How to use a discount simulator on the electricity bill?

Written by: André Lima, Growth, Serena Energia
Key takeaways from this article
-
Group A companies can migrate to the free energy market without construction and without minimum consumption, with greater budget predictability.
-
Serena Energia's simulator calculates, in a few clicks, the potential discount on the electricity bill based on state, distributor and consumption.
-
The migration process is fully conducted by Serena Energia, including registration with CCEE (Electric Energy Commercialization Chamber), measurement adjustment and notification to the distributor.
-
After migration, the company starts consuming 100% renewable energy from Serena Energia, with monthly savings monitoring and the possibility of I-REC certificates.
-
To start the migration and find out how much your company can save, talk to a Serena Energia consultant.
What is the free energy market for companies?
The free energy market is the environment where Group A companies, connected at medium or high voltage, can choose their energy supplier and negotiate price, term and volume directly. In the regulated market, these conditions follow regulated tariffs.
The local distributor remains responsible for the physical delivery of electricity to the consumer unit. The change occurs at the source of the energy and in the contractual conditions that the company negotiates with the supplier.
Serena Energia's simulator
Serena Energia's simulator calculates the potential discount on the electricity bill based on the state, the distributor and the company's monthly consumption. The tool was developed by one of the largest wind and solar power generators created in the Americas, with over 17 years of operation and clients such as Heineken, Cargill and Bayer.

In addition to the calculation, Serena Energia offers managed migration to the free energy market. The team of specialists conducts the entire bureaucratic process, from registration with CCEE (Electric Energy Commercialization Chamber) to measurement system adjustment, at no additional cost to the client. After migration, a dedicated consultant monitors cost reduction month by month.
Before using the simulator, it is necessary to confirm whether the company meets the basic requirements for migration.
Step 1 – Eligibility verification
Confirm Group A classification
The first step is to verify whether the company is connected at medium or high voltage, which classifies it in Group A. This information appears on the energy bills issued by the local distributor. There is no minimum consumption required; simply being classified in Group A makes migration possible.
The person responsible for this verification is usually the controller or the facilities manager, who gathers the latest bills and identifies the tariff modality and the supply voltage level. In companies with multiple consumer units, each unit must be evaluated individually.
Step 2 – How to use the simulator
Enter state, distributor and monthly consumption
With the bills in hand, the next step is to access Serena Energia's simulator and fill in three main fields: the state where the consumer unit is located, the distributor responsible for the supply, and the average monthly consumption in kWh. Business consumption calculators use exactly these data to generate personalized discount estimates.
The simulator's result projects monthly and annual savings based on current market conditions. The CFO or controller can use this figure directly in budget planning to assess the impact on the P&L.
A point of attention is to use the average consumption of the last 12 months to obtain a more representative estimate, especially in operations with seasonality.
Talk to one of our consultants to simulate your company's discount and receive a detailed proposal.
Step 3 – Overview of the migration process
The steps of the process managed by Serena Energia
After the simulation and the decision to migrate, the process follows up to six macro steps, all conducted by Serena Energia, maintaining the previously described no additional cost model.
Feasibility study: Serena Energia analyzes the bills and the company's consumption profile to project savings and present a detailed study with contractual conditions.
Contract closing: based on this study, the contract is signed, typically for five years, with a pre‑agreed price. This fixed price reduces the uncertainty of tariff adjustments and facilitates budget planning.
Registration with CCEE (Electric Energy Commercialization Chamber): after signing, Serena Energia conducts the registration process with CCEE, sending the necessary technical, legal and financial documentation.
Measurement system adjustment: subsequently, Serena Energia coordinates the installation of measurement equipment compatible with the free energy market and validates integration with the distributor.
Notification to the distributor: with the registration and measurement in place, Serena Energia formalizes the termination of the contract with the distributor, respecting the regulatory six‑month deadline.
Entry into the free energy market: at the end of this period, the company begins operating in the free energy market and starts seeing, on the bills, the savings projected in the feasibility study.
Talk to one of our consultants and start the migration process with specialized support.
Step 4 – What to expect after migration
After migration, the company pays for energy at the price contracted with Serena Energia, regardless of tariff adjustments applied in the regulated market. The client receives two invoices: one for energy, referring to the supply from Serena Energia, and another for distribution, referring to the use of the local distributor's network. Serena Energia centralizes the management of this information for the client.
A dedicated consultant monitors cost reduction monthly, with access to a dashboard that displays actual versus forecast consumption, consolidated savings, and a comparison between the regulated market and the free energy market.
Companies with sustainability goals can request Renewable Energy Certificates (I‑RECs) corresponding to consumption and use them in annual reports. International recognition for sustainability certifications has become a relevant competitive differentiator for Brazilian companies. Serena Energia also offers carbon credits for offsetting emissions from other scopes.
Step 5 – Comparison: regulated market versus free energy market
In the regulated market, companies purchase energy with regulated tariffs, unable to negotiate price, term or supplier. Costs are subject to annual adjustments and the application of tariff flags during periods of water scarcity, which hampers long‑term financial planning. Energy supplied in the regulated market does not have certified renewable origin by default.
In the free energy market, the company negotiates price, term and volume directly with the supplier. The price is agreed upon in advance in the contract, which increases budget predictability. Serena Energia provides 100% wind‑source energy, with issuance of I‑RECs for auditable proof of renewable origin. In both models, the local distributor remains responsible for the physical delivery of electricity.

Common mistakes and how to avoid them
The most frequent mistake is postponing the start of the process. Since the migration timeline is six months, companies that wait for the current contract to expire miss out on savings that could occur earlier.
Another recurring mistake is not gathering the last 12 months of bills before the simulation. Incomplete data generate less accurate estimates and can compromise contract negotiations.
The lack of internal alignment between finance, operations and legal areas also delays the process. The recommendation is to designate an internal responsible person, usually the controller or facilities manager, to coordinate documentation and timelines with Serena Energia.
Companies with multiple consumer units need to map each unit separately before starting migration, to assess which fall under Group A and which can be grouped.
How to confirm the results?
Savings confirmation occurs monthly via Serena Energia's dashboard, which shows actual consumption versus monthly forecast, consolidated savings since the start of the contract, invoice breakdown with a comparison between regulated market cost and free energy market cost, and consumption forecast for the upcoming months.
Regular monitoring allows identifying consumption deviations relative to the contracted amount and engaging the dedicated consultant for adjustments when necessary.
Advanced options
Companies with multiple consumer units can migrate each Group A unit independently or assess the possibility of load aggregation. Serena Energia conducts this eligibility analysis at no cost.
For companies with public ESG targets, Serena Energia issues I‑RECs (International Renewable Energy Certificates) for each MWh consumed, auditable proof that the energy is of renewable origin. Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂. Carbon credits from certified projects are also available for offsetting Scope 1 and 3 emissions.

Frequently asked questions
Minh
Can the company migrate to the free energy market?Any company connected at medium or high voltage, classified in Group A, can migrate to the free energy market. There is no minimum consumption required. Serena Energia conducts the eligibility analysis for free, including for companies with multiple consumer units.
How long does the migration process take?
The migration process takes six months, counted from the formal notification to the distributor. During this period, Serena Energia carries out all bureaucratic steps, including registration with the CCEE, adaptation of the measurement system, and organization of documentation, at no additional cost to the client. The sooner the process is started, the sooner the company begins to save.
Does the migration pose any risk to the company's operation?
Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of electricity and the quality of the grid. The only change is the energy supplier. Serena Energia manages the entire process so that the transition occurs without impact on operations.
What happens if the actual consumption differs from the contracted amount?
Contracts in the free energy market provide a consumption flexibility range. If the company consumes outside this range, the difference is settled in the short‑term market. Serena Energia's dedicated consultant monitors consumption monthly and advises adjustments to reduce this exposure.
How do renewable energy certificates work in practice?
For each MWh consumed, Serena Energia can issue an I‑REC (International Renewable Energy Certificate), which tracks the energy from the generating source to the final consumer. This certificate has global recognition and allows the company to declare, in an auditable way, that its electricity consumption is 100% renewable. The I‑REC is the main tool to zero Scope 2 emissions in sustainability reports.
Conclusion
With the information in this guide, any Group A company connected at medium or high voltage has the complete path to calculate the potential discount on the electricity bill using Serena Energia's simulator and complete the migration to the free energy market in up to six months, without construction and without a minimum consumption. Serena Energia takes on the bureaucracy of the process and provides a dedicated consultant for monthly monitoring of results.
Talk to one of our consultants, simulate your company's discount and direct more resources to the growth of your business.

André Lima
We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.
Editor
Leave a comment
Your email address will not be published. Required fields are marked with *
