How to reduce OPEX with energy in the industrial sector?

Written by: André Lima, Growth, Serena Energia
Key takeaways from this article
-
Group A industries can migrate to the free energy market without a minimum consumption, reducing exposure to annual adjustments and tariff flags.
-
Following 7 steps, from eligibility analysis to I-REC issuance, enables a structured migration with no additional cost in the consulting stage.
-
Signing long‑term contracts with fixed price increases budget predictability and can generate savings of up to 20% compared to the regulated market.
-
Conducting monthly monitoring via digital dashboard and managing contractual flexibility helps avoid consumption deviations and extra costs in the short‑term market.
-
With Serena Energia, your industry accesses certified renewable energy, reduces OPEX and has specialized support throughout the migration process.
Prerequisites: who can migrate and which documents are required
The fundamental requirement to migrate to the free energy market is belonging to Group A, which includes consumers served at medium or high voltage. There is no minimum consumption: any Group A company is eligible.
The typically required documents and information include: energy bills from the last 12 months, contracted demand data, monthly consumption in kWh, CNPJ and corporate documentation, and technical information about the connection point with the distributor.
With these documents in hand, Serena Energia performs the eligibility analysis for free and conducts the entire migration process at no additional cost to the client.
Overview of the process in 7 macro steps
The logical migration sequence starts with eligibility verification, moves to choosing the retailer, registering with CCEE (Electric Energy Commercialization Chamber), negotiating and formalizing the contract, adapting the measurement system, starting supply, and reaches continuous monitoring with renewable energy certificate issuance.
Each step is detailed below in an operational step‑by‑step.
Step‑by‑step: how to migrate to the free energy market
Step 1: verify eligibility and analyze consumption profile
Objective: confirm that the company belongs to Group A, at medium or high voltage, and map the monthly consumption pattern, seasonality and demand peaks.
Actions: gather invoices from the last 12 months, identify contracted demand versus measured demand and calculate average consumption in MWh.
Internal responsible: facilities manager or controller.
Attention point: consumption with high seasonality requires a contract with appropriate flexibility. Having this precise mapping reduces exposure to the short‑term market.
Step 2: choose an experienced retailer
Objective: select a partner that offers own generation, complete regulatory management and technical support, reducing migration risks.
Actions: assess the retailer's history, own generation capacity, client portfolio and post‑migration management model.
Internal responsible: CFO or operations director, with legal support.
Attention point: a company without its own generation depends on purchasing energy from third parties, which can represent a higher supply risk. Serena Energia is among the largest wind and solar generators in the Americas, with over 17 years of operation and clients such as Heineken, Cargill and Bayer.

Step 3: register with CCEE (Electric Energy Commercialization Chamber) and adapt the measurement
Objective: enable the company as an agent of the free energy market and install a billing measurement system compatible with hourly measurement.
Actions: send technical, legal and financial documentation to CCEE (Electric Energy Commercialization Chamber) and install hourly measurement equipment.
Internal responsible: facilities or engineering manager, with retailer support.
Attention point: Serena Energia conducts the entire process and is responsible for installing the measurement equipment.
Step 4: negotiate and formalize the contract
Objective: define price, term, volume and contractual flexibility, ensuring cost predictability for the agreed period.
Actions: analyze the commercial proposal, verify consumption flexibility clauses, usually between 5% and 10% of the contracted volume, and formalize the bilateral contract.
Internal responsible: CFO, legal and operations director.
Attention point: long‑term contracts, typically 3 to 5 years, with fixed price reduce the impact of tariff flags and allow more precise budget planning.
Find out in minutes how much your industry can save with renewable energy
Step 5: migrate and start supply
Objective: complete the operational transition and start receiving energy under the new contract.
Actions: notify the local distributor with the legal notice period, complete technical adjustments and activate the contract with CCEE (Electric Energy Commercialization Chamber).
Attention point: the regulatory process takes 6 months. The local distributor remains responsible for the physical delivery of energy, the wires and network quality. The migration represents a commercial change: the company starts buying energy from a retailer, but the distributor remains the provider of the distribution service.
Step 6: monitor monthly via digital dashboard
Objective: monitor actual consumption, consolidated savings and consumption forecast to identify deviations and opportunities.
Actions: access the Serena Energia dashboard to check monthly bill savings, total accumulated savings, comparison between captive and free energy markets and consumption forecast.
Internal responsible: controller or facilities manager.
Attention point: continuous monitoring can help reduce operational costs. The Serena Energia dashboard provides this visibility without additional load for the internal team.
Step 7: issue renewable energy certificates (I-RECs)
Objective: document clean energy consumption for sustainability reports and ESG target compliance.
Actions: request Serena Energia to issue the I-RECs corresponding to the period's consumption and incorporate the certificates into Scope 2 reports.
Internal responsible: ESG manager or sustainability director.
Attention point: the I-REC is a traceable global certificate that audibly proves that each MWh consumed was generated from a renewable source. This instrument is internationally recognized to zero Scope 2 emissions.

With the 7 steps mapped, it is worth consolidating the structural differences between the two models. The table below summarizes the criteria that justify the migration.
Comparison: free energy market vs. captive market
|
Criterion |
Captive market |
Free energy market with Serena Energia |
|---|---|---|
|
Supplier choice |
No, local distributor mandatory |
Yes, company chooses the retailer |
|
Energy price |
Regulated by ANEEL, with tariff flags |
Fixed in long‑term bilateral contract |
|
Budget predictability |
Low, annual adjustments and unpredictable flags |
High, price agreed in advance |
|
Potential savings |
Market reference |
Up to 20% compared to the regulated market |
|
Certified renewable energy |
No source traceability |
Wind energy with I-REC issuance |
|
Process management |
Passive, company receives defined tariff |
Active, Serena Energia manages everything with no additional cost in the consulting stage |
|
Physical energy delivery |
Local distributor |
Local distributor, unchanged |
Common mistakes when reducing OPEX with energy and how to avoid them
Imprecise consumption planning: underestimating seasonality leads to deviations from the contracted volume, with settlement in the short‑term market. The solution is to map 12 months of history before defining the contract volume.
Lack of alignment between finance and operations: when the CFO decides without involving the operations director, flexibility clauses may not reflect the plant's production reality. Both areas need to validate the contract together.
Underestimating the importance of contractual flexibility: contracts without adjustment margin expose the company to additional costs during production variation periods. Checking tolerance ranges, usually between 5% and 10%, is a mandatory step. in the negotiation.
Neglecting monthly monitoring: without regular tracking, consumption deviations go unnoticed and adjustment opportunities are missed. To avoid this mistake, Serena Energia's digital dashboard provides continuous visibility on consumption and savings, allowing real‑time deviation identification without additional operational load for the internal team.
How to verify the results and confirm the savings?
The most direct comparison is between the cost per MWh in the regulated market, including tariff flags from the previous period, and the fixed price contracted in the free energy market. Serena Energia's dashboard presents this comparison monthly, with consolidated savings accumulated since the start of the contract.
The monthly review routine should include checking actual consumption versus forecast, analyzing the distributor's invoice—which still exists because it is responsible for the physical delivery of energy—and Serena Energia's invoice, as well as updating consumption projections for the following months.
A Serena Energia consultant monitors this process and is available for support.
Advanced options for industries with multiple sites or ESG goals
Industries with multiple consumer units can aggregate the consumption of different plants into a single contract, simplifying management and increasing bargaining power. Serena Energia serves companies across Brazil and structures contracts for multiple supply points.
For companies with public decarbonization targets, issuing I‑RECs for each MWh consumed allows declaring 100% renewable consumption in reports aligned with global standards. Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂.
In addition to I‑RECs, the company offers carbon credits to neutralize Scope 1 and 3 emissions, completing the sustainability strategy.

Combining a renewable energy contract with continuous monitoring also creates a database for energy efficiency projects, identifying equipment and shifts with higher relative consumption.
Frequently asked questions about OPEX reduction with energy
Does my company need a minimum consumption to migrate to the free energy market?
No. As explained in the prerequisites section, you just need to belong to Group A. Serena Energia conducts the eligibility analysis for free.
How long does the migration process take?
The regulatory process takes 6 months, the time needed to terminate the contract with the distributor. Serena Energia handles all bureaucratic steps. The sooner the company starts, the sooner it begins saving.
Does the local distributor stop being responsible for energy delivery after migration?
No. As explained in Step 5, the distributor remains responsible for the physical infrastructure. Migration only changes from whom the company purchases the energy, not who delivers it.
What happens if my company consumes more or less than contracted?
Contracts provide a flexibility band, usually between 5% and 10% of the contracted volume. Consumption outside this band is settled in the short‑term market. Serena Energia offers active management to reduce this exposure, with consumption monitoring and support for adjustments.
How do I‑RECs work in practice for ESG reporting?
For each MWh consumed, Serena Energia can issue an I‑REC, a traceable digital certificate recognized globally that verifies the renewable origin of the energy.
This document is the standard instrument to offset Scope 2 emissions in sustainability reports and meet the requirements of investors, customers, and international regulators.
Conclusion: summary of benefits and next step
Migrating from the regulated market to the free energy market reduces exposure to annual adjustments and tariff flags that make financial planning imprecise.
Migration with Serena Energia delivers three concrete results: cost predictability with a fixed price in a long‑term contract, savings of up to 20% compared to the regulated market, and renewable energy with I‑REC issuance for ESG goals.
The process is fully managed by Serena Energia, from registration with CCEE (Electric Energy Commercialization Chamber) to the installation of measurement equipment, as detailed in the previous sections. After migration, a dedicated consultant and a digital dashboard maintain visibility on consumption and savings month by month.
Contact Serena Energia and redirect your energy toward your business growth.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor