How to protect your business from inflation and high costs

Written by: André Lima, Growth, Serena Energia
Main takeaways from this article
- Companies that grow revenue without controlling operating costs lose real margin. Having a structured margin protection strategy becomes essential.
- Electricity is, in many cases, the last relevant OPEX line that has not yet undergone a structured review. Reducing this cost is possible by migrating to the free energy market.
- Including indexing clauses and revision triggers in input and labor contracts transfers part of the inflationary risk outside the company.
- Improving the cash conversion cycle and actively managing working capital helps preserve margins in high-interest-rate scenarios.
- To implement the migration to the free energy market and protect operating margins, talk to a Serena Energia consultant.
1. Map the income statement's inflationary exposure and treat energy as the last frontier
The first step is to turn the income statement into an inflationary exposure map. Each cost line must be classified by three criteria: weight in total OPEX, degree of inflation indexing, and available negotiation margin.
In a scenario of accumulated inflation, the nominal revenue growth of listed companies was often insufficient to preserve margins in real terms. This shows that simply growing revenue is not enough. Companies that did not act on costs lost real margin even with higher billings.
The table below illustrates the typical impact of a margin compression and the effect of a structured action on the energy line:
| Scenario | Net Revenue | OPEX (excluding energy) | Energy Cost | Operating Margin |
|---|---|---|---|---|
| Before energy cost reduction | R$ 10,000,000 | R$ 7,500,000 | R$ 800,000 | 17.0% |
| After migrating to the free energy market | R$ 10,000,000 | R$ 7,500,000 | R$ 640,000 | 18.6% |
Illustrative values. Effective savings depend on the consumption profile and contractual conditions of each company.
This example shows that electricity is, in many cases, the last relevant OPEX line that has not yet undergone a structured review. Payroll, rent, and inputs are usually already renegotiated. The energy bill often remains unchanged.
Responsible: controller or CFO, with support from the operations manager to survey consumption by unit.
Risk: treating energy solely as a fixed cost and ignoring the variable portion of tariff flags, which makes any budgetary projection inaccurate.
Verification metric: percentage of OPEX represented by energy, segregated by consuming unit.
- Gather the energy bills from the last 12 months per unit, creating the database for subsequent analyses
- With this history in hand, classify each cost line by weight, indexing, and negotiation margin
- Use this classification to identify which units belong to Group A (medium and high voltage) and are therefore eligible for the free energy market
- Finally, calculate the impact of a reduction in the energy line on the income statement's operating margin, quantifying the opportunity before acting
2. Negotiate input and labor contracts with indexing clauses
Supply contracts without a structured adjustment mechanism concentrate inflationary risk within the company. Traditional fixed-price contracts tend to lock in margin pressure in persistent inflation environments when they do not include escalation rights, surcharge mechanisms, or review clauses.
The technical recommendation is to replace static contracts with models featuring indexing to public indices, periodic reviews, and reopening triggers when costs exceed predefined bands. Hybrid escalation models with a basket of weighted indices, monthly surcharges, and annual caps preserved margins during 22% cost spikes in long-term contracts. This type of structure reduces the need d and emergency renegotiations.
Responsible: purchasing director or controller, with legal validation of the clauses.
Risk: indexing contracts to indexes that do not reflect the actual composition of the supplier's costs, which generates conflict during revision.
Verification metric: percentage of purchasing volume covered by contracts with a formal indexing clause.
- Audit all active supply contracts and identify those without an adjustment clause
- Define reference indexes appropriate to each category, such as IPCA, IGP-M, INPC, or sectoral indexes
- Include semi-annual review clauses and reopening triggers for variations above 10%
- Renegotiate labor contracts with scaling linked to productivity, not just inflation
3. Optimize working capital and cash conversion cycle
In high-interest environments, the cost of working capital silently erodes margins. Analyses show a relevant deterioration in the financial results of Brazilian listed companies, which demonstrates that the cost of money is a compression vector just as relevant as direct operating costs.
Reducing the cash conversion cycle—by shortening the average collection period, extending the average payment period within ethical limits, and reducing inventory—frees up cash without requiring cuts in operations. Shortening receivables, improving real-time spending visibility, and centralizing financial data helps protect margins when inflation pressures working capital.
Responsible: controller and financial manager, with the support of the commercial and purchasing departments.
Risk: pressing suppliers beyond reason, compromising the relationship and continuity of supply.
Verification metric: cash conversion cycle in days, compared to the same period of the previous year.
- Map the average collection period by customer and segment
- Implement early payment discounts for strategic customers
- Review minimum and maximum inventory policies by SKU
- Centralize cash visibility in a single dashboard with daily updates
- Model cash sensitivity scenarios under different inflation and Selic assumptions
Simulate the impact of migration on your income statement with a Serena consultant.
4. Implement energy management and migrate to the free energy market with Serena
Treating the electricity bill as a margin lever expands the budget's room for maneuver. In industrial and commercial companies, this cost represents a significant portion of operating expenses.

Group A companies, connected to medium or high voltage, can operate in the free energy market and negotiate price, term, and energy source directly with a generator or trader. There is no minimum consumption required; belonging to Group A is sufficient.
In the captive market, the price is regulated and subject to annual adjustments and tariff flags. In the free energy market, the price is agreed upon in a long-term bilateral contract, generally lasting 3 to 5 years, which eliminates the uncertainty of tariff flags and allows for more precise budget planning. The physical delivery of the energy remains the responsibility of the local distributor. What changes is the energy supplier.

Step 1: Check eligibility
Confirm if the company is is in Group A, with medium or high voltage supply. Serena performs this analysis at no cost, based on energy bills.
Step 2: analyze the consumption profile
Map monthly consumption in kWh, identify seasonalities and demand peaks. This survey guides the contract structure in the free energy market.
Step 3: choose a retailer with its own generation
Choosing a retailer with its own generation reduces supply risks. Companies that merely resell third-party energy depend on other agents to honor contracts. Serena is among the largest wind and solar energy generators created in the Americas, with over 17 years of history and clients such as Cargill, Heineken, Bayer, and Eurofarma.

Step 4: register the company with CCEE (Electric Energy Commercialization Chamber)
After choosing the retailer, the next step is to formalize entry into the free energy market. Registration with CCEE (Electric Energy Commercialization Chamber) is mandatory to participate in the free energy market. Serena conducts this process for clients under its management.
Step 5: negotiate the energy contract
Negotiating the bilateral contract defines the price of energy for the agreed period. Serena structures contracts that seek savings compared to the regulated market and greater cost predictability.
Step 6: implement the metering system
Installing the hourly metering system is a requirement of the free energy market. Serena is responsible for installing the equipment for clients under its management.
Step 7: monitor and adjust
Monitoring performance after migration consolidates margin gain. A dedicated Serena consultant tracks monthly performance. The digital dashboard displays monthly savings, consolidated savings, comparison between the captive market and the free energy market, consumption forecast, and actual consumption.
The regulatory migration deadline is 6 months, starting from the notification to the distributor. Savings begin to appear on the first bill after the process is completed.
| Criterion | Captive market | Free energy market with Serena |
|---|---|---|
| Energy price | Regulated by ANEEL, with annual adjustments | Defined in a bilateral contract for 3 to 5 years |
| Tariff flags | Applied to consumption | Do not apply to the contracted energy portion |
| Budgetary predictability | Low, with unpredictable adjustments and flags | High, with price defined in advance in contract |
| Renewable origin certification | Not available | I-RECs available for ESG reporting |
| Process management | Company assumes all bureaucracy | Serena conducts migration and management for clients under its management |
Managed migration services, energy consulting, and energy management are offered to clients under Serena's management.
Responsible: chief financial officer or controller for the contractual decision, and operations manager for the technical monitoring of the migration.
Risk: choosing a retailer without its own generation, which increases dependence on third parties for supply.
Verification metric: energy cost per MWh before and after migration, in addition to monthly budget variance in the energy line.
- Request eligibility analysis and feasibility study based on bills from the last 12 months
- Close a contract with a retailer that has its own generation and a proven track record
- Monitor the migration process with the distributor and CCEE (Electric Energy Commercialization Chamber)
- Activate the monitoring dashboard after entering the free energy market
- Request the issuance of I-RECs for sustainability reports, when applicable
5. Monitor monthly and adjust contracts based on data
Treating margin protection as a continuous routine, rather than a one-off project, increases financial resilience. Financial leaders who measure margins with granularity, track indicators in real time, and perform periodic margin stress tests reduce their reliance on static monthly reports.
Integrating the five fronts into a single management dashboard, with alerts for significant budget deviations, facilitates quick decisions.
Responsible party: Controller, with monthly reporting to the chief financial officer and the board, when applicable.
Risk: Monitoring only the consolidated result, without visibility by cost line and business unit.
Verification metric: Monthly budget variance by cost line and comparison between actual and projected operating margin.
- Establish a monthly margin review meeting attended by the chief financial officer and operations manager
- Monitor energy costs per consuming unit on the Serena Energia dashboard
- Review input and labor contracts every 6 months
- Perform quarterly margin stress testing under 5%, 7%, and 10% inflation scenarios
- Update the income statement's inflationary exposure map every quarter
5-front validation checklist:
- Income statement mapped with inflationary exposure by cost line
- Input and labor contracts with formalized indexation clauses
- Cash conversion cycle monitored with a defined target
- Migration to the free energy market initiated or completed for Group A units
- Active monthly monitoring dashboard with deviation alerts
Receive a customized feasibility study for your company with Serena Energia.
Frequently asked questions about migrating to the free energy market
Does my company need a minimum consumption to migrate to the free energy market?
No. Since January 2024, any company connected at medium or high voltage, belonging to Group A, can migrate to the free energy market, regardless of consumption volume. Serena Energia performs the eligibility analysis at no cost, based on the company's energy bills.
How long does the migration process take?
The regulatory process takes 6 months, starting from the formal notification to the local distributor. Serena Energia handles steps such as registration with CCEE (Electric Energy Commercialization Chamber), adaptation of the metering system, and monitoring with the distributor for clients under its management. Savings begin to appear on the first bill after the migration is completed.
Does migration pose any risk to operational continuity?
No. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of energy and grid quality. What changes is the energy supplier. Operations are not interrupted during or after the migration process.
What happens if my company consumes more or less than the contracted volume?
Contracts in the free energy market provide for a flexibility range. Consumption outside this range is settled in the short-term market. Serena Energia offers active management to reduce this exposure, helping the company forecast consumption and adjust its position when necessary.
How does the free energy market contribute to ESG goals?
The energy supplied by Serena Energia is wind-generated. For each MWh consumed, the company can request the issuance of I-RECs (International Renewable Energy Certificates), globally recognized certificates that prove the consumption of renewable energy. These certificates are used in sustainability reports to zero out Scope 2 emissions, meeting the demands of investors, customers, and regulators. Serena Energia also offers carbon credits for other emission sources.
In summary
Operating cost inflation in 2026 requires a structured response across five fronts: income statement mapping, contract indexation, working capital optimization, migration to the free energy market, and continuous monitoring. Among these fronts, energy combines a significant impact on margins, a defined implementation timeframe, and no need for CAPEX. In about 6 months, the company can lock in energy costs, eliminate the uncertainty of tariff flags, and direct resources toward growth.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *
