How to plan the budget for fixed expenses

Written by: André Lima, Growth, Serena Energia
Key lessons from this article
- Fixed expense budgeting requires rigorous categorization, use of contract-specific indices, and a monthly review cycle to maintain financial predictability.
- Electricity in the regulated market is unpredictable due to tariff flags, and classifying it solely as variable underestimates the fixed commitment of contracted demand.
- Contracts in the free energy market allow price to be set in advance, eliminate flag variations, and make the electricity bill a more reliable fixed expense.
- Group A companies can consolidate consumption from multiple units into a single contract and obtain I-REC certificates to prove 100% renewable consumption in ESG reports.
- To turn electricity into a more predictable fixed expense, talk to a Serena Energia consultant.
Prerequisites: data and involved areas
Fixed expense budgeting starts with complete and up-to-date data.
Gather:
- 12 months of invoices and statements for all fixed expense categories
- Current contracts with suppliers, landlords, and service providers
- Reference inflation indices, such as IPCA and IGP-M, for the projected period
- Access to the company's ERP or financial management system
- Historical electricity consumption with breakdown of contracted demand and actual consumption
The involved areas include finance and controlling, which consolidate and approve the budget, facilities and operations, which provide consumption data and utility contracts, and legal, which validates contractual adjustment clauses.
Overview of the process in 6 steps
Fixed expense budgeting follows six main steps.
The steps are: 1) expense identification and categorization, 2) historical analysis of the last 12 months, 3) application of inflation indices and contractual adjustments, 4) definition of budget caps per category, 5) building the monthly projection spreadsheet, and 6) implementation of the budgeted vs. actual control cycle. The following sections detail each step with actions, owners, and points of attention.
Step-by-step: how to develop the fixed expense budgeting
Step 1: identification and categorization of fixed expenses
Objective: map all expenses that do not fluctuate with production or sales volume.
Actions: extract from the ERP all entries from the last 12 months to form the analysis base. Then, classify each item into categories such as personnel, occupancy, utilities, insurance, technology, preventive maintenance, and outsourced services, to allow a more granular view. Finally, separate fixed expenses from variable and semi‑variable ones within each category, so the budget reflects the actual behavior of each line.
Owner: controlling, with facilities support for utilities.
Risks and points of attention: electricity is often incorrectly classified as fully variable. For Group A companies, the contracted demand with the local distributor generates a minimum monthly cost, even when consumption is lower. This component makes the expense partially fixed, and ignoring this aspect reduces budget accuracy.
| Category | Examples | Nature | Data source |
|---|---|---|---|
| Personnel | Salaries, charges, benefits | Fixed | HR / payroll |
| Occupancy | Rent, property tax, condominium | Fixed | Contracts |
| Utilities | Electricity, water, gas | Fixed/semi‑variable | Invoices |
| Technology | Software licenses, telecom | Fixed | Contracts |
| Insurance | Property, civil liability | Fixed | Policies |
Step 2: historical analysis of the last 12 months
Objective: identify seasonality, peaks, and deviations that need to be included in the projection.
Actions: calculate the monthly average and standard deviation for each category to understand typical behavior. Then, identify atypical months, such as periods with adjustments, fines, or extraordinary consumption, and record those events. Document the causes of deviations to guide corrective actions and avoid repetition.
Owner: controlling.
Risks and points of attention: for electricity in Group A, blue or green time‑seasonal tariffs apply higher prices during peak hours, usually between 5:30 pm and 8:30 pm. Ignoring this consumption pattern skews the historical average and harms the projection.
Step 3: application of inflation indices and contractual adjustments
Objective: project each category with the appropriate correction index and reduce the risk of under‑budgeting.
Actions: identify the index stipulated in each contract, such as IPCA, IGP‑M, or a sectoral index, and apply this index to the base value of the last month of the history. For contracts without a defined adjustment clause, use the IPCA projected by the Central Bank's Focus Bulletin as a conservative reference. Record the effective date of each adjustment to distribute the impact correctly over the 12 months.
Owner: finance and legal.
Risks and points of attention: electricity in the regulated market does not follow IPCA or IGP‑M. Adjustments occur by regulatory decision and incur additions from the green, yellow, red 1, and red 2 tariff flags, which vary according to reservoir levels. This mechanism makes projections based solely on generic inflation inaccurate for this category.
See how Serena Energia can reduce the electricity bill uncertainty in your fixed expense planning.
Steps 4 to 6: projection, categorization, and monthly control
Step 4: definition of budget caps per category
Objective: set spending limits that guide operational decisions throughout the year.
Actions: sum the inflation‑adjusted historical value of each category to obtain an initial cap. For categories with a high deviation history, include a contingency reserve proportional to the observed risk. Before consolidating the budget, validate the caps with the responsible areas to confirm they reflect contractual commitments and operational needs.
Owner: controlling and financial management.
Step 5: building the monthly projection spreadsheet
Objective: distribute the budget caps month by month, respecting the identified seasonality.
Actions: create a tab per category in the ERP or a spreadsheet and enter the projected value for each month, considering contractual adjustment dates. Include columns for budgeted amount, actual amount, and percentage variance. Set up alerts when actual exceeds a threshold, such as 5% above budget, to trigger immediate analysis.
| Month | Budgeted (R$) | Actual (R$) | Variance (%) |
|---|---|---|---|
Designing the electricity bill solely based on historical average, without considering the impact of tariff flags, creates a sense of control that does not hold up in practice. Migrating to the free electricity market and setting the price contractually is the structural solution for this risk.
How to verify planning resultsThe main effectiveness metric of budget planning is the percentage deviation between budgeted and actual by category. For fixed expenses with existing contracts, a deviation of up to about 5% is usually acceptable. Deviations above this level require root cause analysis and adjustment of projections for the following months. Monthly review works best with a dashboard that shows the accumulated budgeted amount for the year, accumulated actual amount, absolute and percentage deviation by category, and year‑end projection, or forecast. For companies with multiple units, the dashboard needs to allow consolidated and unit‑level views. Advanced options for companies with multiple units or sustainability goalsCompanies with several consumer units of Group A can consolidate energy consumption into a single contract in the free electricity market. This consolidation simplifies management and facilitates budget monitoring. Serena Energia conducts the eligibility analysis for each unit and structures the contract to cover the entire portfolio. ![]() For companies with public sustainability targets, Serena Energia issues I‑REC certificates for each MWh consumed. These certificates have global recognition and allow an auditable declaration that electricity consumption is 100% renewable, meeting the growing demands of investors, customers, and ESG regulatory bodies. Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂. ![]() Frequently asked questions about budget planning and migration to the free electricity marketCan any Group A company migrate to the free electricity market?Yes. Companies connected at medium or high voltage can migrate to the free electricity market, without a minimum consumption requirement. Serena Energia conducts the eligibility analysis free of charge before any decision. How long does the migration process take?The regulatory process takes about six months, the time needed to terminate the contract with the local distributor. Serena Energia conducts all steps with the CCEE (Electric Energy Commercialization Chamber) at no additional cost to the client. Starting the process early allows anticipating predictability in the energy budget. How does a contract in the free electricity market improve fixed expense planning?In the free electricity market, the price is agreed upon in advance between the company and the supplier, without influence from tariff flags. This model makes the electricity line comparable to expenses such as rent or software licenses, with greater predictability for the annual budget. Does migration to the free electricity market represent operational risk?No. The migration occurs in the commercial and contractual realm. The local distributor remains responsible for the physical delivery of electricity and grid stability. The company then purchases energy from a chosen supplier, such as Serena Energia, without interruption of physical supply. What are I‑REC certificates and how do they integrate into the budget?The I‑REC, International Renewable Energy Certificate, is a global certificate that verifies that 1 MWh of energy was generated from a renewable source and injected into the grid. Serena Energia issues these certificates for each MWh consumed by the client, allowing the consumption to be declared as 100% renewable in sustainability reports. From a budgeting perspective, I‑RECs are integrated into the energy contract, without the need for a separate budget line. Conclusion: gaining budget predictability with a repeatable processA well‑structured fixed‑expense budget planning combines rigorous categorization, projection with correct indices per contract, budget caps validated by responsible areas, and a monthly cycle of budget‑versus‑actual review. This set of practices makes the budget an active management tool, not just an annual document. Electricity, for Group A companies, is usually the item that most compromises the accuracy of this process when it remains in the regulated market. Migration to the free electricity market, with long‑term contracts and fixed price, reduces this uncertainty and allows treating energy as a more reliable fixed expense in the annual budget. Serena Energia, one of the largest wind and solar power generators created in the Americas, offers managed migration, continuous management with the CCEE (Electric Energy Commercialization Chamber) and supply of 100% renewable energy with I‑REC certification, at no additional cost for companies under its management. ![]() André LimaWe are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business. Editor Leave a commentYour email address will not be published. Required fields are marked with * |