How to Reduce OPEX with Energy in Industry: 12-Month Guide

Written by: André Lima, Growth, Serena Energia
Key takeaways from this article
-
Electricity represents one of the largest operating costs for Group A industries in Brazil, with strong price fluctuations over time. Migrating to the free electricity market is a direct strategy to increase financial predictability.
-
A structured five‑step roadmap over 12 months allows measurable reduction of energy OPEX, with visible results between six and twelve months after the process starts.
-
Combining migration to the free electricity market, demand optimization and operational efficiency can generate savings of up to 20% compared to the captive market, as well as enable 100% renewable certification via I‑RECs.
-
Involving finance, operations, facilities and ESG areas from the start, as well as gathering the necessary documents, reduces delays and rework during migration.
-
To start your company's energy diagnosis at no cost, talk to a Serena Energia consultant.
Prerequisites to start
The first step is to gather three essential documents: the electricity bills from the last 12 months, the load curve of the consuming unit, and the record of contracted demand with the local distributor. The bills show the cost history and seasonal patterns. The load curve indicates at which times the plant consumes the most electricity. The contracted demand record reveals whether the current contract is oversized or undersized. Together, these data allow you to size the contract in the free electricity market accurately and identify savings opportunities from the outset.
Internal alignment among finance, operations, facilities and ESG needs to happen early. Migration involves contractual decisions, technical adjustments and impacts on sustainability reporting. The earlier these teams are involved, the lower the risk of delays and later revisions.
Regarding eligibility, there is no minimum consumption to migrate. The only requirement is that the company belongs to Group A, i.e., its supply is medium or high voltage. The eligibility analysis is free.
Overview of the 5‑step process
The 12‑month roadmap is organized into five sequential steps, each with defined objectives, actions and owners:
-
Step 1 – Diagnosis and eligibility: map the consumption profile and confirm migration feasibility.
-
Step 2 – Migration to the free electricity market: execute the contractual and regulatory process to exit the captive market.
-
Step 3 – Consumption and demand optimization: adjust contracted demand and eliminate waste identified in the diagnosis.
-
Step 4 – Operational efficiency implementation: apply technical measures that reduce the plant’s actual energy consumption.
-
Step 5 – Continuous monitoring and sustainability certification: track indicators, adjust contracts and issue renewable energy certificates.
Request a personalized analysis of your consumption profile and start the diagnosis at no cost.
Step 1 – Diagnosis and eligibility
Objective: understand the current consumption profile and confirm the technical and financial viability of migration.
Actions: collect bills from the last 12 months, map the monthly and hourly load curve, identify demand peaks and seasonality, request eligibility analysis from an experienced retailer.
Internal owners: Facilities manager and controller.
Dependencies: access to the distributor’s metering system and complete billing history.
Risks: incomplete data or inconsistent bills can distort the savings projection. Validate each bill before proceeding.
Step 1 Checklist:
-
☐ 12 electricity bills collected and organized
-
☐ Load curve exported from the distributor’s system
-
☐ Contracted demand recorded
-
☐ Group A confirmed (medium or high voltage)
-
☐ Eligibility analysis requested
Step 2 – Migration to the free electricity market
Objective: formalize the exit from the captive market and begin renewable energy supply under a contracted price.
Actions: choose a retailer with own generation and proven track record, sign the supply contract—usually for a five‑year term—initiate the migration process, which includes notifying the distributor, registering with CCEE (Electric Energy Commercialization Chamber) and adapting the metering system.

Internal owners: CFO, for contract approval, and Facilities manager, for technical adaptation.
Dependencies: six‑month period to terminate the contract with the distributor. Early planning defines the timeline for the start of savings.
Risks: contracting a retailer without own generation increases the risk of supply issues. Companies without own generation rely entirely on third parties to honor contracts.
|
Evaluation criterion |
Captive market |
Free electricity market (Serena Energia) |
|---|---|---|
|
Price predictability |
Subject to annual adjustments and tariff flags |
Fixed price contracted in advance |
|
Energy source |
No indication of renewable source |
100% wind, with I‑REC certification available |
|
Process management |
Managed by the distributor |
Managed by Serena Energia, at no additional cost |
|
Potential savings |
Reference: regulated tariff by ANEEL |
Up to 20% versus the captive market* |
*Data provided by Serena Energia based on its client portfolio.
With migration underway and renewable energy supply contracted, the next step is to adjust consumption and demand to eliminate unnecessary costs identified in the diagnosis.
Step 3 – Consumption and demand optimization
Objective: align contracted demand with actual consumption and eliminate waste identified in the diagnosis.
Actions: compare contracted demand with measured demand over the last 12 months to identify oversizing. Then map peak hours, and when demand concentrates in specific periods, redistribute loads to reduce the peak without affecting production. With these adjustments defined, review the demand contract with the local distributor to formalize the new demand.
Internal owners: Operations manager and Facilities manager.

Dependencies: hourly measurement data available after the metering system adaptation performed in Step 2.
Risks: oversized demand generates unnecessary costs. Undersized demand can result in contractual penalties. The review must consider at least 12 months of historical data.
Step 3 Checklist:
-
☐ Measured demand compared with contracted demand month by month
-
☐ Peak hours mapped
-
☐ Load redistribution evaluated with the operations team
-
☐ Demand contract review scheduled
Step 4 – Operational efficiency implementation
Objective: reduce the plant’s actual energy consumption through technical measures with measurable impact.
Actions: conduct an audit of compressed‑air systems to identify and repair leaks, assess the installation of variable‑frequency drives on large‑capacity motors, implement predictive maintenance based on continuous monitoring of critical equipment.
Internal owners: Operations manager and maintenance team.
Dependencies: access to equipment and availability of scheduled maintenance windows.
Risks: implementing measures without a consumption baseline makes result measurement difficult. The diagnosis from Step 1 is the reference point for comparison.
|
Measure |
Application area |
Impact reference |
Typical implementation timeframe |
|---|---|---|---|
|
Detection and repair of compressed‑air leaks |
Compressed‑air systems |
Reduction of 5 to 10% in energy consumption in monitored equipment |
3 to 6 months |
|
Alignment correction and heat exchanger cleaning |
Pumps and cooling systems |
Ad hoc, as per inspection |
Step 5 – Continuous monitoring and sustainability certification
Objective: monitor financial and operational results, adjust contracts when necessary and formalize the sustainability commitment with auditable certification.
Actions: monitor monthly the actual consumption compared to contracted consumption, compare current invoices with the captive market history, request issuance of I-RECs (International Renewable Energy Certificates) corresponding to the consumption, include the certificates in the company's sustainability reports.

Internal responsible parties: controller, ESG manager and Facilities manager.
Dependencies: access to the marketer's monitoring dashboard and measurement data from CCEE.
Risks: lack of active monitoring may miss consumption deviations that generate costs in the short‑term market.
Recommended indicators:
-
Monthly: actual consumption (MWh), cost per MWh, deviation from contracted, accumulated savings compared to the captive market.
-
Quarterly: I-RECs issued, tonnes of Scope 2 CO₂ offset, review of contracted demand.
Common mistakes and how to fix
Frequent mistakes:
-
Starting the process without gathering the invoices from the last 12 months, which compromises the savings projection.
-
Ignoring the six‑month deadline for terminating the contract with the distributor, which delays the start of savings.
-
Not involving operations and ESG areas from the diagnosis, which creates rework in later stages.
-
Implementing efficiency measures without a consumption baseline, making it impossible to measure results.
-
Hiring a marketer without checking if they have their own generation and a track record of managing large clients.
How to fix:
-
Use validation checklists at the end of each stage before moving to the next, to reduce information gaps.
-
Assign an internal owner per stage with a defined deadline, to keep the schedule under control.
-
Request a detailed schedule from the marketer with milestones and clear responsibilities, to align expectations.
-
Record the baseline consumption before any technical intervention in the plant, to compare results objectively.
How to verify the results?
Comparing the invoices from the period in the captive market with the invoices after migrating to the free energy market is the most direct evidence of result. This comparison must consider the same period of the year to reduce seasonal distortions.

The load curve before and after operational efficiency measures complements this analysis and shows the real consumption reduction. For the sustainability dimension, the I-RECs issued by the marketer serve as an auditable document that proves 100% renewable energy consumption, essential for ESG reports and for offsetting Scope 2 emissions.
Recommended KPIs by dimension:
-
Financial: total energy cost (R$/MWh), accumulated savings compared to the captive market, demand deviation.
-
Operational: actual consumption compared to contracted, unplanned maintenance hours, availability of critical equipment.
-
Sustainability: I-RECs issued (MWh), tonnes of Scope 2 CO₂ offset, carbon credits used.
Set up your monitoring dashboard and track results from the first month.
Advanced options
Centralizing energy management of multiple consumer units under a single contract simplifies tracking and increases the negotiated volume. This multi‑site approach allows standardizing monitoring and sustainability reporting processes across all plants.
Integrating the energy contract with energy management systems, such as Energy Management Systems, enables cross‑referencing real‑time consumption data with plant operational indicators. This integration creates a stronger basis for efficiency decisions.
For companies with public decarbonization targets, combining I-RECs with carbon credits from certified projects allows moving beyond Scope 2 and also consider Scope 1 and 3 emissions. Related topics for deeper study include Scope 2 management in GRI reports, renewable energy procurement strategies for SBTi targets, and integration of energy data into corporate ESG platforms.
Frequently asked questions
Does my company need a minimum consumption to migrate to the free energy market?
As mentioned in the prerequisites, there is no minimum consumption, only the need to belong to Group A, with medium or high voltage supply. The eligibility analysis can be requested at any time at no cost.
How long does the migration process take?
The regulatory process takes six months, as explained in Step 2, due to the contractual termination deadline with the local distributor. During this period, the responsible marketer carries out the bureaucratic steps, including registration with CCEE (Electric Energy Commercialization Chamber) and measurement system adaptation. At Serena Energia, this entire process is managed at no additional cost to the client.
Does the migration pose any risk to plant operation?
Migration is a contractual process. The local distributor remains responsible for the physical delivery of energy and grid stability. No supply interruption occurs during the process. The only change is the supplier with whom the company negotiates the energy price.
What is the I-REC and how is it used in sustainability reports?
The I-REC (International Renewable Energy Certificate) is a traceable digital certificate that proves a certain volume of energy was generated from a renewable source and consumed by the company. This certificate is globally recognized and used to declare clean energy consumption in sustainability reports, offsetting Scope 2 emissions. Serena Energia issues I-RECs corresponding to each client’s consumption.
How does billing work in the free energy market?
In the retail model, the company receives two invoices, one for the energy contracted with the marketer and another for the use of the local distributor’s grid. Serena Energia centralizes the management of this process, including the relationship with the distributor, and the client has the support of a dedicated consultant to monitor contract performance monthly.
Conclusion
By following this 12‑month roadmap, the industrial manager gains clarity on each step of the process: from the initial diagnosis to sustainability certification, through migration to the free energy market and operational efficiency measures in the plant. The result is a more predictable energy cost structure, with financial, operational and ESG metrics measurable from the first months.
Serena Energia, with over 17 years of history and among the largest wind and solar generators created in the Americas, manages the entire process, from eligibility analysis to continuous monitoring, at no additional cost for companies under its management.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *