral contract, fixed for the agreed period

Supplier choice

Local distributor, no alternative

Company chooses the retailer, such as Serena Energia

Energy source

Grid mix, no source traceability

Renewable energy with I-REC certification available

Regulatory management

Distributor's responsibility

Managed by Serena Energia together with CCEE (Electric Energy Commercialization Chamber)

Note: in the free energy market, the local distributor remains responsible for the physical delivery of energy to the plant. Migration occurs at the commercial and contractual level, without impact on supply continuity.

4. Execute the migration and adapt the measurement system

Objective: complete the regulatory and technical process to operate in the free energy market.

The migration involves registering the company with CCEE (Electric Energy Commercialization Chamber), notifying the distributor, and installing the Billing Measurement System, which enables hourly consumption measurement. Serena Energia conducts all these steps and covers the installation of measurement equipment at no additional cost to the client.

Internal responsibilities: Plant Manager for physical access to the facility, Legal for signing documents, and Finance for contractual approval.

Timeline: the regulatory process takes six months, counted from the notification to the distributor. Early planning is decisive for the start of savings.

5. Monitor results and adjust continuously

Objective: verify the achieved savings, identify deviations, and sustain improvement throughout the contract.

After migration, Serena Energia provides a digital dashboard with monthly tracking of invoice savings, total consolidated savings, comparison between captive and free energy markets, consumption forecast, and actual consumption. A dedicated consultant remains available for questions and performance monitoring.

Common mistakes and solutions

Some mistakes recur in free energy market migration projects and can be avoided with structured planning.

Planning without measured data

Making contract decisions based on estimates without reliable measurement can result in inadequate contracted volume. The solution is to conduct the energy diagnosis before signing any contract and use at least 12 months of real consumption data.

Checklist: invoices from the last 12 months available? Hourly measurement installed or planned? Consumption seasonality mapped?

Underestimating timelines

The six-month timeline for migration is regulatory and cannot be shortened. Companies that start the process without considering this timeline lose months of savings. The solution is to start the feasibility analysis as early as possible.

Checklist: target date for start of savings defined? Process started with sufficient lead time? Internal areas aligned on the schedule?

Lack of alignment between areas

Migration to the free energy market involves Finance, Operations, and Legal. The absence of an internal responsible person coordinating the areas causes delays in document delivery and in the approval of co

Contracts.

Checklist: internal responsible designated? Legal involved from the start? Finance aligned on the two invoices, for energy and distribution, that will now exist?

Ignore the technical documentation

Registration with CCEE (Electric Energy Commercialization Chamber) requires specific technical, legal, and financial documentation. Incomplete documents delay the process. Serena Energia guides and conducts this stage in full.

How to verify the results?

Result monitoring should consider financial, operational, and sustainability dimensions.

  • Financial: comparison of cost per MWh before and after migration, accumulated monthly savings, achieved budget predictability.

  • Operational: actual consumption versus forecasted consumption, deviations from contracted volume, operation of the measurement system.

  • Sustainability: volume of I-RECs issued, Scope 2 emissions offset, progress toward declared ESG targets.

Indicator review should occur monthly, with an in‑depth analysis each quarter. Serena Energia’s dashboard centralizes this data in real time.

Structure the monitoring of results for your plant with support from Serena Energia consultants.

Advanced options

Plants with multiple consumer units can consolidate the free‑energy market strategy into a single contract or structure contracts per unit, according to each site’s consumption profile. Serena Energia operates throughout Brazil and can manage this complexity centrally.

Companies with public decarbonization targets can combine wind energy with I‑RECs and carbon credits to cover Scope 2 emissions and contribute to the neutralization of other sources. Since 2017, Serena Energia has prevented the emission of more than 2.14 million tonnes of CO₂.

Silhouette of several wind turbines lined up along the coast during a colorful sunset, with reflections on the water.
Exploiting natural resources, such as coastal winds, is essential to maintain the scale and sustainability required in the Free Energy Market.

Related topics for deeper study include contracted demand management, use of ISO 50001 as a continuous‑improvement framework, and ESG reporting strategies for institutional investors.

Frequently asked questions

Can my industrial plant migrate to the free energy market?

Yes, provided the company belongs to Group A, with medium or high‑voltage supply. There is no minimum consumption requirement. Serena Energia conducts the eligibility analysis at no cost.

How long does the migration to the free energy market take?

The regulatory process takes six months after notification to the distributor. Serena Energia handles all bureaucratic and technical steps with no additional cost to the client. Therefore, starting the process as early as possible is crucial to anticipate savings.

Can the migration cause an interruption in the plant’s power supply?

No. The migration occurs only on the commercial and contractual level. The local distributor remains responsible for the physical delivery of electricity to the plant, with no change in continuity or quality of supply. The only change is who the company purchases the electricity from.

What are the internal responsibilities during the migration process?

The Operations or Facilities area must enable physical access for the installation of the measurement system. Legal signs the contracts and regulatory documents. Finance approves the contract and prepares to receive two monthly invoices, one for energy from Serena Energia and one for distribution from the local distributor. Serena Energia centralizes and guides each step, reducing the burden on internal teams.

How does migrating to the free energy market contribute to the company’s ESG goals?

The energy contracted with Serena Energia comes from wind sources. For each MWh consumed, the company can obtain I‑RECs, internationally recognized certificates that verify renewable energy consumption and allow zeroing Scope 2 emissions in sustainability reports. Serena Energia also offers carbon credits to neutralize other emission sources.

A single white wind turbine stands out amid a dense layer of fog or clouds, illuminated by the soft light of sunset.
Advanced wind technology enables Serena Energia to capture steady high‑altitude winds, providing a clean, stable, and efficient energy source for your business.

Conclusion

Optimizing energy consumption in a Brazilian industrial plant in 2026 requires two simultaneous fronts: internal efficiency actions, supported by diagnosis and continuous monitoring, and migration to the free energy market, which replaces regulated tariffs with fixed‑price contracts and certified renewable energy. Combining these fronts delivers cost reduction, budget predictability, and concrete progress toward ESG targets.

Serena Energia, one of the largest wind and solar generators created in the Americas, with over 17 years of history, manages the entire migration process—from diagnosis to stabilized operation—at no additional cost to the client.

Start the feasibility analysis for your industrial plant with the Serena Energia team.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.