How to turn fixed costs into variable costs: practical guide

How to turn fixed costs into variable costs: practical guide

Written by: André Lima, Growth, Serena Energia

Key lessons from this article

  • Companies in Group A can convert fixed costs into variable ones by migrating to the free electricity market, reducing the impact of tariff flags.
  • The migration process follows a six‑month regulatory schedule, which includes analysis of 12 months of invoices and adaptation of the metering system, steps carried out by Serena Energia at no additional cost.
  • In the retail model of the free electricity market, the client pays only for what they consume, making electricity a cost directly proportional to the operation and allowing reductions of up to 20%.
  • Beyond electricity, other areas such as cloud computing, variable compensation and outsourcing complement the strategy of variableizing fixed costs.
  • To structure the migration and turn energy cost into a competitive advantage, talk to a Serena Energia consultant.

Prerequisites

The process starts with organizing information and involving the right areas of the company.

Required documents and data: energy invoices from the last 12 months, monthly consumption profile in kWh, current contracted demand and demand peak history.

Internal areas involved: finance or controlling to assess impact on P&L, operations or facilities to ensure supply continuity and technical adequacy and, when applicable, ESG or sustainability to align with decarbonization goals.

Fundamental technical condition: the company must be classified in Group A, connected to the grid at medium or high voltage. There is no minimum consumption requirement to migrate to the free electricity market; it is enough to belong to Group A.

Operational conditions: the consumer unit's metering system must be suitable for hourly measurement. Serena Energia carries out this step at no additional cost to the client.

Process overview

The conversion of fixed costs into variable ones follows four main phases, which connect sequentially.

Phase 1: diagnosis: map the main fixed cost centers, prioritize those with the greatest budget impact and highest flexibility potential.

Phase 2: planning: define the levers to be activated, such as energy, technology and labor, as well as the implementation schedule and internal responsibilities.

Phase 3: implementation: execute contractual and operational changes, highlighting the migration to the free electricity market, which follows a six‑month regulatory process.

Phase 4: monitoring: track financial and operational indicators to verify the effectiveness of changes and identify necessary adjustments.

Talk to one of our consultants to map the specific opportunities for your company.

Step‑by‑step guide

Step 1: verify eligibility and analyze energy consumption profile

The process starts with confirming that the company is in Group A, at medium or high voltage, and gathering the invoices from the last 12 months. The analysis of monthly consumption in kWh shows seasonality, demand peaks and the savings potential in the free electricity market. This analysis serves as the basis for choosing the most suitable contract type.

Aerial view of a vast solar plant with long rows of photovoltaic panels capturing the sunset light.
The use of large‑scale solar plants allows capturing energy with maximum efficiency, optimizing credits that drastically reduce partner companies' fixed costs.

Step 2: choose a retailer and request a feasibility study

Choosing a retailer with its own generation and a consistent track record reduces migration risks. Serena Energia, one of the largest wind and solar power generators created in the Americas, conducts the feasibility study at no cost, projecting the expected savings based on the company's consumption profile. Group A companies that migrate to the free electricity market can achieve reductions of up to 20% compared to the regulated market, depending on consumption profile and contracting conditions.

Landscape of a renewable energy park at sunset, featuring large wind turbines and vast rows of solar panels on hills.
The strategic combination of wind and solar sources maximizes clean energy generation, ensuring greater stability and efficiency for the Free Market supply.

Talk to one of our consultants and request your feasibility study with no obligation.

Step 3: close the energy contract

In the retail model of the free electricity market, the client does not purchase a fixed volume of energy; they set the price they will pay for the energy consumed. At the end of each month, the invoice is calculated by multiplying the contracted price by the actual consumption. This structure turns energy from a fixed cost into a variable cost, directly proportional to the company's production or operation. Contracts usually have a five‑year term, providing price predictability over the period.

A single white wind turbine stands out amid a dense layer of fog or clouds, illuminated by the soft light of the sunset.
Advanced wind technology allows Serena Energia to capture constant winds at high altitudes, providing a clean, stable and efficient energy source for your business.

Step 4: conduct the migration process

The migration involves registering the company with the CCEE (Electric Energy Commercialization Chamber), notifying the local distributor and adapting the metering system. These steps follow the previously mentioned regulatory schedule. Serena Energia fully assumes this process, including the installation of metering equipment, at no additional cost to the client.

Silhouette of several wind turbines aligned along the coast during a colorful sunset, with reflections on the water.
Exploiting natural resources, such as coastal winds, is essential to maintain the scale and sustainability required in the Free Energy Market.

Step 5: complement with other cost‑variability levers

Energy structuring opens space to activate other parallel fronts. Migrating IT infrastructure to SaaS and cloud models is a clear example: Brazilian companies that adopt cloud computing based on operational profile can reduce infrastructure costs by 30% to 50% in the medium term, converting fixed investments into operational expenses proportional to usage. Variable performance‑based compensation and outsourcing of non‑essential functions follow the same logic and replace fixed structures with costs that track business volume.

Step 6: continuously monitor and adjust

Monthly monitoring of results allows comparing current costs with the period before migration, identifying consumption deviations and triggering contractual adjustments when necessary. Serena Energia provides a digital dashboard with monthly savings, consolidated savings, comparison between regulated and free electricity markets, consumption forecast and actual consumption.

Common mistakes and troubleshooting

The most frequent mistakes in migrating to the free electricity market can be avoided with early planning and alignment between finance, operations and legal.

Frequent mistake How to fix
Start the process without gathering 12 months of invoices Request the complete history from the distributor before any feasibility analysis
Underestimate the six‑month migration timeline Start the process as early as possible so savings begin as soon as the regulatory schedule is completed
Not involving operations in the decision Include the plant or facilities manager from the diagnosis phase to align technical requirements
Confusing the two free electricity market invoices with a cost increase Understand that the distributor's invoice (network usage) and the retailer's invoice (energy), when summed, result in a total cost lower than the regulated market
Migrate to cloud without selection criteria for the model Evaluate SaaS for business applications such as CRM and ERP, and IaaS only for critical legacy systems, as recommended for the Brazilian context

A step‑by‑step validation checklist reduces rework: confirm eligibility, gather documentation, validate the feasibility study with finance, align schedule with operations and review the contract with legal before signing.

Results verification

Result confirmation comes from objective indicators that show the effect of migration on cost and operation.

Financial indicators: energy cost per unit produced, in R$/MWh or R$/unit, variation of energy cost relative to actual consumption and monthly comparison between cost in the free electricity market and the projection of what would be paid in the regulated market.

Operational indicators: supply continuity, since the local distributor remains responsible for the physical delivery of energy, metering system compliance and regularity of records in the CCEE (Electric Energy Commercialization Chamber).

Review frequency: monthly for consumption and billing, semi‑annual for contract review and demand projection, and annual for ESG goal assessment and I‑REC issuance.

The main monitoring tools include Serena Energia's digital dashboard and sustainability reports with Renewable Energy Certificates, I‑RECs, issued for each MWh consumed.

Talk to one of our consultants to structure your company's results monitoring.

Advanced options

Companies with multiple consumer units can consolidate energy management into a single contract, which simplifies monitoring and expands negotiating power. Serena Energia serves companies throughout Brazil, with centralized management by

digital platform means.

Organizations with public sustainability goals can combine the free energy market with the issuance of I-RECs and carbon credits to zero Scope 2 emissions and advance the neutralization of other emission sources. Since 2017, Serena Energia has avoided the emission of more than 2.14 million tonnes of CO₂.

Related topics for deeper study include energy demand management, industrial energy efficiency, and corporate decarbonization strategies in Scopes 1, 2, and 3.

FAQ

Can any company in Group A migrate to the free energy market?

Yes. Since January 2024, any company connected at medium or high voltage, belonging to Group A, can migrate to the free energy market, regardless of consumption volume. There is no minimum consumption required. Serena Energia conducts the eligibility analysis at no cost.

How long does the migration process take?

The process follows a six‑month regulatory schedule, the time needed to terminate the contract with the current distributor and complete registration with CCEE (Electric Energy Commercialization Chamber). Serena Energia conducts all steps at no additional cost to the client. Therefore, starting the process as soon as possible is essential to anticipate savings.

Does migration pose any risk to operational continuity?

No. Migration is a commercial and contractual process. The local distributor remains responsible for the physical delivery of energy; the wires, poles, and network quality do not change. The only difference is who sells the energy to the company. Serena Energia also assumes the installation of the necessary metering equipment, at no additional cost.

How does energy become a variable cost in the free energy market?

In the retail model of the free energy market, the client locks in a price per MWh and pays exactly for what they consume. If the operation slows down, the energy cost drops proportionally. In the regulated market, contracted demand generates charges even when consumption is lower. The result in the free energy market is an energy cost directly linked to the company's activity volume.

What are I-RECs and why are they relevant for companies with ESG goals?

The I-REC, International Renewable Energy Certificate, is a global certificate that auditable proves that a certain amount of energy was generated from a renewable source. For each MWh consumed, Serena Energia can issue a corresponding I-REC. This document has international recognition and allows the company to declare 100% renewable energy consumption in sustainability reports, meeting the requirements of investors, regulators, and global supply chains.

Conclusion

The conversion of fixed costs into variable ones follows clear steps and yields measurable results. For Group A companies, consumers of medium and high voltage, migration to the free energy market is the lever with the greatest financial and operational impact available, as it transforms energy from a fixed, unpredictable charge into a cost proportional to actual consumption, with a price agreed in advance and without the fluctuations of tariff flags in the regulated market.

With more than 17 years of history, Serena Energia conducts the entire migration process, from feasibility analysis to continuous management, at no additional cost to the client. This approach allows the company to direct its resources toward business growth. Clients such as Heineken, Cargill, and Bayer are already walking this path with Serena Energia.

Talk to one of our consultants and take the first step to turn your company's energy cost into a competitive advantage.

Redação Serena Energia

André Lima

We are part of Serena, one of the country's leading generators and traders of clean energy, with 15 years of experience connecting people and businesses to sustainable and competitive solutions. Here on the blog, you'll find content on the electricity sector, Free Energy Market, sustainability, and energy transition, with clear explanations to support decisions in your daily life, whether at home or in your business.

Editor

Leave a comment

Your email address will not be published. Required fields are marked with *