How to reduce energy costs and increase profit margin?

Written by: André Lima, Growth, Serena Energia
Key lessons of this article
- Group A companies can significantly reduce their energy bill by diagnosing consumption, adjusting contracted demand, and eliminating charges for unused capacity.
- Simple operational actions, such as turning off standby equipment and redistributing loads outside peak hours, generate savings without investment.
- Reviewing the contract with the distributor is an independent step and can reduce costs even while the company remains in the regulated market.
- Managed migration to the free energy market allows contracting renewable energy with a pre‑fixed price, reducing the impact of tariff flags.
- With Serena Energia, the entire process occurs at no additional cost and without operational risk. Talk to a consultant and start saving within up to six months.
Prerequisites and initial conditions
The process starts with organizing the basic information of the consumer unit.
- Energy bills from the last 12 months from the local distributor.
- Current contracted demand agreement.
- Monthly consumption history in kWh and record of demand peaks in kW.
- Involvement of finance, operations, and, when applicable, sustainability areas.
- Leadership alignment on the six‑month timeline until savings begin.
There is no minimum consumption required. Any Group A company, connected at medium or high voltage, can migrate to the free energy market.
Overview of the process in 6 steps
The path to reduce energy cost and increase profit margin follows six linked steps, from initial analysis to continuous management.

- Conduct consumption and contracted demand diagnosis.
- Apply efficiency measures without significant investment.
- Review the contract with the distributor.
- Complete the managed migration to the free energy market with Serena Energia.
- Monitor consumption monthly and calculate energy per product.
- Maintain continuous optimization and structure sustainability certification.
Step by step: how to reduce energy cost and increase profit margin
Step 1: consumption and contracted demand diagnosis
Goal: map where and when the company consumes energy and verify if the contracted demand aligns with the real operational profile.
Actions:
- Gather monthly consumption in kWh for the last 12 months and identify seasonality. This history shows periods of higher and lower demand.
- Compare the contracted demand in kW with the measured demand recorded on the bills. This comparison indicates whether there is idle capacity or recurring overages.
- Identify peak hours with higher consumption and assess the possibility of shifting loads to other times. This redistribution reduces peaks and associated costs.
- Map high‑consumption equipment, such as compressors, chillers, furnaces, and lighting and HVAC systems. This mapping guides the prioritization of operational adjustments.
Internal responsible: operations or facilities manager, with support from the controller.
Note: contracted demand above actual consumption generates charges for unused capacity. Demand below actual consumption generates overage penalties. Adjusting this balance usually has high impact without requiring investment.
Step 2: efficiency measures without significant investment
Goal: reduce consumption through operational and behavioral adjustments, without construction or purchase of new equipment.
Actions:
- Turn off standby equipment outside production hours to avoid unnecessary consumption.
- Adjust HVAC and refrigeration set points to appropriate operational ranges, avoiding excessive cooling or heating.
- Shift heavy loads outside peak hours, reducing cost during the most expensive periods.
- Implement leak detection routines in compressed air systems, which often cause constant losses.
- Review preventive maintenance contracts for high‑power equipment to keep operation close to nominal efficiency.
Reference: the Energy Research Company publishes studies on energy efficiency in the Brazilian industrial and commercial sector that help prioritize these actions.
Note: recording consumption before and after each adjustment allows measuring impact and building a savings history.
Want to estimate savings with efficiency measures and migration? Talk to Serena Energia and calculate your company's cost reduction potential.
Step 3: contract review with the distributor
Goal: align contracted demand with the real consumption profile and reduce unnecessary charges.
Actions:
- Use the Step 1 diagnosis to request the distributor to adjust the contracted demand.
- Check whether the tariff classification, such as sub‑groups A1, A2, A3, A3a and A4, is correct for the unit's voltage level.
- Assess if there are recurring overage charges indicating undersized demand.
Note: this step is independent of migration to the free energy market. The company can reduce costs while still in the regulated market as the migration process progresses.
Step 4: managed migration to the free energy market with Serena Energia
Goal: exit the regulated market, where prices are regulated, and start contracting energy directly with a chosen supplier, with a pre‑agreed price and certified renewable origin.

Actions and responsibilities:
- Feasibility analysis: Serena Energia analyzes the company's bills and consumption profile and projects the expected savings. This service is free.
- Bureaucratic process: Serena Energia conducts the entire process with the CCEE (Electric Energy Commercialization Chamber) and the distributor, including technical, legal and financial documentation, measurement system adaptation and installation of necessary equipment, at no additional cost to the client.
- Timeline: the process takes six months. The sooner the company starts, the sooner it begins saving.
- Physical supply: the local distributor remains responsible for electricity delivery. Migration is a commercial and contractual process. The risk of supply interruption is nil.
- Continuous management: after migration, Serena Energia represents the company before the CCEE, handles payment to the distributor and provides a dedicated consultant. The client receives two invoices and has specialized support.
Serena Energia is among the largest wind and solar generators created in the Americas, with over 17 years of history and clients such as Heineken, Cargill and Bayer. In the free energy market, it operates primarily with renewable energy and offers savings compared to the regulated market.

Ready to start the migration to the free energy market? Talk to a Serena Energia consultant and organize the process for the next six months.
Step 5: monthly monitoring and energy calculation per product
Goal: transform consumption data into a management indicator and connect energy cost to the company's production or operations.
Actions:
- Monitor monthly the Serena Energia dashboard, which shows consolidated savings, comparison between regulated and free energy markets, actual consumption and consumption forecast.
- Calculate the energy per product indicator, such as kWh per unit produced, per square meter served, or per revenue generated, as recommended by the International Energy Agency in its energy efficiency report.
- Compare monthly invoices before and after migration to quantify accumulated savings.
Step 6: sustainability certification with I-RECs
Goal: document renewable energy consumption for ESG reports and stakeholder requirements.
Actions:
- Request Serena Energia to issue I-RECs, international renewable energy certificates, corresponding to the company's consumption.
- Use the certificates in annual sustainability reports to demonstrate Scope 2 emissions reduction.
- Assess carbon credits to neutralize other emission sources beyond electricity.
Common mistakes and how to fix them
| Mistake | Consequence | Correction |
|---|---|---|
| Not reviewing contracted demand before migrating | Free energy market contract sized incorrectly | Conduct the Step 1 diagnosis before signing any contract |
| Starting the process without involving finance | Delays in approval and loss of months of savings | Align CFO and controller from the start |
| Not monitoring consumption after migration | Exposure | Implement continuous monitoring and reporting |
Result verification and monitoring metrics
Tracking clear indicators shows whether the cost‑reduction plan is progressing.
- Consolidated monthly savings: difference between the amount that would be paid in the captive market and the amount actually paid in the free energy market, accumulated month by month.
- Invoice comparison: line‑by‑line analysis of invoices before and after migration, available in the Serena Energia dashboard.
- Cost variability reduction: comparison of the monthly standard deviation of the energy bill before and after the contract with a pre‑agreed price.
- Energy per product: kWh consumed divided by the volume produced or the revenue generated in the period, according to the methodology of the IEA.
- Scope 2 emissions: tonnes of CO₂‑equivalent avoided based on issued I‑RECs.
Advanced options and next steps
After stabilizing the contract in the free energy market, the company can deepen its energy and sustainability strategy.
The dedicated consultant from Serena Energia can support periodic review of the contracted volume based on actual consumption evolution, assessment of larger‑scale energy‑efficiency projects using the accumulated dashboard data, and expansion of the sustainability strategy with carbon credits for emissions beyond Scope 2.
The CCEE and the EPE publish periodic market data that support long‑term decisions.
Frequently asked questions
Can my Group A company migrate to the free energy market even with low consumption?
Yes. There is no minimum consumption to migrate. The eligibility criterion is being classified in Group A, which includes companies connected at medium and high voltage. Serena Energia conducts the eligibility analysis at no cost.
How long does the migration process take?
The process takes six months to complete all steps with the CCEE. As explained in the migration step, Serena Energia carries out this process with no additional cost to the client.
Will the company be without electricity during migration?
No. Migration is a commercial and contractual process. The local distributor remains obligated to deliver electricity to the consumption unit during and after migration. The only change is the supplier from which the company purchases energy.
How does payment work after migration?
After migration, the company receives two invoices. One invoice comes from Serena Energia, referring to the contracted energy. The other invoice comes from the distributor, referring to the use of the distribution network. Serena Energia centralizes management and handles payment to the distributor, simplifying the process for the client.
What is the I‑REC and how does it help sustainability reports?
The I‑REC, an international renewable energy certificate, audibly proves that a certain volume of energy was generated from a renewable source. For each MWh consumed, Serena Energia can issue a corresponding I‑REC. This document is one of the main tools to zero Scope 2 emissions in ESG reports and meet the requirements of investors, customers, and external audits.
Conclusion: place your energy in the right spot
Group A companies, connected at medium and high voltage, have a structured path to reduce energy costs and increase profit margin: consumption diagnosis, operational adjustments without heavy investment, contractual review, and managed migration to the free energy market. The process takes six months and, with Serena Energia, is carried out end‑to‑end with no additional cost and no operational risk.
The result is an energy bill with a pre‑agreed price, savings compared to the captive market, a monthly monitoring dashboard, and I‑REC certification for sustainability reports. Serena’s track record with large‑scale clients across various sectors supports this proposal.
Want to make your company’s energy work in favor of profit margin? Talk to a Serena Energia consultant and understand the savings potential of your operation.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment