How to do energy budget planning in Group A?

Written by: André Lima, Growth, Serena Energia
Main lessons from this article
-
Group A companies face budget unpredictability due to adjustments and tariff flags in the regulated market.
-
A structured five‑step budget planning allows defining clear and auditable targets for cost reduction.
-
Conducting consumption audits and identifying internal efficiencies are essential steps before any contractual renegotiation.
-
Migration to the free energy market reduces exposure to tariff variations and enables contracts with fixed prices for 3 to 5 years.
-
To structure an energy budget plan that reduces costs and increases predictability, talk to a Serena Energia consultant.
Overview of the 5‑step process
-
Consumption audit, map what the company consumes, when it consumes, and at what cost.
-
Definition of budget targets, set measurable financial and operational goals.
-
Identification of internal efficiencies, reduce waste before renegotiating contracts.
-
Migration to the free energy market, contract energy at a negotiated price and renewable source.
-
Continuous monitoring, track KPIs and adjust the plan periodically.
Prerequisites: required documents and data
Gathering the right documents speeds up planning and improves projection accuracy.
-
Energy bills from the last 12 to 24 months, with detailed consumption in kWh, contracted and recorded demand, and sector charges
-
Monthly consumption profile, with seasonality, demand peaks, and high‑load hours
-
Current tariff classification, such as sub‑group A1, A2, A3, A3a, A4 or AS, and billing modality
-
History of penalties for demand overrun or power factor out of standard
-
Involvement of finance, operations, and facilities areas from the start of the process
With this data in hand, the process becomes more agile. Even so, correctly interpreting these data—especially sizing contracted demand and identifying avoidable penalties—requires technical experience. Companies that have specialized support from this stage avoid rework and reduce total time to migration.
Step‑by‑step guide
Step 1: consumption audit and cost diagnosis
Goal: precisely understand the company's energy profile and identify where the budget is being consumed inefficiently.
Actions:
-
Consolidate the invoices from the last 24 months into a single spreadsheet, separating peak, off‑peak consumption and demand
-
Calculate the average cost per MWh actually paid, including all charges
-
Identify months with active tariff flags and quantify the accumulated financial impact
-
Map consumer units with the greatest weight on the consolidated invoice
Internal owners: controller or senior financial analyst, with support from the facilities manager.
Risks and attention points: incomplete invoices or those without detailed recorded demand compromise the analysis. Request the history directly from the distributor if necessary.
Step 2: definition of energy budget targets
Goal: turn the diagnosis into concrete financial targets, integrated into the annual budget and multi‑year planning.
Actions:
-
Set a target cost per MWh for the next 3 to 5 years
-
Define a monthly energy spending ceiling, with margin for operational consumption variations
-
Separate targets for unit cost reduction (price per MWh) from targets for absolute consumption reduction
-
Include a specific line in the budget for renewable energy certification when the company has ESG commitments
Internal owners: chief financial officer or CFO, with validation from the executive board.
Risks and attention points: targets based only on regulated‑market history tend to underestimate the savings potential available in the free energy market. Companies that migrated to the free energy market recorded significant electricity cost reductions, which serves as a reference to calibrate the targets.
Talk to one of our consultants to receive a feasibility study with a personalized savings projection for your company's consumption profile.
With the budget targets defined, the next step is to maximize the financial impact of any contractual change. This requires reducing internal waste before migrating, because the lower the baseline consumption, the greater the absolute savings captured in the free energy market.
Step 3: identification of internal efficiencies
Goal: reduce unnecessary consumption before renegotiating contracts, to amplify the financial impact of the migration.
Actions:
-
Review contracted demand versus actually recorded demand, as adjustments to this parameter can reduce fixed charges
-
Assess the power factor of the installations and correct any deviations
-
Identify equipment with consumption disproportionate to its productive use
-
Map peak demand hours and evaluate the possibility of load shifting
Internal owners: operations or plant manager, with support from an electrical engineer.
Risks and attention points: internal efficiencies have limits. They lower absolute consumption but do not change the price per MWh, which varies monthly in the regulated market because of tariff flags. Migration to the free energy market is the mechanism that structurally addresses the unit energy cost, with a price defined in contract.
Step 4: migration to the free energy market
Goal: contract energy at a negotiated price, defined term, and renewable source, reducing exposure to regulated‑market tariff flags.

Actions:
-
Confirm the company's eligibility, which must belong to Group A, with medium or high voltage supply. Since January 2024, all Group A consumers can migrate to the free energy market, regardless of consumption level
-
Select a retailer with its own renewable energy generation and a proven track record of managing large clients
-
Request a feasibility study with savings projection and contractual modeling
-
Sign a contract, usually for 3 to 5 years, with a pre‑agreed price
-
Start the migration process, with a regulatory deadline of 6 months, during which the retailer handles the bureaucratic steps
Internal owners: financial director and operations manager, with legal support for contract review.
Risks and attention points: Unplanned migration exposes Group A companies to price, contracted volume, and sector‑charge risks. Choosing a partner that assumes regulatory management with CCEE (Electric Energy Commercialization Chamber) is crucial to mitigate these risks. Serena Energia handles the entire migration process at no additional cost to the client, including installation of measurement equipment and registration with CCEE.
Migration checklist:
-
☐ Eligibility confirmed, Group A in medium or high voltage
-
☐ Feasibility study received and internally approved
-
☐ Contract reviewed and signed
-
☐ Notification process to the distributor initiated
-
☐ Adequate measurement system, responsibility of Serena Energia
-
☐ Registration with CCEE (Electric Energy Commercialization Chamber) completed
-
☐ Supply start date confirmed
Migrating to the free energy market is not a one‑off event. It marks the start of a new management model. The contract brings price predictability, but actual consumption continues to vary with the company's operations. Therefore, continuous monitoring is what turns migration into sustainable savings.
Step 5: continuous monitoring and budget review
Goal: track the financial and operational results of the migration, adjusting the plan as needed.
Actions:
-
Compare monthly the effective cost per MWh in the free energy market with the projected cost in the regulated market
-
Monitor actual consumption against contracted volume, staying within the contractual flexibility range
-
Review the energy budget semi‑annually, incorporating consumption variations and possible operational expansions
-
Track the issuance and use of I‑REC certificates for sustainability reporting
Internal owners: controller, with support from the consultant assigned by the retailer.
Risks and attention points: passive monitoring—just checking the monthly invoice—is not enough. Active review of the consumption profile allows identifying deviations before they generate additional short‑term market costs.
Common mistakes and how to fix them
Planning based only on regulated‑market history: projecting future costs using only regulated‑market tariffs ignores the savings potential of the free energy market and produces conservative budgets that do not reflect available alternatives.
Starting the process without a defined timeline: the migration process takes 6 months from distributor notification. Companies that postpone the decision lose months of potential savings. …
Between January and April 2026, 6,077 consumer units migrated to the free energy market in Brazil, and these companies are already capturing savings while others are still evaluating the topic.Incomplete documentation: the lack of detailed invoices or recorded demand history delays the feasibility study and can result in poorly sized contracts.
Lack of alignment between areas: migration decisions made only by the finance department, without involvement of operations and facilities, often result in contracts that do not reflect the company's actual consumption profile.
How to verify the results?
Measuring results consistently shows whether the energy budget planning is meeting financial and operational goals.
The most relevant KPIs to monitor the performance of energy budget planning are presented below. The table shows that operational indicators, such as cost per MWh and consumption deviation, require monthly review, while strategic indicators, such as accumulated savings and certification, can be reviewed over longer periods.
|
KPI |
What it measures |
Review frequency |
|---|---|---|
|
Effective cost per MWh |
Actual price paid for energy, including all charges |
Monthly |
|
Consumption deviation vs. contracted |
Adherence of consumption to the volume negotiated in the contract |
Monthly |
|
Accumulated savings vs. regulated market |
Financial difference between the current cost and the projected cost in the captive market |
Quarterly |
|
I-RECs issued vs. total consumption |
Coverage of renewable energy certification over the company's consumption |
Annual |
The recommended review cadence is monthly for operational KPIs and quarterly for the consolidated budget review. Serena Energia provides a digital dashboard tracking monthly savings, actual consumption, and a comparison between the captive market and the free energy market.
Advanced options
Multi-site management: companies with multiple consumer units can consolidate energy procurement with a single partner, simplifying management and, in many cases, improving negotiated terms. Serena Energia serves companies with operations throughout Brazil.
Sustainability goals with I-REC certification: companies with public decarbonization commitments can procure 100% renewable energy with issuance of I-REC certificates to zero Scope 2 emissions. Companies that migrated to the free energy market with I-REC certified suppliers can combine cost reduction and ESG goal fulfillment in a single contract. Serena Energia provides I-RECs and carbon credits, enabling verification of the renewable origin of consumed energy in auditable sustainability reports.

Talk to one of our consultants to structure an energy strategy that combines cost reduction, budget predictability, and sustainability goals.
Frequently Asked Questions
What is the requirement for a Group A company to migrate to the free energy market?
Eligibility depends only on the company being connected at medium or high voltage, i.e., belonging to Group A. There is no minimum consumption required. Since January 2024, all companies in this category have the right to choose their energy supplier. Serena Energia conducts the eligibility analysis at no cost.
Does migrating to the free energy market pose any risk of supply interruption?
Migration does not change the responsibility for the physical delivery of electricity. The local distributor remains responsible for wires, poles, and network quality. The change only concerns who sells the energy to the company. Serena Energia handles the entire migration process, including meter system adaptation, at no additional cost to the client.
How long does the migration process take?
The process takes 6 months from notification to the distributor, as detailed in Step 4. During this period, Serena Energia conducts the bureaucratic steps, from registration with the CCEE (Electric Energy Commercialization Chamber) to the installation of measurement equipment. The client does not need to manage these steps internally.
How does the free energy market reduce budget unpredictability?
In the regulated market, energy cost varies monthly according to tariff flags and annual adjustments set by ANEEL. In the free energy market, the price is agreed in advance in a contract, usually for 3 to 5 years. Regardless of hydrological conditions or other external factors, the contracted energy cost remains the same during the contract period, allowing more accurate budget projections.
What are I-REC certificates and why are they relevant for budget planning?
The I-REC, International Renewable Energy Certificate, is a global certificate that audibly proves that a certain volume of energy was generated from a renewable source. For companies with ESG goals, the I-REC is the instrument that allows formally declaring that electricity consumption is 100% renewable, information required in sustainability reports and by investors. Serena Energia issues I-RECs corresponding to each client's consumption, integrating certification into the energy supply contract.
Conclusion
Energy budget planning for Group A companies, those with medium and high voltage supply, has become a structured process with clear steps: consumption audit, goal setting, identification of internal efficiencies, migration to the free energy market, and continuous monitoring. The free energy market already accounts for 42% of national electricity consumption, and companies in sectors such as services, commerce, and sanitation are among those that grew the most in this environment in 2025.

Serena Energia, one of the largest wind and solar power generators created in the Americas, offers managed migration to the free energy market, as described in Step 4, with pre‑agreed price contracts, 100% renewable energy, and I-REC certification, all managed by a specialized team that represents the company before the CCEE (Electric Energy Commercialization Chamber).
Talk to one of our consultants and structure an energy budget plan that reduces costs, increases predictability, and strengthens your company's sustainability goals.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *