How to reduce waste and increase profit margin?

How to reduce waste and increase profit margin?

Written by: André Lima, Growth, Serena Energia

Main lessons from this article

  • Group A companies can reduce the energy impact on the P&L by eliminating internal technical waste and migrating to the free energy market.

  • A structured seven‑step process allows mapping consumption, identifying losses, correcting inefficiencies and achieving cost predictability within six months.

  • Migrating to the free energy market converts regulated tariffs into a contracted fixed price, increasing budgeting accuracy.

  • Maintaining continuous asset‑level consumption monitoring after migration helps align price reduction with lower volume consumed.

  • To start a free‑of‑charge feasibility analysis and understand your company’s savings potential, talk to Serena Energia.

Prerequisites and initial conditions

The process starts with organizing basic information and involving the right areas of the company.

Necessary knowledge: have basic notions of reading an electricity bill, such as contracted demand, consumption in kWh and tariff modality, as well as familiarity with the concept of OPEX.

Internal areas to involve: finance or controlling should quantify the energy impact on the P&L and assess the economic feasibility of the migration. The operations or facilities area provides consumption data by asset or sector, which are essential for waste mapping. Legal participates when there is a need to review the contract with the current distributor.

Documents to gather: energy bills from the last 12 months, current contract with the distributor, and contracted demand data compared with measured demand.

Before proceeding, it is necessary to confirm whether the company meets the eligibility criteria. Eligibility: there is no minimum consumption to migrate to the free energy market. The required condition is that the company belongs to Group A, i.e., it is served at medium or high voltage. The local distributor remains responsible for the physical delivery of electricity after the migration, and the change occurs only in the commercial and contractual sphere.

Process overview

The operational waste reduction process focused on energy follows seven structured steps: map consumption by sector and by asset, identify technical waste in assets, correct identified technical losses, analyze the feasibility of migrating to the free energy market, contract and start the migration process, monitor the transition and validate the measurement system, and monitor results to adjust consumption.

The first three stages act on internal efficiency and reduce the volume of energy consumed without the need for significant investment. The fourth and fifth stages act on the price paid per kWh consumed, converting an unstable cost into a pre‑contracted value. The sixth and seventh stages close the cycle, focusing on technical adequacy and continuous visibility of financial and operational performance.

Landscape of a renewable energy park at sunset, featuring large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the supply of the Free Market.

This chain of actions transforms energy from a poorly predictable cost line into a measurable competitiveness factor. Talk to Serena Energia to assess how this process fits your company's consumption profile.

Step‑by‑step guide

Step 1 — Map consumption by sector and by asset

Objective: create detailed visibility on where the company consumes energy.

Actions: install sub‑meters per production line, sector or critical equipment, and record readings systematically.

Responsible: operations or facilities manager.

Risk: lack of historical data makes deviation identification difficult. Mitigation: use the last 12 months' bills as a baseline, as they show the unit's total consumption and allow estimating proportional distribution by sector until sub‑meters build their own history.

Step 2 — Identify technical waste in assets

Objective: locate equipment that consumes more energy than needed for production.

Actions: focus on the most common forms of waste, such as misaligned, unbalanced and vibrating motors, pumps and fans operating outside design point, mechanical transmissions with incorrect belt tension and worn couplings, inadequate lubrication, loose electrical connections with abnormal heating, and failures in compressed air and HVAC systems. A motor operating with increasing mechanical friction or misalignment requires higher electric current to deliver the same production. In this case, waste appears as heat and vibration, not as product.

Responsible: maintenance team, supported by predictive monitoring tools.

Side profile of a worker in a wind farm, with the sun in the background and several wind turbines stretching across the horizon.
The dedication of qualified field professionals is what ensures the efficiency and constant availability of clean energy that drives our clients' businesses.

Dependency: use of data from Step 1.

Risk: assets without individual consumption history make peer comparison difficult. Mitigation: compare identical equipment operating under similar conditions to identify performance deviations.

Request a free analysis of your company's consumption profile and identify the savings potential in the free energy market.

Step 3 — Correct the identified technical losses

Objective: reduce actual consumption without affecting production capacity.

Actions: execute a corrective maintenance plan on assets with high specific consumption, measured in kWh per unit produced or per operational hour above reference. Monitor consumption by sector, production line or individual equipment to confirm waste reduction and detect new abnormal spending patterns.

Responsible: maintenance and operations teams.

Risk: poorly planned interventions can cause unplanned shutdowns. Mitigation: prioritize assets with the greatest consumption deviation and use already scheduled maintenance windows.

With internal technical waste mapped and being corrected, the next cost‑reduction lever becomes the price paid per kWh consumed. At this point, migration to the free energy market becomes the natural next step.

Step 4 — Analyze the feasibility of migrating to the free energy market

Objective: quantify the financial impact of migration on the P&L.

Actions: forward the last 12 months' bills for analysis by an experienced retailer. Serena Energia conducts this feasibility study at no cost, projects the savings and presents the contractual terms.

Responsible: CFO or controller.

Risk: analysis based on incomplete data may underestimate or overestimate savings. Mitigation: provide bills for at least 12 consecutive months.

Step 5 — Contract and start the migration process

Objective: formalize the contract and start the regulatory process.

Actions: sign a contract with the chosen retailer. Typical contracts last five years, with a pre‑agreed price. The regulatory process takes six months, counted from the notification to the distributor. Serena Energia handles the entire bureaucratic process, which includes notification to the distributor, registration with CCEE (Electric Energy Commercialization Chamber) and adaptation of the measurement system, covering the associated costs.

Responsible: finance and legal, with full support from Serena Energia.

Risk: delay in sending documentation can extend the timeline. Mitigation: designate an internal focal point to speed up information flow.

Criterion

Captive market

Free energy market (Serena Energia)

Price definition

Regulated by ANEEL, with tariff flags

Negotiated in advance in a bilateral contract

Budget predictability

Low, with adjustments and unpredictable flags

High, with fixed price for the contracted period

Process management

Company manages the relationship with the distributor

Serena Energia manages the entire process, including CCEE (Electric Energy Commercialization Chamber)

Energy source

Distributor's mix, no choice

100% renewable, with issuance of I‑RECs

Start the migration process with Serena Energia's support and structure a contract aligned with your company's consumption profile.

Step 6 — Monitor the transition and validate the measurement system

Objective: ensure that technical adaptation occurs without operational impact.

Actions: monitor the installation of measurement equipment compatible with the free energy market. Serena Energia is responsible for this installation, performs the prior technical diagnosis and carries out the necessary adaptation. Physical delivery of electricity remains the responsibility of the local distributor, with no change in supply.

Responsible: operations manager, with technical support from Serena Energia.

Risk: incompatibility of the measurement system

edição existente. Mitigation: perform early technical diagnosis and plan the adaptation in a coordinated manner with operations.

Step 7 — Monitor results and adjust consumption

Objective: verify the achieved savings and identify new efficiency opportunities.

Actions: use Serena Energia's dashboard to track monthly savings, consolidated savings, comparison between captive market and free energy market, consumption forecast and actual consumption. A dedicated consultant from Serena Energia is available for performance monitoring and to clarify doubts.

A single white wind turbine stands out amid a dense layer of fog or clouds, illuminated by the soft light of the sunset.
Advanced wind technology enables Serena Energia to capture constant winds at high altitudes, ensuring a clean, stable, and efficient energy source for your business.

Responsible: controller or facilities manager.

Risk: consumption outside the contracted range triggers settlement in the short‑term market. Mitigation: keep active consumption monitoring with Serena Energia's support and adjust the contracted profile when necessary.

Common mistakes and troubleshooting

Error 1 — Starting the analysis without sufficient historical data. Companies that submit only one or two invoices receive less accurate projections. Fix: gather at least 12 months of invoices before requesting the feasibility study.

Error 2 — Treating migration as an exclusively financial decision, without involving operations. Adapting the measurement system requires physical access to the facilities. Fix: involve the operations or facilities manager from the start of the process.

Error 3 — Delaying the decision due to perceived complexity. The regulatory process takes six months. Each month of delay adds another month of paying regulated market tariffs. Fix: start the analysis process without commitment, as the feasibility study is free.

Error 4 — Ignoring asset‑level consumption after migration. Migration reduces the price paid per kWh, but does not eliminate internal technical waste. If the consumed volume remains high, the price savings tend to be partially offset by increased consumption. Fix: keep monitoring consumption by sector and by asset alongside energy contract management, so that price reduction is accompanied by lower consumed volume.

Validation checklist before migration:

  • Invoices from the last 12 months gathered

  • Company confirmed in Group A (medium or high voltage)

  • Feasibility study completed and approved by finance

  • Operations or facilities manager informed about measurement system adaptation

  • Internal focal point designated for the migration process

Results verification and metrics

From the first invoice after migration completion, the company can already compare the actual energy cost with the previous period in the regulated market. Monthly indicators to monitor include total energy cost in reais per month, cost per kWh consumed, actual consumption versus forecasted consumption, and cumulative savings since migration.

Serena Energia's dashboard centralizes this information and allows the controller or facilities manager to track performance without relying on manual spreadsheets. Monthly review of these indicators guides internal efficiency decisions. If specific consumption per produced unit remains high after migration, focus should return to the technical waste identified in earlier steps, so that financial gain is not limited to price alone.

Companies that combine technical waste reduction with migration to the free energy market act simultaneously on consumed volume and on price paid, which are the two direct impact vectors on the energy line of the P&L.

Set up results monitoring from the first month with support from a dedicated Serena Energia consultant.

Advanced options and next steps

Companies with multiple consumer units can structure contracts that cover all Group A units under a single management. This approach simplifies financial control and expands the negotiated volume. Serena Energia serves companies throughout Brazil and can consolidate management of multiple consumption points.

For companies with public sustainability targets, migration to the free energy market with Serena Energia includes the possibility of issuing I-RECs (International Renewable Energy Certificates). These globally recognized certificates auditable prove that each MWh consumed was generated from a renewable source and are the main tool to zero Scope 2 emissions in sustainability reports.

Silhouette of several wind turbines aligned along the coast during a colorful sunset, with reflections on the water.
Exploiting natural resources, such as coastal winds, is essential to maintain the scale and sustainability needed in the Free Energy Market.

For companies that wish to neutralize emissions beyond Scope 2, Serena Energia offers access to carbon credits from certified projects, complementing the decarbonization strategy. Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂.

The next step after migration stabilization is to deepen asset‑level consumption monitoring. Continuous use of sub‑metering data allows identification of new efficiency opportunities and creates a permanent OPEX reduction cycle.

FAQ

Submit your company's consumption data to receive specific guidance before proceeding to the frequently asked questions.

Can any Group A company migrate to the free energy market?

Yes. As explained in the prerequisites section, any Group A company, served at medium or high voltage, can migrate to the free energy market, regardless of consumption volume. Serena Energia conducts the eligibility analysis for free.

How long does the migration process take?

The regulatory process takes six months, counted from the notification to the distributor, as detailed in Step 5. Serena Energia handles all documentation steps, registration with CCEE (Electric Energy Commercialization Chamber) and measurement system adaptation, covering adaptation costs. The sooner the company starts, the sooner it begins saving.

Does migration pose a risk of power supply interruption?

No. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity and grid stability. The only change concerns who supplies the energy to the company.

What happens if actual consumption falls outside the contracted volume?

Contracts provide a flexibility band for consumption. When actual consumption falls outside this band, the difference is settled in the short‑term market. Serena Energia offers active monitoring to reduce this exposure, with a dedicated consultant tracking monthly performance and suggesting adjustments to the contracted profile.

How does migration to the free energy market impact the company's ESG goals?

The energy supplied by Serena Energia is 100% wind. For each MWh consumed, the company can obtain I-RECs, traceable and globally recognized certificates that prove the renewable origin of the energy and allow declaring 100% clean consumption in sustainability reports, with Scope 2 emissions zeroed. Serena Energia also offers carbon credits to neutralize other emission sources.

Conclusion

By following this guide, the company gains control over the two vectors that determine energy's weight on the P&L: the consumed volume, reduced by eliminating technical waste in assets, and the price paid per kWh, stabilized through a free energy market contract with a pre‑agreed price.

This move generates budget predictability, OPEX reduction, and frees resources that can be directed to business growth instead of being tied to regulated market tariffs. Serena Energia, one of the largest wind and solar generators founded in the Americas, with over 17 years of history and clients such as Heineken, Cargill and Bayer, conducts this process for Group A companies with specialized structure and results focus.

Receive a personalized feasibility study for your company and plan energy cost reduction based on concrete data.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *