How does the spot PLD work in the free energy market?

Written by: André Lima, Growth, Serena Energia
Main lessons from this article
-
The weekly spot PLD ceased to exist in 2021 and was replaced by hourly calculation, which increased price volatility and settlement complexity for Group A consumers.
-
Settlement now occurs hour by hour by the CCEE (Electric Energy Commercialization Chamber), reflecting intraday variations in renewable generation and consumption, which reduces budget predictability without fixed-price contracts.
-
Deviations between contracted volume and actual consumption are settled at the PLD of the corresponding hour, which can generate high costs during peak times or low revenues during lower-demand periods.
-
Factors such as hydrology, renewable generation, thermal dispatch, and transmission constraints directly influence the hourly PLD.
-
Contracting a fixed price with active management of short‑term market exposure is the most effective strategy to reduce settlement risks in the hourly PLD. Talk to a Serena Energia consultant.
What was the weekly spot PLD?
The weekly spot PLD was the settlement price for differences calculated once a week by the CCEE (Electric Energy Commercialization Chamber) for each of the four sub‑markets of the National Interconnected System: Southeast/Central‑West, South, Northeast and North. This value was unique for the entire following week and derived from the Marginal Cost of Operation, calculated by the National Electric System Operator using the NEWAVE models for five‑year horizons, and DECOMP for two‑month horizons.
Any difference between the contracted energy volume and the volume actually consumed by a company was settled at this single weekly price. Consuming more than contracted meant paying the week's PLD for the excess. Consuming less meant receiving the week's PLD for the unused volume. Predictability was partial, as the price changed each week but remained fixed within that seven‑day period.
Why did the weekly model end in 2021?
The accelerated expansion of intermittent renewable sources, such as wind and solar, made the weekly model poorly aligned with the actual operation of Brazil's electric system. Electricity market prices in Brazil began to be calculated on an hourly basis in 2021, which increased the intraday PLD variation and widened regional differences as renewable generation grew.

A single weekly price did not capture, for example, the excess solar generation at noon or the dispatch of more expensive thermal plants at the start of the night. The incorporation of DESSEM, the ONS short‑term model, enabled the hourly model. This model began to more accurately reflect the marginal cost of each hour of the day and made the price signal more aligned with the system’s actual operation.

How hourly settlement works today?
The hourly model replaced the weekly one and now defines the PLD hour by hour, which directly changes how Group A companies are settled in the short‑term market. Currently, the CCEE calculates the PLD hour by hour for each sub‑market, reflecting the instantaneous balance between generation supply and consumption demand in the National Interconnected System. The process follows this sequence:
-
The ONS runs DESSEM, a short‑term optimization model, which determines the most economical dispatch of each plant for each hour of the following day.
-
The resulting CMO is delivered to the CCEE, which excludes plants dispatched solely for system security reasons, not for economic merit, before calculating the PLD.
-
The hourly PLD is published by sub‑market. Each region can have a different price at the same hour, according to transmission constraints and the local generation mix.
-
At the end of the month, the CCEE determines the differences between the contracted volume and the measured volume of each agent and settles those differences at the PLD of each corresponding hour.
This model causes a company that consumes energy irregularly throughout the day to be settled at very different prices, depending on the time the deviation from the contract occurs.
What happens if you consume more or less than contracted?
Deviations between actual consumption and contracted volume generate short‑term market settlements at the PLD of the hour of the deviation. Consuming beyond the contract during a peak hour can generate significant costs. Consuming below the contract means selling the excess to the market at that hour’s PLD, which can be low, especially midday when solar generation tends to lower prices.
The example below shows how these deviations can affect the financial result in a single hypothetical month, considering a contract of 500 MWh at R$ 150/MWh. The asymmetry is clear: an upward deviation can generate a high additional cost, while a downward deviation tends to generate much lower revenue for the same energy volume.
|
Situation |
Contracted volume (MWh) |
Actual consumption (MWh) |
Short‑term market settlement |
|---|---|---|---|
|
Balance |
500 |
500 |
R$ 0, no exposure |
|
Under‑contracting, higher consumption |
500 |
550 |
50 MWh × PLD of the deviation hour, e.g., R$ 300/MWh, additional cost of R$ 15,000 |
|
Over‑contracting, lower consumption |
500 |
450 |
50 MWh sold at the hour’s PLD, e.g., R$ 30/MWh, revenue of R$ 1,500 |
The PLD values used in the example reflect the range observed in the market. Hourly fluctuations regularly exceed R$ 200/MWh in 2026 and have even surpassed R$ 300/MWh in the Southeast sub‑market on January 14, 2026, while there are hours when the price is zero.
What factors influence the hourly PLD value?
The hourly PLD results from the combination of hydrological conditions, generation profile, demand and physical network constraints. The main determinants are:

-
Hydrology and reservoir levels: river flow in the main hydrographic basins is the variable that most strongly affects the daily PLD, as hydroelectric plants account for more than 50% of Brazil’s electric generation. Drought periods raise thermal dispatch and push prices up.
-
Talk to one of our consultants and see how to structure a fixed‑price contract suitable for your company's consumption profile.
Why choose Serena Energia to eliminate PLD exposure
Choosing Serena Energia means having a supplier with its own generation and a consolidated presence in commercialization. The company is among the largest wind and solar power generators created in the Americas, with over 17 years of history and 17 operational plants in Brazil and the United States. This vertical integration, which combines generation and commercialization, increases supply security compared to companies that only connect businesses to the free energy market.
For Group A companies, Serena Energia delivers an integrated solution that reduces financial risk and simplifies operation in the free energy market:
-
Long‑term fixed‑price contracts: the cost of contracted energy does not fluctuate with the hourly PLD, allowing more accurate budget planning.
-
Full representation before the CCEE: in the retail model, Serena represents the client’s company in all sector obligations, at no additional cost for clients under its management.
-
Single invoice: Serena Energia centralizes operational complexity and consolidates energy items into a single document for the client.
-
100% renewable energy with I‑REC certification: each MWh consumed can be traced back to its source, contributing to ESG goals and sustainability reporting.
-
Managed migration: Serena conducts the entire migration process to the free energy market, including measurement system adaptation, at no additional cost for clients under its management.
Clients such as Heineken, Cargill and Bayer already use energy supplied by Serena Energia. Since 2017, the company has avoided emitting more than 2.14 million tonnes of CO₂.
Request your feasibility study and discover how much your company can save with fixed‑price renewable energy.
Frequently asked questions about PLD and hourly settlement
Does the weekly spot PLD still exist in the free energy market?
The weekly spot PLD is no longer used. Since 2021, the PLD is calculated hour by hour by the CCEE for each sub‑market of the National Interconnected System. The weekly model was discontinued because it did not adequately reflect intraday variations in generation and consumption, especially after the expansion of intermittent renewable sources.
What happens to my company if the hourly PLD rises sharply?
A fixed‑price contract with active deviation management isolates the cost of contracted energy from hourly PLD fluctuations. Exposure is limited to differences between contracted volume and actual consumption. Without a fixed‑price contract, all consumed energy can be settled at the hourly PLD, which in 2026 has already reached the extreme levels mentioned earlier.
Can any company migrate to the free energy market and have a fixed‑price contract?
Companies can migrate to the free energy market and contract a fixed price as long as they belong to Group A, i.e., are medium‑ or high‑voltage consumers. There is no minimum consumption required. Serena Energia conducts, at no cost, the eligibility analysis and feasibility study to project potential savings before any contractual commitment.
How long does it take to migrate to the free energy market with Serena Energia?
The migration process takes about six months, the time needed to terminate the contract with the current distributor. Serena Energia handles all steps, such as registration with the CCEE, measurement system adaptation, and preparation of technical and legal documentation, at no additional cost for clients under its management. After migration, the client operates in the free energy market with a fixed price.
What is the I‑REC and why is it relevant for companies in the free energy market?
The I‑REC, International Renewable Energy Certificate, is a global certificate that audibly proves that 1 MWh of energy was generated by a clean source and injected into the power grid. By contracting energy with Serena Energia, a company can request I‑RECs corresponding to its consumption and use them in sustainability reports to declare that its electricity consumption is 100% renewable, which is relevant for ESG goals and to meet the requirements of investors and business partners.
-

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *