How to reduce electricity costs: guide for businesses

Written by: André Lima, Growth, Serena Energia
Key lessons of this article
- Group A companies can migrate to the free energy market and obtain budget predictability by negotiating price, term and source directly with marketers.
- Adopting simple energy efficiency actions, such as reviewing contracted demand and eliminating phantom consumption, generates quick bill reductions without the need for migration.
- Choosing a partner with its own generation and proven track record reduces price volatility risk and increases supply stability.
- Use of I-REC certificates allows auditable verification of renewable energy consumption, meeting ESG requirements and zeroing Scope 2 emissions.
- Serena Energia offers full consulting and managed migration to the free energy market. Request an analysis with our consultants and discover your company's savings potential.
Captive market vs free energy market: practical difference for your company
In the captive market, the company purchases energy directly from the local distributor, at prices regulated by ANEEL. There is no negotiation of price, term or energy source. The tariff is the same for all consumers of the same profile in the concession area.
In the free energy market, the company maintains the physical connection with the local distributor, which continues to be responsible for delivering electricity to the consumption point. The difference lies in the commercial origin of the energy: the company now chooses the supplier, negotiating price, term and source. The CCEE (Electric Energy Commercialization Chamber) is the environment where these transactions are recorded and settled.
In practical terms, the quality of the physical supply remains the same. What changes is who sells the energy and at what price. Group A companies, connected at medium or high voltage, have access to this negotiation environment.

Key pain points of managers
Chief Financial Officer: unpredictability that compromises the budget
For the CFO, electricity represents a significant part of operational expenses. The main problem is cost unpredictability. Tariff flags can change the bill amount from month to month without any change in the company's consumption. This behavior hampers cash flow projections and reduces margins during periods of water scarcity.
Operations Manager: bureaucracy and perceived risk in migration
For the operations manager, the main barrier to the free energy market is the perception of complexity. Migration involves technical steps, documentation and regulatory deadlines. Concern about supply continuity is legitimate but unfounded, because the local distributor remains responsible for the physical delivery of energy, regardless of the chosen commercial supplier.
ESG Manager: need for auditable verification
Beyond financial and operational issues, sustainability gains weight in decisions. For the ESG manager, the priority is to reduce costs and verify the origin of the consumed energy. Investors, customers and regulators demand concrete evidence of decarbonization. Scope 2 emissions, arising from electricity consumption, are among the easiest to mitigate by choosing the right supplier, provided there is traceable certification.
4 practical low‑cost actions to optimize consumption now
Group A companies can reduce their energy bill with internal measures, even before deciding on the free energy market.
- Review contracted demand: contracted demand defines the power limit the company can use and is charged even if not fully utilized. Reviewing this value based on actual consumption history avoids paying for idle capacity.
- Eliminate phantom consumption: equipment in standby mode, lights on in unoccupied areas and systems operating outside operating hours consume energy without generating value. A systematic survey identifies and eliminates these sources.
- Adjust air‑conditioner temperature: climate control systems account for a significant share of consumption in commercial and industrial environments. Adjusting the operating temperature and scheduling automatic shutdowns outside business hours reduces consumption without impacting productivity.
- Replace with efficient lighting: swapping conventional bulbs for LED technology consistently reduces lighting consumption. The investment usually has a short payback period and the impact on the bill is ongoing.
These actions complement migration to the free energy market. A company that optimizes consumption before migrating arrives at the new environment with a more efficient profile and contracts better suited to its reality.
Request an analysis of your company's consumption profile with the Serena Energia team.
How the migration to the free energy market works (step by step)
Step 1: verify eligibility
The first step is to confirm that the company is in Group A, connected at medium or high voltage. There is no minimum consumption requirement. Being classified in Group A already allows access to the free energy market.
Step 2: analyze consumption profile
Mapping monthly consumption in kWh, paying attention to seasonality and demand peaks, guides the choice of contract type and the volume to be negotiated. This analysis reduces the risk of contracting too much or too little energy.
Step 3: choose a marketer and request a feasibility study
Choosing a partner with its own generation and proven track record reduces commercial risks. The feasibility study projects the expected savings based on the company's actual bills and shows whether migration makes economic sense.
Step 4: close the contract
Contracts in the free energy market are typically medium to long term, with price agreed in advance. This structure eliminates exposure to tariff flags and allows more accurate budget planning.
Step 5: conduct the migration process
The migration stage involves registration with the CCEE (Electric Energy Commercialization Chamber), adjustment of the measurement system and notification to the distributor. The regulatory deadline is six months. An experienced partner conducts this process without passing additional costs to the client under its management.
Step 6: start of supply in the free energy market
After the migration period, the company begins receiving energy from the chosen supplier, at the contract‑negotiated price, while the delivery infrastructure remains unchanged.

Step 7: continuous monitoring
Monthly monitoring of results allows comparing costs with the previous period and identifying additional efficiency opportunities. Periodic reports support decisions on contract adjustments and new consumption management actions.
Start the migration process with specialized support by speaking with the Serena Energia team.
What changes in daily operation after migration
After migration to the free energy market, the company receives two invoices: one for the energy supplied by the marketer and another for the use of the local distributor's grid. This structure follows the Brazilian regulatory model and remains simple when a partner centralizes management.
Consumption monitoring becomes part of the routine. Digital tools allow tracking actual consumption, comparing with the captive market period and anticipating adjustments. A dedicated consultant is available to clarify doubts and support decisions throughout the contract.
Proven sustainability: I-REC and carbon credits
The I-REC (International Renewable Energy Certificate) is a global certificate that auditable proves that a certain volume of energy was generated by a renewable source and injected into the electric grid. For each MWh consumed, a corresponding I-REC can be issued, which tracks the energy from the source to the final consumer.

This certificate is the main tool to zero Scope 2 emissions in sustainability reports. The I-REC is recognized by international frameworks such as the GHG Protocol and accepted by investors, customers and regulators as auditable proof of clean energy consumption.
For companies seeking to go beyond Scope 2 emissions, carbon credits from certified projects allow neutralizing other emission sources and complementing the decarbonization strategy.
Talk to a Serena Energia specialist to structure your company's renewable energy certification.
Common risks and best mitigation practices
Migration to the free energy market follows a well‑established process, but requires attention to certain points to reduce risks and capture the full economic benefit.
- Choosing a partner without its own generation: marketers that rely exclusively on spot market purchases are more exposed to price fluctuations. Partners with their own generation tend to offer greater supply stability and price formation.
- Signing a poorly sized contract: contracting volume far above or below actual consumption increases exposure to the short‑term market. Prior analysis of the consumption profile is essential for a well‑calibrated contract.
- Failing to monitor post‑migration: without continuous monitoring, consumption deviations can go unnoticed. A dedicated consultant and monitoring tools reduce this risk and support preventive adjustments.
- Underestimate the
Request a personalized risk assessment before starting your company's migration.
Summary and practical next steps
Group A companies, connected at medium or high voltage, have access to tools to reduce and control electricity costs. Energy efficiency actions, such as demand review, elimination of phantom consumption, climate control adjustments, and lighting modernization, deliver short‑term results. Migration to the free electricity market increases budget predictability. I‑REC certification turns energy consumption into an auditable sustainability asset.
To start the internal assessment, use this checklist:
- Is the company connected at medium or high voltage, in Group A?
- Have the invoices from the last 12 months been analyzed to identify consumption and demand patterns?
- Are there formal targets for reducing operational costs or CO₂ emissions?
- Has the company already evaluated the impact of tariff flags on the budget in recent years?
- Is a partner with self‑generation and proven track record being considered for the migration?
Serena Energia, one of the largest wind and solar power generators in the Americas, with over 17 years of history, offers managed migration to the free electricity market, energy consulting, and continuous management at no additional cost for clients under its management. Specialists guide the process from feasibility analysis to post‑migration monitoring.
Contact Serena Energia and take the first step to direct your energy toward your business growth.
Frequently Asked Questions (FAQ)
Does my company fall under Group A? What is the requirement to migrate to the free electricity market?
As mentioned in step 1, Group A gathers medium‑ and high‑voltage consumers, with no minimum consumption requirement. If there is doubt about the voltage level, this information appears on the electricity bill. Serena Energia conducts the eligibility analysis at no cost.
How long does the migration process take?
The regulatory process takes six months, counted from the notification to the distributor. During this period, the commercial partner carries out the bureaucratic steps mentioned in step 5, preventing the company from having to manage technical complexity.
What happens if consumption varies from the contracted volume?
Free‑market contracts provide a flexibility band for consumption variations. Volumes consumed outside this band are settled in the short‑term market. Active consumption monitoring, with support from specialized consultants, reduces this exposure and enables preventive adjustments.
What is I‑REC and how does it benefit the company’s ESG strategy?
As explained in the sustainability section, I‑REC certifies the renewable origin of each MWh consumed. In practice, the company gains auditable documentation to present to investors, customers, and regulators, proving that its electricity comes from clean sources. This resource supports ESG reporting, due‑diligence processes, and Scope 2 decarbonization goals.
How to request a proposal from Serena Energia?
The process starts with a conversation with a specialized consultant, who reviews the company’s invoices and prepares a feasibility study with projected savings. Based on this analysis, the company defines the volume to be contracted, the term, and the supply conditions. The entire migration process, after contract formalization, is carried out by Serena Energia at no additional cost to the client under its management.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *
