SERENA
Back to Blog
All articles • 14/06/2026

How to reduce OPEX with the free energy market?

How to reduce OPEX with the free energy market?

Written by: André Lima, Growth, Serena Energia

Key takeaways of this article

  • Companies in Group A can migrate to the free energy market without a minimum consumption, provided they are connected at medium or high voltage.
  • The full migration process takes about six months and makes energy cost a more predictable and controlled expense.
  • Conducting a detailed consumption profile analysis and choosing a retailer with its own renewable generation are factors that increase the savings potential.
  • In addition to OPEX reduction, migration enables renewable energy certification via I-RECs, which contributes to ESG goals and investor requirements.
  • To start your journey of energy savings and predictability, contact Serena Energia.

Prerequisites and initial conditions

The first step is to confirm that the company belongs to Group A, i.e., receives energy at medium or high voltage. There is no minimum consumption required: simply falling within this voltage range grants access to the free energy market.

From a documentation standpoint, the company needs to gather the energy invoices from the last 12 months, the current demand contract with the distributor, and the technical data of the installed metering system. This data allows mapping the consumption profile, identifying seasonality, and sizing the contract in the free energy market more accurately.

Migration requires coordination among three internal areas. Finance or controlling conducts the feasibility analysis and contract approval. Operations or facilities oversees the metering system adaptation and checks whether the equipment meets CCEE (Electric Energy Commercialization Chamber) requirements. When applicable, the ESG or sustainability area defines renewable energy certification requirements that influence the choice of retailer. Since each area contributes critical information for the others' decisions, alignment from the start prevents delays and rework in subsequent stages.

Process overview

Migration to the free energy market follows four macro-steps that together make energy cost a more controlled and predictable expense.

The first step is the feasibility analysis, with profiling consumption, projecting savings, and defining the most suitable contract model. The second is contractual formalization, with signing the contract with the retailer and starting the notification process to the distributor. The third is operational migration, with registration at CCEE (Electric Energy Commercialization Chamber), metering system adaptation, and termination of the regulated contract. The fourth is continuous management, with monthly consumption monitoring, representation before the CCEE, and issuance of renewable energy certificates. Each phase directly contributes to the final goal of OPEX reduction and financial predictability. The following sections detail each of these steps, with internal owners, dependencies, and attention points.

Step-by-step guide

Step 1: verify eligibility

The starting point is to confirm the consumer unit's eligibility in Group A. Then, gather the invoices from the last 12 months to identify the consumption pattern and contracted demand. Serena Energia performs this analysis free of charge and presents a feasibility study with the projected savings in the free energy market.

Internal owner: finance or controlling. Dependency: access to invoices and the contract with the distributor. Attention point: units with a very irregular consumption profile may require a more detailed analysis before defining the volume to contract.

Step 2: analyze consumption profile

The monthly mapping of consumption in kWh reveals seasonality, demand peaks, and opportunities for contract adjustment. This analysis guides the choice of contract type and the volume of energy to be negotiated. In the retail model, recommended for most Group A companies, the client does not purchase a fixed volume of energy but sets the price they will pay, and the monthly invoice results from multiplying that price by the actual consumption.

Internal owner: operations or facilities, with support from finance. Dependency: historical consumption data available on the invoice or in the metering system.

Talk to one of our consultants to receive a free analysis of your consumption profile.

Step 3: choose the retailer and formalize the contract

Choosing the retailer defines the level of security and quality of the entire journey. A company with its own renewable energy generation offers greater supply solidity than companies that merely connect businesses to the free energy market. Serena Energia is among the largest wind and solar generators in the Americas, with over 17 years of history and clients such as Heineken, Cargill, and Bayer. Contracts typically have a five-year term, with price agreed in advance, which eliminates the uncertainty of tariff flags.

Landscape of a renewable energy park at sunset, showing large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the Free Market supply.

Step 4: register the company in the CCEE

Registration in the CCEE (Electric Energy Commercialization Chamber) is mandatory to participate in the free energy market. The process involves submitting technical, legal, and financial documentation. Serena Energia conducts this process at no additional cost to the client, representing the company before the regulator in the retail model.

Internal owner: operations, with support from Serena Energia. Dependency: technical documentation of the consumer unit and the company's registration data.

Step 5: adapt the metering system

Hourly metering is mandatory in the free energy market. Serena Energia installs compatible equipment at no additional cost to the client. This step runs in parallel with the registration process and does not interrupt energy supply.

Internal owner: operations or facilities, to enable access to the metering point. Risk: delays in granting site access may impact the overall schedule.

Step 6: terminate the regulated contract and start free supply

Notification to the distributor requires a legal period of six months. Serena Energia manages this process from the start and monitors compliance with all deadlines. After this period, the company begins receiving energy in the free energy market, with the local distributor retaining responsibility for the physical delivery of electricity. The client receives two invoices: an energy invoice issued by Serena Energia, and a distribution invoice issued by the local distributor. Serena Energia centralizes management and provides continuous support through a dedicated consultant.

Silhouette of several wind turbines aligned along the coast during a colorful sunset, with reflections on the water.
Exploiting natural resources, such as coastal winds, is essential to maintain the scale and sustainability required in the Free Energy Market.

Talk to one of our consultants and start the migration process today.

Step 7: monitor results and continuously adjust

Monthly monitoring of results after migration allows comparing costs with the period in the regulated market and identifying adjustment opportunities. Serena Energia provides a digital dashboard with monthly savings, consolidated savings, comparison between regulated and free energy markets, consumption forecast, and actual consumption.

Common mistakes and troubleshooting

The most frequent planning error is underestimating the six-month period required to terminate the contract with the distributor. Companies that start the process without considering this horizon miss out on months of savings that could have occurred earlier.

In the documentation, the lack of complete invoices from the last 12 months or technical data of the metering system delays the feasibility study and CCEE registration. A document checklist should be validated before the formal start of the process: recent invoices, demand contract, CNPJ and corporate documents, as well as technical data of the consumer unit.

In cross‑area alignment, the lack of finance involvement in technical steps or operations involvement in contractual steps generates rework and delays. Decisions made without participation from all areas need to be revisited when conflicts arise between financial viability and operational capacity. To avoid this cycle, the company should designate an internal focal point that connects the involved areas and keeps the schedule updated, ensuring each decision considers the constraints of all parties from the start.

Finally, contracting an energy volume far from actual consumption exposes the company to the short‑term market, where prices may be higher or lower than the contracted price. A detailed consumption profile analysis, performed before signing the contract, is the main preventive measure.

Results verification and metrics

Confirmation that the migration was executed correctly appears in objective evidence: receipt of the two invoices, energy and distribution, absence of tariff flag charges on the energy invoice, and active registration of the company in the CCEE.

The main monthly operational indicators are actual consumption versus forecasted consumption, deviation from the contracted volume, and any short‑term market adjustments. Financial indicators include total energy cost, summing the energy invoice and distribution invoice, compared to historical cost in the regulated market, as well as the accumulated savings since migration.

For companies with ESG goals, the additional indicator is the volume of I‑RECs issued relative to total consumption, which documents the proportion of consumption covered by certified renewable energy. Review of these indicators should occur monthly, with a deeper analysis every 12 months to assess alignment between contracted volume and actual consumption profile.

Advanced options and next steps

Companies with multiple consumer units can consolidate energy management into a single contract or structure contracts per unit, according to each site's consumption profile. Serena Energia offers support for multisite scenarios, analyzing

assesses the feasibility of each unit and proposes the most efficient contractual structure.

For companies with public decarbonization targets, the combination of wind energy with the issuance of I-RECs (International Renewable Energy Certificates) enables auditable documentation of renewable energy consumption. Each I-REC represents 1 MWh of renewable energy generated and contains production metadata such as technology, location, and timestamp, which enable Scope 2 emissions reduction statements under standards like GHG Protocol, CDP, RE100, and SBTi. This certification meets the requirements of institutional investors with ESG mandates and strengthens the company's position in due‑diligence processes and sustainability reporting.

Aerial view of a vast solar plant with long rows of photovoltaic panels capturing the sunset light.
The use of large‑scale solar plants allows capturing energy with maximum efficiency, optimizing credits that drastically reduce the fixed costs of partner companies.

Global trends in 2026 indicate accelerated growth in energy demand due to the expansion of digital infrastructure and data centers. This scenario reinforces the importance of long‑term fixed‑price contracts to protect operating budgets from short‑term market fluctuations. Energy storage solutions and flexible demand management also gain relevance as complements to the contract in the free energy market, especially for operations with concentrated consumption peaks.

Frequently Asked Questions

Does my company need a minimum consumption to migrate to the free energy market?

No. There is no minimum consumption to access the free energy market. The only requirement is that the company belongs to Group A, i.e., receives energy at medium or high voltage. Serena Energia conducts the eligibility analysis for free.

How long does the migration process take?

The regulatory process takes six months, which corresponds to the legal deadline required to terminate the contract with the distributor. Serena Energia handles all stages of this process at no additional cost to the client. Therefore, the sooner the company starts, the sooner it begins to capture savings.

Does the migration pose any risk to the energy supply?

No. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity and for the quality and stability of the grid. The only change is who the company purchases the energy from. Supply is not interrupted at any stage of the process.

What happens if my company consumes more or less than contracted?

Free‑market contracts provide a flexibility band, usually between 5 % and 10 % of the reference volume. Consumption outside this band is settled in the short‑term market. Serena Energia offers active management to reduce this exposure, monitors consumption monthly, and advises adjustments when needed.

How do I-RECs contribute to my company's ESG goals?

The I‑REC is a global certificate that audibly proves that 1 MWh of energy was generated by a renewable source. By acquiring I‑RECs together with the contracted energy, the company can declare that its electricity consumption is 100 % renewable in sustainability reports, meeting standards such as GHG Protocol, CDP, RE100, and SBTi. This document is recognized by institutional investors and global regulators as verifiable evidence of Scope 2 emissions reduction.

Closing

Migrating to the free energy market is a direct path to turning unpredictable energy costs into a more controlled, predictable OPEX line aligned with the company's sustainability goals. The process involves clear steps, defined timelines, and responsibilities that Serena Energia assumes entirely, from feasibility study to monthly results monitoring, at no additional cost to the client.

With the solidity of a nationally present generator and a portfolio that includes large corporations, Serena Energia provides the expertise that CFOs, Controllers, Operations Managers, and ESG Leaders need to make this decision with confidence.

Talk to one of our consultants and take the first step to direct your energy budget toward business growth.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *