How to reduce logistics and energy expenses in 12 months

Written by: André Lima, Growth, Serena Energy
Main lessons from this article
-
Group A companies deal with two major cost centers, logistics and energy, which can be addressed in an integrated manner to generate savings in up to 12 months.
-
Logistics optimization starts with a detailed diagnosis of routes and costs, followed by load consolidation and the use of routing tools to reduce mileage and fuel consumption.
-
Demand management and energy contract review reduce expenses without impacting operations and lay the groundwork for migration to the free energy market.
-
The migration to the free energy market, conducted by Serena Energy, eliminates the impact of tariff flags, offers a fixed price and includes renewable certification (I-RECs) to meet ESG goals.
-
To achieve concrete and personalized results, talk to a Serena Energy consultant and discover how much your company can save by combining logistics optimization with renewable energy.
Prerequisites and initial conditions
The process starts with organizing the documentation base and aligning the involved areas. The minimum documents are: the last 12 electricity bills for each consuming unit, fleet data with vehicle type, average fuel consumption and monthly mileage, route and load records from the last six months, and the approved budget for the current fiscal year.
The areas that need to be aligned from the start are finance, operations, and sustainability. This alignment is essential because decisions made in silos tend to generate rework. A freight renegotiation that ignores CO₂ emission targets, for example, can create ESG liabilities that nullify the financial gain.
Operational constraints to map include freight contracts with exclusivity clauses, service level agreements with clients that limit delivery windows, and the current contractual term with the energy distributor, which defines the migration schedule to the free energy market.
Process overview
The integrated process is organized into seven sequential steps that connect logistics optimization to energy migration:
-
Diagnosis of logistical and energy costs
-
Route optimization and load consolidation
-
Demand management and energy consumption efficiency
-
Eligibility assessment and feasibility study for the free energy market
-
Managed migration to the free energy market with Serena Energy
-
Integrated results monitoring
-
Expansion and next steps
Steps 1 to 3 can occur in parallel and usually generate visible results in the first 90 days. Steps 4 and 5 follow a six‑month schedule. Steps 6 and 7 are continuous.
Step‑by‑step guide
Step 1 — Diagnosis of logistical and energy costs
Objective: create a quantified baseline for each cost center.
Actions: consolidate the energy bills from the last 12 months per unit and identify cost components such as active energy, contracted demand, distribution charges, and tariff flags. In parallel, map logistical costs by route, mode, and cargo type, separating fixed from variable costs.
Responsible parties: controller and operations manager.
Note: compare equivalent periods to avoid seasonal distortions. Companies with multiple units should consolidate the data into a single spreadsheet before proceeding.
Step 2 — Route optimization and load consolidation
Objective: reduce unproductive mileage and increase the utilization of each trip.
Actions: use routing tools to identify route overlaps, consolidate low‑volume deliveries into compatible time windows, and review the minimum load policy per vehicle. Load consolidation, which gathers multiple orders into a single shipment, usually generates a significant impact in operations with a high frequency of split deliveries.
Responsible parties: operations manager and logistics team.
Risks: rigid delivery windows imposed by customers can limit consolidation. Mapping these contracts before redesigning routes reduces the risk of penalties.
Note: document the fuel consumption baseline before changes to measure the real impact after implementation.
Logistics optimization yields more consistent results when connected to the company's energy strategy. Talk to our specialists to structure this integration.
Step 3 — Demand management and energy consumption efficiency
Objective: reduce energy consumption at facilities without compromising production.
Actions: review the contracted demand with the distributor, as demand above what is needed generates unnecessary charges. Identify equipment with high consumption outside peak hours and assess replacing lighting and HVAC systems with more efficient alternatives.
Responsible parties: facilities manager and operations manager.
Note: plan any adjustment to the contracted demand in advance, as contractual changes with the distributor follow specific timelines.
Step 4 — Eligibility assessment and feasibility study
Objective: confirm whether the company is eligible to migrate to the free energy market and project the expected savings.
Actions: verify whether the company belongs to Group A, with medium or high voltage supply. There is no minimum consumption to enter the free energy market; it is enough to be part of Group A. Then, request a free feasibility study from Serena Energy based on the invoices collected in Step 1.
Responsible parties: CFO and controller.
Note: companies with multiple units should evaluate each CNPJ separately, as eligibility is verified per connection point.
Step 5 — Managed migration to the free energy market with Serena Energy
Objective: complete the migration without operational impact and start saving on the energy bill.
Actions: sign the contract with Serena Energy, typically for five years, with a pre‑agreed fixed price. Initiate the managed migration process, which includes notifying the distributor, registering with the CCEE (Electric Energy Commercialization Chamber), and adapting the metering system. Serena Energy fully assumes these steps at no additional cost to the client.

The six‑month deadline to terminate the contract with the distributor is the main scheduling factor. The sooner the company starts, the sooner it begins to save.
After migration, the client receives two invoices, one for energy and another for distribution, and has a dedicated Serena Energy consultant for continuous monitoring. The local distributor remains responsible for the physical delivery of electricity, while the company negotiates price, term, and volume with Serena Energy.
For sustainability managers, Serena Energy issues I-RECs (International Renewable Energy Certificates) corresponding to consumption. These certificates audibly prove that the energy consumed is 100% renewable and support ESG reporting and Scope 2 emission reduction targets. Since 2017, Serena Energy has prevented the emission of more than 2.14 million tonnes of CO₂.

Clients such as Cargill and Bayer have already taken this path. Hamul Freitas, from Cargill, states: “The price of renewable sources is much more competitive compared to conventional sources. And the sustainability issue cannot be reversed.” Rogério Andrade, vice‑president of Product Supply at Bayer, adds: “The agreement with Serena is one of the important initiatives we are implementing to achieve our sustainability goals, aligned with the UN Sustainable Development Goals.”
Responsible parties: CFO for contract approval, operations manager for technical adaptation, and sustainability manager for certification management.
Risks: delays in delivering technical documentation can extend the migration timeline. Serena Energy guides the client at each step to reduce this risk.
Step 6 — Integrated results monitoring
Objective: measure the real impact of logistical and energy initiatives in a consolidated manner.
Actions: monitor logistical indicators monthly, such as cost per km, vehicle occupancy rate, and fuel consumption per route. Monitor energy indicators via the Serena Energy dashboard, which shows monthly bill savings, total consolidated savings, comparison between captive and free energy markets, monthly consumption forecast, and consumption to date.
Responsible parties: controller for financial consolidation and operations manager for operational metrics.
Review frequency: monthly for operational indicators and quarterly for strategic review with all involved areas.
Structured monitoring of this data becomes easier with digital tools. Request a demo of the Serena Energy dashboard to assess how to integrate this information.
Step 7 — Expansion and next steps
Objective: replicate the gains in other units and deepen the sustainability strategy.
Actions: after validating results in the pilot unit, extend the migration to the free energy market for other Group A units. Evaluate acquiring carbon credits to neutralize Scope
Ability to define the carbon credit strategy and controller for results consolidation.
Attention: the expansion to new units must follow the same diagnostic and feasibility sequence applied to the pilot unit. This repetition avoids assuming that the results will be identical without specific analysis.
Common mistakes and troubleshooting
|
Frequent error |
How to fix |
|---|---|
|
Start the energy migration without gathering the previous 12 invoices |
Request the history directly from the distributor before the first meeting with the retailer |
|
Treat logistics and energy as independent projects, without alignment between areas |
Create a multidisciplinary committee with finance, operations and sustainability from the diagnostic stage |
|
Underestimate the six-month deadline for terminating the contract with the distributor |
Start the migration process as soon as the feasibility study is approved, without waiting for the annual budget closure |
|
Redesign routes without mapping service level agreements with customers |
Review all commercial agreements before changing delivery windows or visit frequency |
|
Do not document the baseline before changes |
Record cost and consumption indicators in the month prior to the start of each initiative to allow objective comparison |
Results verification and metrics
Proof of success combines financial and operational indicators reviewed in regular cycles. On the logistics side, the key indicators are total cost per kilometer driven, average vehicle occupancy rate, and fuel consumption per ton transported. On the energy side, Serena Energia's dashboard presents in a single interface the monthly bill savings, the consolidated savings since the start of the contract, the bill breakdown with a direct comparison between captive market cost and free energy market cost, the consumption forecast for the current month, and the consumption realized up to the query date.
Monthly review of these indicators allows identifying deviations before they become budget issues. The quarterly review, with all areas involved, is the appropriate moment to adjust goals and assess expansion to new units.
For sustainability managers, the I-RECs issued by Serena Energia serve as auditable evidence of renewable energy consumption. These certificates integrate into ESG annual reports and support meeting Scope 2 emission reduction targets.

Tracking this data in a single dashboard facilitates decision making. Learn about the tool for monitoring by Serena Energia to track your savings month by month.
FAQ
Does my company need to have a minimum energy consumption to migrate to the free energy market?
No. The only requirement is to belong to Group A, with supply at medium or high voltage, as explained in Step 4. Serena Energia conducts the eligibility analysis for free.
How long does the migration to the free energy market take?
The typical timeframe is six months, which corresponds to the period required by the distributor to terminate the existing contract, detailed in Step 5. During this period, Serena Energia carries out each step, such as notifying the distributor, registering with the CCEE (Electric Energy Commercialization Chamber), and adapting the metering system, at no additional cost to the client.
Does migration to the free energy market pose any risk of supply interruption?
No. Migration is a commercial and contractual process. The local distributor maintains the physical delivery of electricity and grid stability, as described in Step 5. The company only changes who purchases the energy. Serena Energia, among the largest renewable energy generators created in the Americas, has a robust backing to meet the contracted consumption.
What is the I-REC and how does it apply to my company's sustainability goals?
The I-REC (International Renewable Energy Certificate) is a globally recognized certificate that audibly proves that a certain volume of energy was generated from a renewable source and injected into the grid. For each MWh consumed, Serena Energia can issue a corresponding I-REC. This document is one of the main tools to zero Scope 2 emissions in sustainability reports and meet the demands of investors, customers, and regulators.
How to integrate logistics and energy results into a single report for the board?
The most efficient way is to consolidate logistical indicators, such as cost per km, occupancy rate, and fuel consumption, with data from Serena Energia's dashboard, such as monthly savings, consolidated savings, and comparison between captive market and free energy market, into a management spreadsheet reviewed monthly. This integrated view allows the CFO and controller to present the total impact of the initiatives in a single line of the P&L, which facilitates decision making and communication with the board.
Closing
Group A companies that follow this integrated roadmap achieve two simultaneous results. The first is the reduction of logistical operational costs through more efficient routes and more consolidated loads. The second is energy cost predictability through fixed-price contracts in the free energy market, without tariff flags and with renewable certification included.
The up-to-12-month timeframe becomes feasible because logistical initiatives generate results in the first 90 days, while the energy migration, which takes six months by schedule, progresses in parallel. The result is a more predictable budget, better protected margins, and an auditable sustainability portfolio for stakeholders and investors.
Serena Energia, with over 17 years of history and clients such as Cargill, Heineken, and Bayer, conducts the entire migration process to the free energy market at no additional cost, with a dedicated consultant and a digital dashboard for continuous monitoring of savings.
Talk to one of our consultants and take the first step to reduce logistics and energy expenses in your company within up to 12 months.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *
