How to reduce OPEX with the free energy market: 2026 guide

How to reduce OPEX with the free energy market: 2026 guide

Written by: André Lima, Growth, Serena Energia

Main lessons from this article

  • Group A companies can reduce OPEX by migrating to the free energy market, eliminating the uncertainty of tariff flags and increasing budget predictability.

  • The migration process follows five structured steps: feasibility analysis, contracting, migration, continuous management, and monitoring, with a regulatory deadline of six months.

  • Gather the complete consumption history, involve internal areas from the start, and choose partners with own generation to reduce contractual and supply risks.

  • After migration, continuous monitoring via a digital dashboard allows you to verify monthly savings, compare with the captive market, and adjust the contract based on real data.

  • To start your migration and simulate the discount in the free energy market, contact Serena Energia.

Overview of the process in 5 macro steps

Reducing OPEX with energy in the free energy market requires a structured process. Migration follows five main steps: feasibility analysis, contracting, migration, continuous management, and results monitoring. Each step has defined owners, predictable timelines, and risks that can be controlled when the company works with an experienced partner.

Serena Energia conducts this process for clients under its management, from the initial analysis to representation before the CCEE (Electric Energy Commercialization Chamber) in the retail model.

Anyone who wants to assess the potential savings can simulate the migration and the discount in the retail model.

Prerequisites to start the migration

Organizing documentation and aligning internal areas speeds up migration and reduces rework. The table below summarizes the essential items.

Item

Description

Responsible area

Status

Recent invoices

Last 12 electricity invoices

Finance / Facilities

☐ Collected

Consumption data (kWh/month)

Monthly history with seasonality

Operations / Engineering

☐ Collected

Contracted demand (kW)

Value recorded in the contract with the distributor

Facilities / Engineering

☐ Verified

CNPJ and legal documentation

Articles of incorporation, powers of attorney, and legal representatives

Legal

☐ Available

Voltage level

Confirmation of supply at medium or high voltage (Group A)

Engineering / Facilities

☐ Confirmed

Internal alignment

Approval from Finance, Operations and ESG

Board

☐ Approved

The energy meter of the consuming unit must meet the free energy market standard, with hourly measurement. To meet this technical requirement, Serena Energia is responsible for installing the measurement equipment at no additional cost to the client.

Step‑by‑step: how to reduce OPEX with the free energy market

Step 1: feasibility analysis

Goal: confirm eligibility, map consumption profile, and project potential savings.

The company shares the invoices from the last 12 months and demand data with the chosen retailer. Serena Energia analyzes seasonality, demand peaks, and consumption patterns to present a detailed study. There is no minimum consumption to enter the free energy market; the company only needs to belong to Group A, with supply at medium or high voltage.

Note: companies with irregular consumption or multiple units at different voltages must map each delivery point separately before proceeding.

Step 2: contracting

Goal: formalize the energy supply contract with a pre‑agreed price.

In Serena Energia’s retail model, the client does not purchase a fixed volume of energy but defines the price they will pay per kWh consumed. Contracts typically have a five‑year term, which reduces tariff‑flag uncertainty and allows more accurate budget planning. Serena Energia handles the legal and financial documentation required for registration with the CCEE (Electric Energy Commercialization Chamber).

Note: carefully read the contractual flexibility clauses, which define the consumption variation range allowed without exposure to the short‑term market.

Step 3: migration

Goal: execute the operational and regulatory transition without impacting supply continuity.

This step includes formal notification to the local distributor, registration with the CCEE (Electric Energy Commercialization Chamber), meter system adaptation, and billing flow configuration. The regulatory deadline is six months from the notification to the distributor. Serena Energia manages these steps at no additional cost.

Note: physical energy delivery remains the responsibility of the local distributor. Migration is a commercial and contractual process, with no risk of supply interruption.

Companies that want to detail this process can understand how Serena Energia conducts a risk‑free migration.

Step 4: continuous management

Goal: maintain regulatory compliance, adjust the contract when needed, and simplify billing.

After migration, the company receives two invoices: one for energy from Serena Energia and another for distribution from the local distributor. Serena Energia centralizes regulatory complexity, represents the client before the CCEE (Electric Energy Commercialization Chamber) in the retail model, and handles payment to the distributor, reducing the risk of disconnection for financial reasons.

This centralization simplifies the finance team’s daily routine and frees time for results analysis. A dedicated consultant monitors the contract, clarifies doubts, and supports performance monitoring.

Step 5: results monitoring

Goal: verify the achieved savings, compare with the captive market, and identify adjustment opportunities.

Serena Energia provides a digital dashboard with information such as monthly invoice savings, total consolidated savings, comparison between captive and free energy markets, monthly consumption forecast, and consumption to date. Periodic monitoring enables contractual adjustments and energy‑efficiency projects based on real data.

Captive market × free energy market: comparison

Criterion

Captive market

Free energy market (Serena Energia)

Supplier choice

No, local distributor mandatory

Yes, company chooses the retailer

Energy price

Regulated by ANEEL, subject to tariff flags

Agreed in advance in a bilateral contract

Budget predictability

Low, annual adjustments and unpredictable flags

High, fixed price for the contracted term

Energy source

No indication of renewable source

100% renewable, with I‑REC issuance

Regulatory management

Distributor manages

Serena Energia manages, in the retail model

Potential savings

Cost reference

Up to 20% compared to the regulated market*

*Data provided by Serena Energia based on its client portfolio.

By understanding these differences, the company can more clearly evaluate the migration benefits before moving on to the detailed step‑by‑step.

Common mistakes and how to avoid them

Starting the process without a complete consumption history. Without the last 12 months of data, the feasibility analysis is incomplete and the contract may be under‑ or over‑sized. Gather the invoices before the first meeting with the retailer.

Not involving Operations and Legal areas from the beginning. Meter adaptation and formalization of CCEE (Electric Energy Commercialization Chamber) registration documents depend on these areas. Internal delays can jeopardize the regulatory deadline.

Ignoring the contractual flexibility range. Consuming outside the contract‑defined range exposes the company to the short‑term market. Active consumption management, with monthly monitoring, is the main way to reduce this exposure.

Choosing a retailer without its own generation. A company that does not have its own generation relies on third‑party energy purchases, which can represent a higher supply risk. Serena Energia is among the largest wind and solar generators in the Americas, with its own backing to cover 100% of the contracted consumption.

Landscape of a renewable energy park at sunset, showing large wind turbines and vast rows of solar panels over hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the supply of the Free Market.

Do not plan ahead. Given the regulatory deadline of six months, the sooner the company starts the process, the sooner it begins to reduce energy OPEX and incorporate this reduction into financial planning.

How to verify the results

Result verification should occur monthly, comparing the free energy market invoice with the projection of what would be paid in the captive market for the same period. The main operational and financial indicators include cost per MWh consumed, accumulated savings since migration, deviation between forecasted and actual consumption, and Scope 2 emissions offset by issued I‑RECs.

Serena Energia's digital dashboard centralizes these indicators in real time, allowing CFOs, Controllers, and ESG Managers to monitor performance without relying on manual reports. A global study conducted by Morgan Stanley finds that more than 80% of companies can measure the returns of sustainability initiatives, linking these initiatives to greater cash flow predictability and lower capital costs. This reinforces the importance of integrated monitoring of financial and sustainability KPIs.

Companies that wish to structure this monitoring can see in practice how to monitor savings in real time with Serena Energia's dashboard.

Advanced options for companies with multiple units or sustainability goals

Companies with multiple delivery points can consolidate energy management of all units under a single partner. This consolidation simplifies billing and provides an aggregated view of consumption and savings. Serena Energia serves companies throughout Brazil in the free energy market, regardless of the number of consumer units.

For companies with public decarbonization targets, combining free market energy contracts with the issuance of I‑RECs (International Renewable Energy Certificates) is a direct way to reduce Scope 2 emissions. Energy Attribute Certificates allow companies to document the renewable origin of the energy consumed in a manner recognized by standards such as RE100, CDP, and CSRD. For Scope 1 and 3 emissions, Serena Energia offers access to carbon credits from certified projects.

A single white wind turbine stands out amidst a dense layer of fog or clouds, illuminated by the soft light of the sunset.
Advanced wind technology enables Serena Energia to capture constant winds at high altitudes, ensuring a clean, stable, and efficient energy source for your business.

Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂, demonstrating the scale and traceability of its renewable generation.

Aerial view of a vast solar plant with long rows of photovoltaic panels capturing the sunset light.
The use of large‑scale solar farms allows capturing energy with maximum efficiency, optimizing credits that drastically reduce the fixed costs of partner companies.

Frequently Asked Questions

Does my company need a minimum consumption to migrate to the free energy market?

There is no minimum consumption. Any Group A company, with medium or high voltage supply, can migrate to the free energy market. Serena Energia conducts the eligibility analysis for free.

How long does the migration process take?

The process takes about six months, as explained in the migration stage. Serena Energia conducts the process steps at no additional cost to the client. Therefore, the sooner the company starts, the sooner it begins to reduce energy OPEX.

Can the migration interrupt the energy supply in my operation?

No. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of energy and network quality. The only change is the energy supplier.

What happens if my consumption varies beyond the contracted amount?

Contracts provide a flexibility range. Consumption outside this range is settled in the short‑term market. Serena Energia's active management monitors consumption monthly to reduce this exposure and guide adjustments when necessary.

How do I‑RECs help my company's ESG goals?

The I‑REC is an international certificate that audibly proves that 1 MWh was generated from a renewable source and injected into the grid. By combining a free market energy contract with the issuance of I‑RECs, a company can declare that its electricity consumption is 100% renewable in sustainability reports, meeting the requirements of investors, customers, and standards such as RE100 and CDP.

Conclusion: what you learned and next steps

Reducing energy OPEX in the free energy market depends on a structured process, with a predictable six‑month timeline and controlled risks when the company works with a partner that has its own generation, regulatory expertise, and a digital monitoring platform. The steps are clear: feasibility analysis, contracting, migration, continuous management, and results monitoring. Common mistakes, such as lack of historical data, lack of internal alignment, and choosing partners without own generation, can be avoided with early planning.

Serena Energia, with over 17 years of history and a position among the largest wind and solar generators created in the Americas, conducts the managed migration process at no additional cost, offers savings of up to 20% on electricity bills, budget predictability, and renewable certification with I‑RECs for ESG goals.

Contact Serena Energia, simulate your discount and direct your energy toward your business growth.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *