SERENA
Back to Blog
All articles • 27/06/2026

How to reduce electricity costs in your company

How to reduce electricity costs in your company

Written by: André Lima, Growth, Serena Energia

Main lessons from this article

  • Group A companies can replace regulated tariffs subject to flags with fixed‑price contracts in the free energy market, providing budget predictability.

  • Conducting a detailed analysis of the current bill, focusing on contracted demand, consumption and power factor, is the first step to identify cost‑reduction opportunities before or during migration.

  • Migration to the free energy market requires six months’ notice. Serena Energia handles the regulatory, technical and documentation process without passing adaptation costs to the client.

  • In addition to savings, contracting renewable energy with Serena Energia allows the issuance of I‑RECs and supports ESG goals, including Scope 2 emissions reduction.

  • To start a free feasibility analysis, talk to a Serena Energia consultant.

Captive market vs. free energy market: basic concepts

The captive market keeps the company tied to the local distributor, purchasing electricity at regulator‑defined prices. The company does not choose the supplier nor negotiate commercial terms. The green, yellow, red 1 and red 2 tariff flags can raise electricity costs during water scarcity periods and create significant budget fluctuations.

The free energy market allows the company to keep the local distributor only as the physical electricity delivery responsible, with wires and poles managed by that distributor. The difference lies in the commercial source of the energy: the company now buys from a supplier of its choice, such as Serena Energia, with price, term and volume negotiated in a bilateral contract. The quality and stability of the physical supply remain the same.

How to analyze your current bill?

Before assessing migration to the free energy market, the company needs to understand what it pays today on the bill. A Group A company's electricity bill contains two main components that determine the monthly cost: contracted demand and actual consumption.

The contracted demand is the power amount, in kW, that the company reserved with the distributor. The charge occurs regardless of use, meaning that contracting the wrong value creates waste. Companies that contract demand above what they actually use pay for idle capacity. When the company exceeds the contracted demand, the distributor applies over‑use tariffs.

The consumption, measured in kWh, reflects the energy actually used during the period. Analyzing the last 12 months of consumption shows seasonality, peaks and the unit’s load profile. This information guides the correct sizing of a contract in the free energy market.

In addition to these two items, the bill may show charges for excess reactive energy when the installation’s power factor falls below the established limit. Identifying and correcting this point reduces costs while still in the captive market and prepares the company for a more efficient migration.

Request a free analysis of your bill and receive a personalized feasibility study for your company.

Main alternatives to reduce electricity costs

Group A companies have several paths to lower energy costs. The table below compares the main options across four dimensions.

Alternative

Initial investment

Management complexity

Financial impact

Adjustment of contracted demand

Low, focusing on analysis and contractual adjustment

Low

Reduction of charges for idle or over‑run demand

Power‑factor correction

Medium, with acquisition of correction equipment

Medium

Elimination of excess reactive‑energy charges

Self‑generation of energy

High, with deployment of own infrastructure

High, requiring continuous operation and maintenance

Partial cost reduction, with a longer payback period

Migration to the free energy market

Adaptation costs covered by Serena Energia

Low, with outsourced management

Combined savings with cost predictability

These alternatives can be combined to amplify cost reduction. Demand adjustment and power‑factor correction can occur in parallel with migration to the free energy market, increasing the total financial impact.

Who can migrate to the free energy market?

Companies classified in Group A, with medium or high‑voltage supply, can migrate to the free energy market. There is no minimum consumption requirement. The determining criterion is the supply voltage level, not the amount of energy consumed.

Companies with multiple consumer units can analyze each unit individually. When a unit does not qualify for Group A on its own, the company can evaluate alternatives such as load sharing among units. Serena Energia performs this eligibility analysis at no cost.

Migration steps: from study to first invoice

1. Feasibility analysis

Serena Energia starts the process by analyzing the last 12 months of bills and the company’s consumption profile. With this data, the team projects the expected savings and presents a detailed study before any decision.

2. Contract signing

After confirming feasibility, the company signs the supply contract with Serena Energia. Contracts usually have a term of 3 to 5 years, with a price agreed in advance, eliminating fluctuations associated with tariff flags.

3. Migration process

The migration phase lasts six months, the period required for the prior notice to terminate the contract with the distributor. During this time, Serena Energia handles registration with CCEE (Electric Energy Commercialization Chamber), measurement‑system adaptation and all documentary and technical obligations. The client does not need to manage these activities, and Serena Energia assumes the adaptation costs.

4. Start of supply and first invoice

At the end of the migration, the company begins receiving energy from Serena Energia at the contracted price. The local distributor remains responsible for physical delivery. The client receives two invoices, one for energy and one for distribution, and has a dedicated consultant for continuous monitoring.

Start the migration process with Serena Energia and assess the savings potential for your company.

Operation and continuous monitoring

After supply begins, Serena Energia maintains active contract management. A dedicated consultant monitors monthly consumption, compares it with the contracted volume and tracks financial performance.

The company has access to a digital dashboard showing information such as monthly bill savings, accumulated consolidated savings, comparison between captive and free markets, consumption forecast and actual consumption to date.

Serena Energia also represents the company before CCEE (Electric Energy Commercialization Chamber) in the retail model, handling financial settlements, guarantee contributions and sector‑specific data submission. This way, the client can focus on its core business.

Common risks and how to mitigate them

Operational managers often worry about the risk of supply interruption during migration. This risk does not apply, because the local distributor remains obligated to deliver electricity to the company’s premises. Migration occurs at the commercial and contractual level, without changing the quality or stability of the grid.

Consumption outside the contracted range is another point of attention. Contracts usually allow a flexibility of about 5 % to 10 % of the contracted volume. Consumption above or below this range is settled in the short‑term market. Serena Energia’s active management monitors consumption monthly to reduce this exposure.

The supplier’s solidity influences operational security. Serena Energia has more than 17 years of history, is among the largest wind and solar generators in the Americas, operates 17 plants in Brazil and the U.S., and serves large‑scale clients such as Heineken, Cargill and Bayer. The combination of own generation with commercialization contributes to supply stability compared with companies that rely solely on third‑party purchases.

Sustainability: I‑REC and carbon credits

The energy sold by Serena Energia in the free market comes primarily from wind sources. For companies with ESG targets and sustainability reports, this characteristic directly contributes to environmental indicators.

A single white wind turbine stands out amid a dense layer of fog or clouds, illuminated by the soft light of the sunset.
Advanced wind technology allows Serena Energia to capture constant winds at high altitudes, ensuring a clean, stable and efficient energy source for your business.

The I‑REC (International Renewable Energy Certificate) is a global certificate that audibly proves that 1 MWh of energy was generated from a renewable source and injected into the grid. Each certificate tracks the energy from the generating plant to the final consumer. By acquiring I‑RECs together with the energy, the company can declare that its electricity consumption is 100 % renewable, essential information for sustainability reporting and Scope 2 emissions‑reduction targets.

Side profile of a worker in a wind farm, with the sun in the background and multiple wind turbines stretching across the horizon.
The dedication of qualified field professionals is what guarantees the efficiency and constant availability of the clean energy that drives
our clients' businesses.

For companies seeking to expand this impact, Serena Energia offers access to carbon credits from certified projects, which allows neutralizing emissions from other scopes. Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂.

Landscape of a renewable energy park at sunset, featuring large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the supply of the Free Market.

Frequently Asked Questions

Can my company migrate to the free energy market?

Yes. As explained earlier, the criterion is to be in Group A, with medium or high voltage supply. Serena Energia conducts the eligibility analysis at no cost.

How long does the migration to the free energy market take?

The migration takes six months, a period that corresponds to the prior notice to the distributor. During this time, Serena Energia manages the technical, regulatory, and documentary steps, as detailed in the section on the migration process.

How does billing work after the migration?

After the migration, the company receives two invoices. Serena Energia issues the invoice for the contracted energy. The local distributor issues the invoice for the distribution service. A dedicated Serena Energia consultant centralizes management and supports the client in monthly monitoring.

What happens if my company consumes more or less energy than contracted?

Contracts provide a flexibility range, usually between 5% and 10% of the contracted volume. Consumption outside this range is settled in the short‑term market. Serena Energia monitors monthly consumption and advises adjustments to reduce this exposure.

What is the I-REC and what is it used for?

The I-REC is the certificate that verifies the renewable origin of the energy used by the company in its sustainability reports. This instrument is the main tool for zeroing Scope 2 emissions, as detailed in the sustainability section.

Conclusion and Next Steps

Group A companies, with medium or high voltage supply, have in the free energy market a concrete alternative to the captive market. Migration replaces tariffs subject to adjustments and tariff flags with contracts at a pre‑agreed price, which increases budget predictability and can reduce the energy bill.

The process takes six months and Serena Energia conducts the full journey, from the initial analysis to continuous monitoring. The supplied energy is of renewable origin, with the issuance of I‑RECs that allow the commitment to sustainability to be verified in an auditable way.

The first step is to analyze the current invoice and your company's consumption profile. Talk to a Serena Energia consultant and receive a free, personalized feasibility study for your operation.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *